Zoning requirement definition

Zoning requirement means a regulation or ordinance, which has been adopted by a city, county, township, school district, or any special-purpose district or authority, and which materially affects the operation of a feedlot. Nothing in this chapter shall be deemed to empower any agency described in this subsection to make any regulation or ordinance.[C77, 79, 81, §172D.1; 82 Acts, ch 1199, §92, 96]84 Acts, ch 1219, §7; 89 Acts, ch 83, §31; 95 Acts, ch 43, §7Referred to in §203.1Further definitions, see §159.1 172D.2 Compliance — a defense to nuisance actions.In any nuisance action or proceeding against a feedlot brought by or on behalf of a person whose date of ownership of realty is subsequent to the established date of operation of that feedlot, proof of compliance with sections 172D.3 and 172D.4 shall be an absolute defense, provided that the conditions or circumstances alleged to constitute a nuisance are subject to regulatory jurisdiction in accordance with either section 172D.3 or 172D.4.[C77, 79, 81, §172D.2] 172D.3 Compliance with rules of the department.1. Requirement. A person who operates a feedlot shall comply with applicable rules of the department. The applicability of a rule of the department shall be as provided in subsection 2. A person complies with this section as a matter of law where no rule of the department exists.2. Applicability of rules.
Zoning requirement means a regulation or ordinance, which has been adopted by a city, county, township, school district, or any special-purpose district or authority, and whichmaterially affects the operation of a feedlot. Nothing in
Zoning requirement means any standard, criteria, condition, review procedure, permit requirement or other requirement adopted by a city or county under the authority of ORS chapter 215 or 227 that applies to the approval or siting of a residential facility or residential home. A zoning requirement does not include a state or local health, safety, building, occupancy or fire code requirement. [1989 c.564 §2; 1991 c.801 §6; 2001 c.900 §47; 2005 c.22 §145; 2009 c.595 §174]

Examples of Zoning requirement in a sentence

  • The detailed Zoning requirement described above supersedes the brief requirement outlined in the 2019 QAP.

  • The detailed Zoning requirement described above supersedes the brief requirement outlined in the 2017 QAP.

  • All work shall be in compliance with current Florida Building Code in addition to City Zoning requirement codes and City Ordinances.

  • Applicant Analysis: To fulfill the remaining Inclusionary Zoning requirement, the applicant is proposing to deed-restrict four units in an off-site four-plex.

  • Mr. Raymond Reber stated on Zoning Board of Appeals case 2012-15 for 113 Montrose Point Road, Montrose NY for a Variance to put a portico over the front entrance that would require a Variance of 15.68 feet from a Zoning requirement of 50 feet down to 34.32 feet, this is a type II SEQRA no further compliance required.

  • Mr.Craley stated that since Jordan confirmed he could most likely meet the Zoning requirement for parking by using the Keener Avenue lot for additional parking, he has no need for the Variance.

  • No Inclusionary Zoning – Because an expansion to eighteen (18) units would not include the addition of new Gross Floor Area, and also separately because it would not create ten (10) new units, such an expansion would not include any Inclusionary Zoning requirement.

  • The Inclusionary Zoning requirement is based on the total number of units proposed for a development and whether it is a rental or ownership project.

  • Director of Planning Paul Matarazzo provided a briefing to the Select Board on a requirement by the State for a Multi-family Zoning requirement for MBTA communities; Andover has two MBTA Commuter Rail stations.

  • They do not have tenants yet, so the Zoning requirement to address the criteria at this stage, rather than at the land development stage is not comfortable for them.


More Definitions of Zoning requirement

Zoning requirement means any standard, criteria, condition, review proce- dure, permit requirement or other require- ment adopted by a city or county under the authority of ORS chapter 215 or 227 that ap- plies to the approval or siting of a residential facility or residential home. A zoning re- quirement does not include a state or local health, safety, building, occupancy or fire code requirement. [1989 c.564 §2; 1991 c.801 §6; 2001 c.900 §47; 2005 c.22 §145; 2009 c.595 §174]
Zoning requirement means any standard, criteria, condition, review procedure, permit re-
Zoning requirement means a regulation or ordinance that has been adopted by a city, county, township, school district, or any special-purpose district or authority, that materially affects the operation of a feedlot, dairy farm or poultry production house. . . .” Tenn. Code Ann. § 44-18-101(14).
Zoning requirement means any standard, criteria, condition, review procedure, permit re- quirement or other requirement adopted by a city or county under the authority of ORS chapter 215 or 227 which applies to the approval or siting of a residential facility or residential home. A zoning requirement does not include a state or local health, safety, building, occupancy or fire code re- quirement.
Zoning requirement means a regulation or ordinance, which has been adopted by a city, county, township, school district, or any special-purpose district or authority, and which materially affects the operation of a feedlot. Nothing in this chapter shall be deemed to empower any agency described in this subsection to make any regulation or ordinance.

Related to Zoning requirement

  • Reporting Requirement By January 31, 2017, the District will provide for OCR’s review and approval the Web Accessibility Policy drafted consistent with Item 1.

  • MREL Requirement means the minimum requirement for own funds and eligible liabilities which is or, as the case may be, will be applicable to the Issuer;

  • Reporting Requirements As defined in Section 11.15.

  • Listing Requirements means the Main Market Listing Requirements of Bursa Securities.

  • Monitoring Requirements Schedule means the Schedule containing details of the monitoring arrangements.

  • Rebate Requirement means the amount of arbitrage profits earned from the investment of gross proceeds of Tax-exempt Bonds in nonpurpose investments described in Section 148(f)(2) of the Code and defined as “Rebate Amount” in Section 1.148-3 of the Treasury Regulations, which is payable to the United States at the times and in the amounts specified in such provisions.

  • Applicable Technical Requirements and Standards means those certain technical requirements and standards applicable to interconnections of generation and/or transmission facilities with the facilities of an Interconnected Transmission Owner or, as the case may be and to the extent applicable, of an Electric Distributor, as published by Transmission Provider in a PJM Manual provided, however, that, with respect to any generation facilities with maximum generating capacity of 2 MW or less (synchronous) or 5 MW or less (inverter-based) for which the Interconnection Customer executes a Construction Service Agreement or Interconnection Service Agreement on or after March 19, 2005, “Applicable Technical Requirements and Standards” shall refer to the “PJM Small Generator Interconnection Applicable Technical Requirements and Standards.” All Applicable Technical Requirements and Standards shall be publicly available through postings on Transmission Provider’s internet website.

  • Storage Injection Requirements means all volumes required by the Seller for injection into underground storage, including cushion gas, and for liquification, including fuel used for injection and in liquification plants, or for such other storage projects that may be developed expressly for the protection of supply to high priority users.

  • performance requirement means a requirement that:

  • Default Requirement means the amount specified as being applicable to the Reference Entity in the Standard, or its equivalent in the relevant Obligation Currency (or, if no such amount is specified, U.S.$ 10,000,000 or its equivalent in the relevant Obligation Currency) in either case, as of the occurrence of the relevant Credit Event.

  • MREL Requirements means the laws, regulations, requirements, guidelines, rules, standards and policies relating to minimum requirements for own funds and eligible liabilities applicable to the Issuer and/or the Group, from time to time, (including any applicable transitional or grandfathering provisions), including, without limitation to the generality of the foregoing, any delegated or implementing acts (such as regulatory technical standards) adopted by the European Commission and any regulations, requirements, guidelines, rules, standards and policies relating to minimum requirements for own funds and eligible liabilities adopted by the Federal Republic of Germany or the Republic of Italy, a relevant resolution authority or the European Banking Authority from time to time (whether or not such requirements, guidelines or policies are applied generally or specifically to the Issuer and/or the Group), as any of the preceding laws, regulations, requirements, guidelines, rules, standards, policies or interpretations may be amended, supplemented, superseded or replaced from time to time.

  • Zoning map means a map, adopted as part of a land use ordinance, that

  • Applicable effluent standards and limitations means all State and Federal effluent standards and limitations to which a discharge is subject under the Act, including, but not limited to, effluent limitations, standards of performance, toxic effluent standards and prohibitions, and pretreatment standards.

  • Applicable requirement means all of the following as they apply to emission units in a source requiring an air quality operating permit (including requirements that have been promulgated or approved by the Department or the administrator through rule making at the time of issuance of the air quality operating permit, but have future-effective compliance dates, provided that such requirements apply to sources covered under the operating permit):

  • REIT Requirements has the meaning set forth in Section 5.2.

  • Pretreatment requirements means any substantive or procedural requirement related to pretreatment, other than a pretreatment standard, imposed on an industrial user.

  • Insurance Requirements means, collectively, all provisions of the Insurance Policies, all requirements of the issuer of any of the Insurance Policies and all orders, rules, regulations and any other requirements of the National Board of Fire Underwriters (or any other body exercising similar functions) binding upon each Loan Party which is an owner of Mortgaged Property and applicable to the Mortgaged Property or any use or condition thereof.

  • Operational requirements means the need to ensure that the Agency is to be operated as effectively, efficiently and economically as possible.

  • Minimum Balance Requirements The minimum balance to open the account is $5.00. If the balance falls below $5 at any time, the account may be closed. See Balance Computation Method above. Fees and Charges; Other Requirements: See our Schedule of Fees at xxxxxxx.xxx/xxxx. Dividends: See Disclosures Concerning Dividends above. Current rates are disclosed on the Credit Union’s website.

  • Maintenance Requirements shall have the meaning set forth in Clause 14.2;

  • Risk Retention Requirements means the credit risk retention requirements of Section 15G of the Exchange Act (15 U.S.C. §78o-11), as added by Section 941 of the Xxxx-Xxxxx Xxxx Street Reform and Consumer Protection Act.

  • Performance Requirements The ordering entity reserves the right to inspect and verify that all deliveries are in accordance with specifications, both at the point of delivery and at the point of use. For orders that specify an “authorized party” to receive and inspect deliveries and/or installations, acceptance and inspection procedures must be performed by the” authorized party” to be considered and accepted by the ordering entity. Products inspected at the time of use are subject to refusal and return requirements for issues of quality such as defects in manufacturing and/or workmanship. Products will not be considered accepted by the ordering entity until the installation is complete for the applicable products.

  • Design requirements means the written description of the infrastructure facility to be procured pursuant to this article, including:

  • Environmental Requirement means any Environmental Law, agreement or restriction, as the same now exists or may be changed or amended or come into effect in the future, which pertains to any Hazardous Material or the environment including ground or air or water or noise pollution or contamination, and underground or aboveground tanks.

  • Program Requirements means certain minimum program entry requirements as well as ongoing program requirements, to be fulfilled by Partner, some of which are general PartnerEdge requirements, some of which are specific for the “Sell Engagement” and some of which are specific for the different “Cloud” Product Families, including, without limitation payment of the Program Fee(s), meeting certain minimum annual revenue requirements, upholding a Sell Authorization for at least one “Cloud” Product Family and other requirements as set out in detail in the PartnerEdge Program Guide and the RSPI.

  • Minimum Requirements means the minimum requirements for available commercial structures. The minimum requirements may be found at this link: https://portlandgeneral.com/energy- choices/renewable-power/green-future-impact The minimum requirements may be updated from time to time to reflect PGE’s criteria from its latest Commission accepted renewable request for proposals.