Zero Depth Entry definition

Zero Depth Entry means a sloped entry into a pool from deck level into the interior of the pool as a means of access and egress.
Zero Depth Entry means a sloped entry into a pool from deck level into the interior of the pool as a means of access and egress. • ANSI/ASA S12.60-2010/Part 1 (R2015),Acoustical Performance Criteria, Design Requirements, and Guidelines for Schools, Part 1: Permanent SchoolsANSI/ASA S12.60-2009/Part 2 (R2014),Acoustical Performance Criteria, Design Requirements, and Guidelines for Schools, Part 2: Relocatable Classroom FactorsAir Conditioning Contractors of America (ACCA)• ANSI/ACCA 10 Manual SPS-2011 (RA 2017); Manual SPS HVAC Design for Swimming Pools and SpasAir Conditioning Heating and RefrigerationInstitute (AHRI)• ANSI/AHRI Standard 910 (I-P), 2014 Standard for Performance Rating of Indoor Pool DehumidifiersUnits• ANSI/AHRI Standard 920 (I-P), 2020 Standard for Performance Rating of Direct Expansion-Dedicated Outdoor Air System Air Movement Control Association (AMCA)• AMCA 201-02 (R2011), Fans andSystemsAmerican Coatings Association (ACA)• Hazardous Materials Identification System (HMIS), 4th EditionAmerican Concrete Institute (ACI)• ACI 302.1R-15, Guide to Concrete Floor and Slab ConstructionAmerican Heart Association (AHA)• American Heart Association (AHA) Guidelines for Cardiopulmonary Resuscitation (CPR) and Emergency Cardiovascular Care (ECC)•• •ANSI/ICC A117.1-2017. Accessible and Usable Buildings and FacilitiesANSI A137.1:2017 American National Standards Specifications for Ceramic TileDeleted: 3Deleted: GlossaryDeleted: Codes,Deleted: ,Deleted: CitedDeleted: 3Deleted: Codes,Deleted: ,Deleted: Referenced in the MAHC AnnexCommented [HMC(45]: CR 3.4-0001Deleted: andDeleted: federal, state, or Deleted: , rules, or ordinances Deleted: , rules, and ordinances Deleted: ¶Deleted: 15

Examples of Zero Depth Entry in a sentence

  • The involvement of Wigan Athletic Community Trust, running regular Kickz training sessions has seen a significant drop in ASB incidents centred on the areas involved.

Related to Zero Depth Entry

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Final Acceptance Date means the date on which Final Acceptance occurs.

  • Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Final closure means the closure of all hazardous waste management units at the facility in accordance with all applicable closure requirements so that hazardous waste management activities pursuant to 35 Ill. Adm. Code 724 and 725 are no longer conducted at the facility unless subject to the provisions of 35 Ill. Adm. Code 722.134.

  • Immature marijuana plant means a marijuana plant that is not flowering.

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Demarcation Point The Demarcation Point shall have the meaning set forth in 47 Digital Subscriber Line Access Multiplexer (DSLAM): Equipment that links End User xDSL connections to a single packet switch, typically ATM or IP. Direct Trunked Transport (DTT): A DS1 or DS3 interoffice facility that connects the CenturyLink Serving Wire Center of the CLEC’s Local Interconnection Entrance Facility or Collocation to the terminating CenturyLink Tandem or End Office used exclusively for the transmission and routing of Telephone Exchange Service and Exchange Access.

  • Initial Environmental Examination or “IEE” means the initial environmental examination for the Project, including any update thereto, prepared and submitted by the Borrower and cleared by ADB;

  • Rear fog lamp means the lamp used to make the vehicle more easily visible from the rear in dense fog;

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Post-closure means the period after the closure of a storage site, including the period after the transfer of responsibility to the competent authority;

  • Deep sedation means a drug-induced depression of consciousness during which patients cannot be easily aroused but respond purposefully following repeated or painful stimulation. The ability to independently maintain ventilatory function may be impaired. Patients may require assistance in maintaining a patent airway, and spontaneous ventilation may be inadequate. Cardiovascular function is usually maintained.

  • Conditional Acceptance means a conditional acceptance by the Liquidity Provider of an extension of the Scheduled Termination Date.

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • Double check valve assembly means an assembly composed of two single, independently acting, check valves including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the water tightness of each check valve.

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • State-certified production means a qualified production

  • Final Financing Order means, the order of the Bankruptcy Court entered in the Chapter 11 Cases after a final hearing under Bankruptcy Rule 4001(c)(2) or such other procedures as approved by the Bankruptcy Court, which order shall be in form and substance reasonably satisfactory to the Agent and from which no appeal or motion to reconsider has been filed, together with all extensions, modifications and amendments thereto, in form and substance satisfactory to the Agent and the Required Lenders, which, among other matters but not by way of limitation, authorizes the Loan Parties to obtain credit, incur the Obligations, and grant Liens under this Agreement and the other Loan Documents, as the case may be, and provides for the super-priority of the claims of the Agent and Lenders, subject to the Carve- Out and Permitted Prior Liens.

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Event data recorder (EDR) means a device or function in a vehicle that records the vehicle's dynamic, time-series data during the time period just prior to an event (e.g., vehicle speed vs. time) or during a crash event (e.g., delta-V vs. time), intended for retrieval after the crash event. For the purposes of this definition, the event data does not include audio and video data.

  • Admin Fax Ext Admin Email: XXXXX@XXXXXXX.XXX Tech ID: 5372811-ERL Tech Name: EXAMPLE REGISTRAR TECHNICAL Tech Organization: EXAMPLE REGISTRAR LLC Tech Street: 000 XXXXXXX XXXXXX Xxxx Xxxx: ANYTOWN Tech State/Province: AP Tech Postal Code: A1A1A1 Tech Country: EX Tech Phone: +1.1235551234 Tech Phone Ext: 1234 Tech Fax: +1.5555551213 Tech Fax Ext: 93 Tech Email: XXXXX@XXXXXXX.XXX Name Server: NS01.EXAMPLEREGISTRAR.TLD Name Server: NS02.EXAMPLEREGISTRAR.TLD DNSSEC: signedDelegation DNSSEC: unsigned >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “registrar Example Registrar, Inc.” Response format: Registrar Name: Example Registrar, Inc. Street: 0000 Xxxxxxxxx Xxx City: Marina del Rey State/Province: CA Postal Code: 90292 Country: US Phone Number: +1.0000000000 Fax Number: +1.3105551213 Email: xxxxxxxxx@xxxxxxx.xxx WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxx Registrar Phone Number: +1.3105551213 Fax Number: +1.3105551213 Email: xxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxxx Registrar Phone Number: +1.3105551214 Fax Number: +1.3105551213 Email: xxxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Technical Contact: Xxxx Geek Phone Number: +1.3105551215 Fax Number: +1.3105551216 Email: xxxxxxxx@xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “NS1.EXAMPLE.TLD”, whois “nameserver (nameserver name)”, or whois “nameserver (IP Address)” Server Name: NS1.EXAMPLE.TLD IP Address: 192.0.2.123 IP Address: 2001:0DB8::1 Registrar: Example Registrar, Inc. WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< The format of the following data fields: domain status, individual and organizational names, xxxxxxx, xxxxxx, xxxx, xxxxx/xxxxxxxx, postal code, country, telephone and fax numbers (the extension will be provided as a separate field as shown above), email addresses, date and times should conform to the mappings specified in EPP RFCs 5730-5734 so that the display of this information (or values return in WHOIS responses) can be uniformly processed and understood. In order to be compatible with ICANN’s common interface for WHOIS (InterNIC), WHOIS output shall be in the format outline above.

  • Transit-oriented facility means a facility that houses a transit station in a manner that promotes transit ridership or passenger rail use.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Open session means a meeting which is held in a place reasonably accessible to members of the public and open to all cit- izens at all times. In the case of a state governmental body, it means a meeting which is held in a building and room thereof which enables access by persons with functional limitations, as defined in s. 101.13 (1).