Loading Rate Klausul Contoh

Loading Rate. Min. 250 KL/hour 7. Discharging Rate; or Pressure : Min. 200 KL/hour/grade; or Pressure Min. 3 Kg/Cm2 8. Type of Cargo : OIL PRODUCT / WHITE OIL (Premium/Pertamax/Pertamax Turbo/Kerosene/Pertalite/Solar/Biosolar/Pertadex/Dexlite/Fame) 9. Cargo Tank Capacity (98%) : Min. 3,000 KL 10. Grade of Cargo : Min. 2 (dua) Grade 11. Cargo Heating: Not Required 12. Cargo Oil Tank Coating: Not Required 13. Cargo Pump : Min. 2 (dua) Unit 14. Xxxxxxx/Xxxxx : Not Required 15. Segregated Ballast Tank : Required 16. Alat Ukur Termasuk Tank Table : Lengkap, Akurat, Absah, Tank Table Di-approve oleh fungsi PSP sebelum delivery 17. Trading Area : Indonesian Water 18. CCTV : Min. 2 (dua) Units, Required (NVR dengan spesifikasi minimal Camera System 8 Channel, 200/240 fps, real time display, snapshot with scheduler, support protocol FTP, SFTP, SMTP). Location: Left Wing & Right Wing 19. Vessel Tracking : Required (Compatible with Pertamina Vessel Tracking) 20. Information System : a. Internet on Board (Online 24 Hours), VSAT 384 Kbps, Commited Information Rate (CIR) 1:1. b. Report With IPMAN System. 21. PSA : Required & Valid During Contract Period with notations as follows: a. On Charter; or For Charter; or Suitable For Charter. b. Multigrade Operation. c. Suitable For Cargo With Flash Point Below 60 Degree Celcius. 22. Fuel : MFO (LSFO/HSFO) / MDO / HSD / Biosolar (Pertamina spec. & subject to supply availability) 23. Lube Oil / Fresh Water : Pertamina Group's Product (Recommended) 24. Delivery Port : OTM Merak (Tentative) 3/2/2021 10:13:56 AM say : D. KETENTUAN TEKNIS - Pembatasan Penawaran Pengadaan Umum 1. Bagi penyedia jasa yang sedang bersengketa dengan Pertamina, baik di dalam pengadilan maupun di luar pengadilan atau yang sedang dikenakan sanksi administratif oleh Pertamina, tidak diperkenankan untuk mengikuti pengadaan. Sesuai keputusan Manajemen Pertamina, bagi penyedia jasa yang bertindak selaku ship owner, ship management atau pengelola kapal pada pengadaan sewa kapal yang sedang berlangsung termasuk tapi tidak terbatas pada pengadaan sebelumnya atau pengadaan lainnya, yang kapalnya melakukan pencurian bahan bakar atau muatan, mengalami insiden kebakaran, tabrakan (collision), oil pollution atau kejadian lain yang mempengaruhi kinerja dan kredibilitas Pertamina sesuai ketentuan yang berlaku, dikategorikan ke dalam penyedia jasa yang masih terlibat permasalahan dengan Pertamina. Dengan demikian, terhadap penyedia jasa tersebut (termasuk afiliasinya) tidak diperkenank...
Loading Rate. Min. 2000 KL/hrs 18. SEGREGATED BALLAST TANK : Required 19. TRADING AREA: Asian Water (including but not limited to Japan, Korea, China, Taiwan, Vietnam and India) and Indonesian Water. 20. Vessel Tracking: AIS & GPS connected and Compatible with Pertamina Vessel Tracking 21. UNIT : 1 (Satu) Unit 22. CHARTER PERIODE: 6 (enam) bulan, Option 3 + 3 Bulan 23. LAY CAN: 25-26 Juni 2024 24. Delivery Port: 1 SP/SB - Singapore/Tg. Bin/Tg. Pelepas/Tg. Langsat/Tg. Pengerang /Brunei Range 25. Lube Oil / Fresh Water: Pertamina Group's Product ( Recommended ) 26. Fuel: MFO (LSFO / HSFO) / MDF / LSMGO / HSD / Biosolar /(Pertamina spec & subject to supply availability) xxxxxx.putra xxxxxx.putra 27. Alat ukur termasuk Tank Table: Akurat, Lengkap, Absah,dan Verifikasi fungsi HSSE, selambatnya sebelum Delivery 28. CCTV : Min. 5 (five) units, Required (NVR with min camera system 8 Channel, 200/240 fps, real time display, snap shoot with scheduler, support protocol FTP,SFTP, SMTP). Min. penyimpanan 31 hari & Night mode/Infrared required. 29. Transport Loss ( % ): max 0,07 30. Information System: a. Internet On Board ( Online 24 jam ) VSAT 384 Kbps, Commited Information Rate (CIR) 1:1 b. Penyampaian laporan kapal melalui IPMAN system dan/atau xxx.xx dan/atau VIP (Veson)" 31. PSA: Required and valid during contract period with multi grade notation & Suitable for cargo operation below 60 degrees 32. HSSE Plan: Required 33. 3 (three) Last Cargo: Clean Product 34. Derrick/Crane: Min. 1 (one) set SWL 10 ton 35. Chain Stopper: Required 36. Terminal Approval: 1. Singapore, Malaysia & Charterer’s Nominated Terminal 2. Oil Major Approval / Valid SIRE 3. TMSA Compliance Minimum Stage 2" 37. Charter Party Form: Pertamina Time 38. Redelivery: 1 SP/SB Indonesia Range 39. TKDN : Min. 34%
Loading Rate. Min. 1,400 M3/hour 09. Discharge Rate (min) or Pressure: Min. 900 m3/h/grade or 7 Kg /cm2 10. Type Of Cargo : Black Oil (HSFO/LSFO) / Decant Oil / Crude Oil / LSWR 11. Cargo Tank Capacity 98% (min) : Min. 25.000 m3 12. Grade Of Cargo : 2 (two) Grade 13. Cargo Heating : Min. Maintain and heat up 60° C 14. Cargo Oil Tank Coating : Not Required asrianda xxxxxxxx@xxxxxxxxx.xxx 15. Cargo Pump (min) : Min. 2 (two) Pumps 16. Xxxxxxx / Xxxxx (min) : Required, min. SWL 10 ton 17. Segregated Balast Tank : Required 18. Alat Ukur Tank Table : Lengkap, Akurat, Absah, Verifikasi oleh fungsi Ship Performance sebelum delivery 19. Transport Discrepancy % : Max. 0.07% 20. Trading Area : Asian Water 21. Unit : 1 (satu) 22. Charter Period : 6 (enam) bulan, opsi 3 (tiga) + 3 (tiga) bulan 23. Laycan : 24 - 26 Maret 2022 24. CCTV : 1. 5 (five) Units. VSAT dan CCTV (NVR dengan spesifikasi minimal Camera System 8 Channel, 200/240 fps, Real Time Display, Snapshot with Scheduler, support Protocol FTP, SFTP,SMTP) 2. Location : Front Right Wing, Front Left Wing, Back Right Wing, Back Left Wing, Cargo Control Room 25.
Loading Rate. Min 200 KL/Grade/hours

Related to Loading Rate

  • DAFTAR LAMPIRAN Lampiran Halaman

  • LOKASI DAN PERIHAL HARTANAH Hartanah tersebut adalah sebuah unit apartment yang beralamat pos di Unit No. 00, Xxxxxxx 0, Xxxx X, Xxxxx Xxxxxxx, Xxxxxx Xxxxxx Xxx Xxxx 0, Xxxxx Xxxxxx Xxxxxxxx, 00000 Xxxxxxxx, Xxxxx.