Wireless Site definition

Wireless Site means a location on Public Rights-of-Way selected for the Company’s deployment of Wireless Communications Facilities.
Wireless Site means a location on a Public Highway selected for the Licensee’s deployment of Equipment.
Wireless Site means a location within the City’s ROW selected for the Company’s deployment of Telecommunications Equipment in accordance with the Small Cell Design Guidelines.

Examples of Wireless Site in a sentence

  • Licensor hereby grants to the Licensee a non-exclusive license to use and occupy the ROW throughout Licensor’s territorial boundaries, as these boundaries may be adjusted from time to time due to annexations, to attach, install, operate, maintain, upgrade, remove, reattach, reinstall, relocate, and replace Equipment at each approved Wireless Site (“License”).

  • In the event that the Licensee elects to apply for approval of the unauthorized WCF or Wireless Site in accordance with this Section, any application for approval shall be processed as if the WCF or Wireless Site was never established and there shall be no presumption or assumption that the WCF or Wireless Site is acceptable, appropriate, or necessary to the Licensee’s Network due to its prior existence or prior operation.

  • Licensor, acting in its proprietary capacity as the owner of Municipal Facilities in the Public Highway, hereby grants to Licensee a nonexclusive license (the “Master License”) to use and occupy the Public Highway throughout Licensor’s territorial boundaries, as these boundaries may be adjusted from time to time due to annexations, to attach, install, operate, maintain, upgrade, remove, reattach, reinstall, relocate and replace the Equipment that may be required to operate at each approved Wireless Site.

  • The inventory shall include location of each installation by GIS coordinates, License Site ID #, type of pole used for installation, pole Owner, and designation/type of installation, for each Wireless Site Equipment installation within the ROW.

  • Equipment shall, to the maximum extent feasible, match the appearance and design of exiting Licensor Municipal Facilities adjacent to the Wireless Site, as much as possible, and when not technically practicable that Equipment to use camouflage design techniques including, but not limited to the use of materials, colors, textures, screening, landscaping, or other design options that will blend the Equipment to the surrounding natural setting and built environment.


More Definitions of Wireless Site

Wireless Site means a location within the City’s ROW selected for Zayo’s deployment of Telecommunications Equipment, which shall be installed within the footprint of an area of no more than thirty-six (36) square feet.
Wireless Site means a location in the City Public Rights-of-Way selected for the Licensee’s deployment of Equipment and its Licensee Facility.
Wireless Site means a location on Public Rights-of-Way selected for the Company’s deployment of Wireless Communications Facilities. *Please see City of Greeley Development Code for additional definitions
Wireless Site means a location on Public Rights-of-Way selected for the Company’s
Wireless Site means a location on Public rights-of-way selected by an applicant for deployment of Small Cell Facilities. Permit ProcessMaster License AgreementsAs wireless providers, infrastructure owners or similar entities begin to consider deployment of new small cell networks within Arvada, the first step in that process shall be the execution of a Master License Agreement with the City of Arvada. This agreement shall provide the overall framework for network deployment, permit approvals, and facility installations throughout the City. For further information on the process and procedures for Master License Agreements, go to arvada.org/smallcell. Once the Master License Agreement is in place, applicants may then proceed with their network deployment by seeking approval of Supplemental Site Permits. Supplemental Site PermitsIn an effort to streamline the approval process, the City of Arvada has revised its permitting and approval process for Small Cell Facilities. Under existing regulations for the larger macro sites, providers are required to obtain separate permits for each phase of a project (e.g zoning approval from Planning, Building approval for pole structure and electrical work, and Traffic approval for street closures). The newly revised process requires all review entities to act simultaneously to complete a single review process and fee program rather than separate systems. It is the intent of this process to assist applicants in the timeliness of the review and permitting process which should result in faster installations and increased service capabilities for Arvada residents and businesses. Applicants may seek approval for up to ten (10) Small Cell Facilities at a given time through a Master Permit. Each Wireless Site shall be submitted online separately as a Supplemental Site Permit which will be linked to a Master Permit for processing purposes. Each Supplemental Site Permit request must include the items noted below and included in the submittal checklist as found online at www.arvada.org/smallcell: 1. Information on
Wireless Site means a location selected and approved for Centurylink's deployment of its Facilities.
Wireless Site means a location on ROW selected for the Licensee’s deployment of its Equipment, and includes a WCF and Small Cell Facility.