Wastewater Connection Fees definition

Wastewater Connection Fees. Current flow capacity tracking at the City’s Wastewater Treatment and Reclamation Facility (WWTRF) indicates that a plant expansion is necessary to support continued growth within the City. The City is initiating design and a construction project to complete a plant expansion in advance of the physical capacity need.
Wastewater Connection Fees shall refer to and mean the fees, if any, due under this Agreement or to be due from customers for connection to the Wastewater Facilities.
Wastewater Connection Fees means the fees and charges, if any, imposed by the District to acquire, construct, equip or expand the capacity of the wastewater facilities of the Utility System for the purpose of paying or reimbursing the equitable share of the capital cost relating to such acquisition, construction, expansion or equipping of capacity of the wastewater facilities of the Utility System or expansion thereof in order to serve new users of the wastewater facilities of the Utility System and new development within the service area of the Utility System, to the extent the same are lawfully levied, collected and pledged. Such Wastewater Connection Fees may include carrying costs associated with the wastewater facilities of the Utility System.

Examples of Wastewater Connection Fees in a sentence

  • Funds are available from MSU Campus Services Funds and Wastewater Connection Fees ($365,000).

  • Adopt a Resolution authorizing that the current Development Impact Fees, including Water and Wastewater Connection Fees and Extension Fees, be reduced to match the current Infill Development Impact FeesB.

  • The table below provides the existing wastewater connection fees:Table 12: Existing Wastewater Connection Fees For the wastewater connection fees, it is recommended that the City review the basis of the charges to eliminate the front footage, commercial building square footage, and the number of hotel/multi-family units.

  • Funds are available from MSU Resources and Wastewater Connection Fees ($2,500,000).

  • MOTION:Motion by Council Member Sierra, seconded by Council Member Connolly approving Resolution No. 16-21 – “A Resolution of the City Council of the City of Buellton, California, Setting Forth Water and Wastewater Connection Fees in the City of Buellton” VOTE:Motion passed by a roll call vote of 5-0.

  • Table 5-6: Proposed Non-residential Wastewater Connection Fees Root Creek Water DistrictFinancial Master Plan 2016 Allocation 69.4%13.6%17.0% GPDCustomer Type per 1,000 sq ftBODmg/lTSSmg/l Table 5‐7 provides the wastewater connection fee for restaurants participating in the Commercial Sewer Fee Program.

  • Adopt a Resolution authorizing that the current Development Impact Fees, including Water and Wastewater Connection Fees, remain in effect until otherwise modified by the City CouncilB.

  • The purpose of this RFP is to find and select a qualified vendor to develop a Development Impact Fee Study and propose Development Impact Fees, Water and Wastewater Connection Fees for the City of Nevada City.

  • Moneys not required to meet such a deficiency shall be deposited to the Wastewater Connection Fees Fund to make up any withdrawal from such Fund pursuant to Sections 4.06(A) hereof (to the extent required by such Section), then to the Reserve Account to make up any deficiency therein, and thereafter to the Rebate Fund to the extent moneys are required to be deposited therein.

  • The Water Connection fees this last year are lower than the Wastewater Connection Fees because some construction was done on existing lots that already had Water and Wastewater Service.


More Definitions of Wastewater Connection Fees

Wastewater Connection Fees. The Developer will be subject to the City’s PFE Policy and the Village 1 Infrastructure Finance Plan for payment of wastewater connection (impact) fees. Neighborhood Parks: Neighborhood parks within the V1SPA will be constructed by developers as part of the V1SPA obligations. The Village 1 Infrastructure Finance Plan includes a neighborhood park fee program for pooling of plan area participant’s funds and shared construction (costs and timing) of neighborhood parks within the plan area. Epick 3 will meet its 0.69 acre obligation for neighborhood parks through 2.0 acres of on-site neighborhood parks. Regional Park: The V1SPA includes a proposed regional park site located at the old Titan Missile Base, which is currently owned by Placer County and used as a County Corporation Yard. The Village 1 Infrastructure Finance Plan includes a regional park fee program for purchasing the property from the County for use as a City regional park site. The Developer will participate in the Plan Area fee program for purchasing the regional park site, and will also pay additional parkland in-lieu fees for 0.69 acres of regional parks into the City’s Public Facilities Element (PFE) regional park fee component for the ultimate programming and construction of the regional park.
Wastewater Connection Fees means the fees and charges, if any, which relate to acquiring, constructing, equipping or expanding the capacity of the System for the purpose of paying or reimbursing the equitable share of the capital cost relating to such acquisition, construction, expansion or equipping of capacity of the System or expansion thereof in order to serve new users of the System, to the extent the same are lawfully levied, collected and pledged. "Wastewater Connection Fees" include those fees and charges traditionally known under Florida law as "impact fees" but shall not include fees and charges imposed for the cost of physically hooking up or connecting to the System.
Wastewater Connection Fees means the fees and charges, if any, which relate to acquiring, constructing, equipping or expanding the capacity of the wastewater facilities of the System for the purpose of paying or reimbursing the equitable share of the capital cost relating to such acquisition, construction, expansion or equipping of excess and unused capacity of the System or expansion thereof in order to serve new users of the wastewater facilities of the System, to the extent the same are lawfully levied, collected and pledged.

Related to Wastewater Connection Fees

  • Water Connection means the point where a water service line attaches to a water main, thereby allowing water to flow from the City’s water system to an individual customer.

  • Sewer connection means the connection of a structure or project to a public sewer system.

  • Storm water or wastewater collection system means piping, pumps, conduits, and any other equipment necessary to collect and transport the flow of surface water run-off resulting from precipitation, or domestic, commercial, or industrial wastewater to and from retention areas or any areas where treatment is designated to occur. The collection of storm water and wastewater does not include treatment except where incidental to conveyance.

  • Water Service Connection means the pipes and fixtures used for the purpose of supplying any premises in the Municipality with water from the Corporation’s water works that is located between the Corporation’s watermain in the street and the street property line abutting the premises so supplied.

  • Connection Fee means a fee charged by a local entity to pay for the costs of

  • Wastewater Facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Wastewater collection system means the sewer and pumping system used for the collection and conveyance of domestic, commercial and industrial wastewater; and

  • Wastewater System means a system of wastewater collection, treatment,

  • Processing Plant means plant systems, located on or off the Leased Premises, that include a gas processing plant, natural gasoline plant, gasoline plant, or other plant where raw unprocessed natural gas is processed to remove or extract Raw Mix from the natural gas stream to produce a Pipeline- Quality Natural Gas or Residue Gas and other products, and the Raw Mix is then either (i) separated by fractionation down to its base components prior to storage and/or transport that meets or conforms to all applicable Gas Processors Association (GPA) Standards and/or Specifications for the commercial sale of each liquefiable hydrocarbon product, or (ii) transported to another plant for separation down to its base components by fractionation prior to storage and/or transport for the commercial sale of each liquefiable hydrocarbon product. Any deductions, costs, or processing fees associated with the removal or recovery of Natural Gas Liquids is strictly limited to only that part of any Processing Plant or facility where Raw Mix is recovered, and if applicable at that plant, also fractionated to their component parts.

  • Wastewater means the spent water of a community. From the standpoint of source, it may be a combination of the liquid and water-carried wastes from residences, commercial buildings, industrial plants, and institutions, together with any groundwater, surface water, and storm water that may be present.

  • Processing facility means an establishment that prepares, treats, or converts tangible personal property into finished goods or another form of tangible personal property. The term includes a business engaged in processing agricultural, aquacultural, or maricultural products and specifically includes meat, poultry, and any other variety of food processing operations. It does not include an establishment in which retail sales of tangible personal property are made to retail customers.

  • Stormwater management system means any equipment, plants,

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Inter-connection Point means interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be:

  • Connection Charge is the sum payable by the Communications Provider in accordance with the Openreach Price List for provisioning of the Service;

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Water user means a person, corporation, or other entity having a right to divert water from the Bear River for beneficial use;

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Connection Assets means that portion of the distribution system used to connect a customer to the existing main distribution system, and consists of the assets between the point of connection on a distributor’s main distribution system and the ownership demarcation point with that customer;

  • Installation Charges means those Charges set out in the Order in relation to installation of the Service and/or any Purchased Equipment, Customer Equipment and/or BT Equipment as applicable.

  • Vending facility means automatic vending machines, cafeterias, snack bars, cart service, shelters, counters, and such other appropriate auxiliary equipment which may be operated by licensed managers and which is necessary for the sale of newspapers, periodicals, confections, tobacco products, foods, beverages, and other articles or services dispensed automatically or manually and prepared on or off the premises in accordance with all applicable health laws and including the vending or exchange of chances for any lottery authorized by State Law and conducted by an agency of a State within such State. [CFR 34, Part 395.1(X)]

  • Customer Interconnection Facilities means all facilities and equipment owned and/or controlled, operated and maintained by Interconnection Customer on Interconnection Customer’s side of the Point of Interconnection identified in the appropriate appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions, or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Service Connection means all cables and equipment required to connect the supply mains to the electrical installation of the consumer at the point of supply;

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Cannabis processing facility means a person that: