Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and
Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.
Tenant Improvements Defined in Exhibit B, if any.
Restoration means the repair and restoration of the Property after a Casualty or Condemnation as nearly as possible to the condition the Property was in immediately prior to such Casualty or Condemnation, with such alterations as may be reasonably approved by Lender.
demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;
Installation Work means the construction and installation of the System and the start-up, testing and acceptance (but not the operation and maintenance) thereof, all performed by or for Provider at the Premises.
Construction Work means any work in connection with⎯
Demolition works means any physical activity to tear down or break up a structure (or part thereof) or surface, or the like, and includes the loading of demolition waste and the unloading of plant or machinery.
Tenant’s Work means all improvements, alterations, fixture, equipment, and signage installation, and furniture placement necessary or appropriate for the conduct of the Permitted Use, including all work described as Tenant’s Work on Exhibit D, attached (the “Work Letter”).
Landlord Work means the work, if any, that Landlord is obligated to perform in the Premises pursuant to a separate agreement (the “Work Letter”), if any, attached to this Lease as Exhibit C.
Restoration Retainage as used in this Subsection 7.4(b) shall mean an amount equal to 10% of the costs actually incurred for work in place as part of the Restoration, as certified by the Casualty Consultant, until such time as the Casualty Consultant certifies to Lender that Net Proceeds representing 50% of the required Restoration have been disbursed. There shall be no Restoration Retainage with respect to costs actually incurred by Borrower for work in place in completing the last 50% of the required Restoration. The Restoration Retainage shall in no event, and notwithstanding anything to the contrary set forth above in this Subsection 7.4(b), be less than the amount actually held back by Borrower from contractors, subcontractors and materialmen engaged in the Restoration. The Restoration Retainage shall not be released until the Casualty Consultant certifies to Lender that the Restoration has been completed in accordance with the provisions of this Subsection 7.4(b) and that all approvals necessary for the re-occupancy and use of the Property have been obtained from all appropriate governmental and quasi-governmental authorities, and Lender receives evidence satisfactory to Lender that the costs of the Restoration have been paid in full or will be paid in full out of the Restoration Retainage, provided, however, that Lender will release the portion of the Restoration Retainage being held with respect to any contractor, subcontractor or materialman engaged in the Restoration as of the date upon which the Casualty Consultant certifies to Lender that the contractor, subcontractor or materialman has satisfactorily completed all work and has supplied all materials in accordance with the provisions of the contractor’s, subcontractor’s or materialman’s contract, and the contractor, subcontractor or materialman delivers the lien waivers and evidence of payment in full of all sums due to the contractor, subcontractor or materialman as may be reasonably requested by Lender or by the title company insuring the lien of the Security Instrument. If required by Lender, the release of any such portion of the Restoration Retainage shall be approved by the surety company, if any, which has issued a payment or performance bond with respect to the contractor, subcontractor or materialman.
Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;
Contractor’s Equipment means all apparatus, machinery, vehicles and other things required for the execution and completion of the Works and the remedying of any defects. However, Contractor’s Equipment excludes Temporary Works, Employer’s Equipment (if any), Plant, Materials and any other things intended to form or forming part of the Equipment.
Project Improvements means site improvements and facilities that are:
Emergency work means any urgent measures which in the opinion of the Engineer-in-Charge become necessary during the progress of the work to obviate any risk of accident or failure or which become necessary for security.
Remedial Work has the meaning assigned such term in Section 8.10(a).
Base Building Work means the base building work for the Building as described in this Manual.
Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.
Landlord’s Work means the work of constructing the Tenant Improvements.
Restoration Cost has the meaning set forth in Section 5.06.
Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);
Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);