Cargo Pump. Min. 2 Unit
Cargo Pump. Min. 3 (three) Unit 14. Discharging Rate; or Pressure : Min. 500 KL/hour/grade; or Pressure Min. 7 Kg/Cm2 15. Loading Rate : Min. 1,000 KL/hour 16. Segregated Ballast Tank : Required 17. Trading Area : Indonesian Water 18. Vessel Tracking : AIS & GPS connected and Compatible with Pertamina Vessel Tracking 19. Delivery Port (tentative) : Balikpapan (tentative) 20. Lube Oil/Fresh Water : Pertamina Group's Product (Recommended) 21. Fuel : MFO (LSFO/ HSFO) / MDF / HSD / Biosolar (pertamina spec & subject to supply availability) 22. Alat Ukur Termasuk Tank Table : Akurat, Lengkap, Absah dan Verifikasi fungsi Vessel and Cargo Performance selambatnya sebelum Delivery. 23.
Cargo Pump. Min. 2 (Two) Units 16. Discharge Rate : Min. 750 CuM/jam/grade or press 7 kg/cm2 17. Loading Rate: Min. 1500 CuM/jam 18. Segregated Ballast Tank: Required 19. Trading Area: Indonesian Water 20. Unit: 1 ( Satu ) Unit 21. Charter Period: 1 (satu) tahun, Option 6 + 6 Bulan 22. Lay Can: 4 - 5 Juli 2024 23. Delivery Port: Cilacap (Tentative) 24. Lube Oil / Fresh Water: Pertamina Group's Product ( Recommended ) 25. Fuel MFO (LSFO / HSFO) / MDF / HSD / Biosolar (pertamina spec & subject to supply availability) 26. Alat Ukur Termasuk Tank Table: Akurat, Lengkap, Absah,dan Verifikasi fungsi HSSE, selambatnya sebelum Delivery 27. CCTV : Min. 5 (five) units, Required (NVR with min camera system 8 Channel, 200/240 fps, real time display, snap shoot with scheduler, support protocol FTP, SFTP, SMTP) 28. Transport Loss ( % ): max 0,07 29. Information System:
a. Internet On Board ( Online 24 jam ) VSAT 384 Kbps, Commited Information Rate (CIR) 1:1
b. Penyampaian laporan kapal melalui IPMAN system" 30. Vessel Tracking: AIS & GPS connected and Compatible with Pertamina Vessel Tracking 31.Pertamina Safety Approval (PSA) / SIRE: Required and valid during contract period with multi grade notation & Suitable for oil with flash point below 60 degrees celcius 32. HSSE Plan: Required 33. TMSA: TMSA Compliance Min. Stage 2 34. 3 (three) Last Cargo: Clean Product 35. Chain Stopper: Required 36. TKDN : Min. 34% 6/7/2024 10:26:54 AM say : Prebid meeting akan kami lanjutkan dengan penjelasan persyaratan CSMS Full Cycle dan HSSE Plan dari user, untuk mas Komang dipersilahkan. xxxxxx.putra xxxxxx.putra
A. HSSE MANAGEMENT SYSTEM 1. KEPEMIMPINAN & AKUNTABILITAS
a. Keterlibatan Manajemen Dalam Mempromosikan Aspek HSSE
i. Program Management Walk Through (MWT) ii. Program HSSE Meeting iii. Program kampanye HSSE iv. Program untuk mensosialisasikan dan menerapkan 15 Shipping Life Saving Rules (SLSR) PT PIS b. Penghargaan & Sanksi Aspek HSSE komang.xxxxxxxx xxxxxx.praditya@perta xxxx.xxx 6/7/2024 10:31:12 AM say : 3. ORGANISASI, TANGGUNG JAWAB, SUMBER DAYA DAN DOKUMENTASI
a. Struktur Organisasi, Tugas dan Tanggung Jawab
Cargo Pump. Min. 2 (dua) Unit 15. Discharging Rate; or Pressure : Min. 750 KL/hour/grade; or Pressure Min. 7 Kg/Cm2 16. Loading Rate : Min. 1500 KL/hour 17. Segregated Ballast Tank : Required 18. Trading Area : Indonesian Water 19. Vessel Tracking : AIS & GPS connected and Compatible with Pertamina Vessel Tracking 20. Delivery Port : Cilacap (Tentative) 21. Lube Oil/Fresh Water : Pertamina Group's Product (recommended) 22. Fuel : MFO (LSFO / HSFO) / MDF / HSD / Biosolar (pertamina spec & subject to supply availability) 23. Alat Ukur Termasuk Tank Table: Akurat, Lengkap, Absah,dan Verifikasi fungsi VCP, selambatnya sebelum Delivery 24. CCTV : Minimum 5 (five) units, Required (NVR IP min camera system 8 Channel, 200/240 fps, real time display, snap shoot with scheduler, support protocol FTP, SFTP, SMTP) 25. Information System:
a. Internet On Board (Online 24 hours VSAT 384 Kbps, Committed Information Rate (CIR) 1:1 b. Report with IPMAN system 26. PSA : Required & Valid During Contract Period with notations as follows:
a. On Charter; or For Charter; or Suitable For Charter.
b. Multigrade Operation.
c. Suitable For Cargo With Flash Point Below 60 Degree Celcius.