Examples of Wind Farm Facility in a sentence
Table 1 describes the costs assumed for work to be performed by PSCo, and funded by the Customer and for the dedicated “sole-use” interconnection facilities installed between the230 kV Point of Interconnection located at Keenesburg Switching Station, and the Customer Wind Farm Facility.
Information Copy – Not for BiddingProject Company shall declare the availability of the Wind Farm Facility as specified below and declared value shall be verifiable to CEB System Control Center through the SCADA system of Wind Farm Facility.
The wind measurement shall consist of wind speed and direction measurements at various heights including the wind speed measurements using two (02) anemometers (one anemometer as a backup) corresponding to the hub height of the wind turbine proposed in this Wind Farm Facility.
CEB shall carry out an annual engineering audit of the Wind Farm Facility, which shall be a comprehensive audit covering all the engineering and related aspects of the Wind Farm Facility.Information Copy – Not for BiddingThe Project Company shall allow the CEB to carry out the annual engineering audit with prior notice and facilitate the same.Schedule 7 - Metering Metering equipment shall consist of one main and one back up system having the same configuration.
All notices, requests, demands and other communications hereunder shall be in writing and shall be delivered personally, mailed by certified or registered mail, postage prepaid, or sent by facsimile, with confirmation of receipt, addressed to such address set forth on the signature page hereto.
The entire extent of the Bon Espirange Substation, including both the Independent Power Producer (IPP) Yard and the proposed Eskom Yard, is located within the authorised Roggeveld Wind Farm Facility site.
These requirements are mainly based on the specific grid connection requirements for interconnecting the proposed Wind Farm Facility.
The North Ridge Wind Farm (Facility) is a proposed 100 megawatt (MW) wind powered electric generating project located within the Towns of Hopkinton and Parishville, St. Lawrence County, New York.
Design of the Wind Farm Facility shall enable it to remain synchronized in the CEB System under voltage unbalance as specified in IEC 60034-1 or Clause 6.5 of IEC 61400-1, whichever is the highest.In addition, under unbalanced fault conditions in the CEB System, Wind Farm Facility shall be capable of withstanding the resulting negative sequence loading and also remain connected to the CEB System, until the fault is cleared.
Following the end of the Initial Period, each annual Pilot Payment to be paid by the project occupant pursuant to the terms of the Pilot Agreement shall be in an amount equal to the amount which would be payable to such Taxing Entity with respect to the Wind Farm Facility if suchWind Farm Facility was owned by the project occupant and not the Agency.