2Spadefoot Toad Preconstruction survey Sample Clauses

2Spadefoot Toad Preconstruction survey g the additional work. Spade foot toads are only apparent during a small window of 4-8 weeks every year. Surveys for the two sites (San Jacinto River Bridge nd Overflow Channel Bridge areas) where they may occ r are recommended to be done at the time of year when the toads may be visible rather than the 30 days before construction. Surveying at other times of year will not be effective. Surveys will be conducted by a qualified bi logist a survey report prepared. Please see the attached budget spreadsheet for the cost to conduct the preconstruction survey. At the time this scope of work was prepared, the project is in the Draft EIR stage and the specific mitigation plan has not yet been prepared and it is uncertain how many spade foot toads (if any) exist in the project area. Typically mitigation for toa s requires exclusion fencing around the project area and daily monitoring to ensure toads are not entering the area, the exclusion fencing is intact, and removing any found in the project area. HDR has included an additional 100 biologist hours (beyond those identified for the xxxxx above) to support spade foot toad mitigation efforts as needed. If additional mitigation support beyond the 100 hours is needed, an
AutoNDA by SimpleDocs

Related to 2Spadefoot Toad Preconstruction survey

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Preconstruction Services During the Design & Preconstruction Phase, the Design-Builder shall provide such design and preconstruction services as are necessary to properly advance the Project. Without limiting the generality of the foregoing, during the Preconstruction Phase, the Design-Builder shall: (i) work with its Architect and any design consultants to advance the design for the Project in consultation with Client Agency, the Department and its Program Manager; (ii) obtain bids from trade subcontractors to perform the work described in the Design Development Documents and provide bid tabulations to the Department; (iii) engage in any value engineering and scoping exercises necessary to return the cost of the work to the Project Budget; (iv) engage in preconstruction activities, including identifying any long-lead items; (v) develop a GMP proposal for the Project; and (vi) enter into a GMP for the Project. Throughout the Design & Preconstruction Phase, the Design-Builder shall schedule and attend regular meetings with the Department, the Program Manager and the Architect. A list of preconstruction deliverables is set forth in Exhibit C.

  • Architect/Engineer (A/E) means a person registered as an architect pursuant to Tex. Occ. Code Xxx., Chapter 1051, as a landscape architect pursuant to Tex. Occ. Code Xxx., Chapter 1052, a person licensed as a professional engineer pursuant to Tex. Occ. Code Xxx., Chapter 1001 and/or a firm employed by Owner or a design-build contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Preconstruction Conference Prior to, or concurrent with, the issuance of the Notice to Proceed with Construction, a conference will be convened for attendance by the Owner, Contractor, A/E and appropriate Subcontractors. The purpose of the conference is to establish a working understanding among the parties as to the Work, the operational conditions at the Project Site, and general administration of the Project. Topics include communications, schedules, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, maintaining required records and all other matters of importance to the administration of the Project and effective communications between the project team members.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.

  • Name Collision Occurrence Assessment 6.2.1 Registry Operator shall not activate any names in the DNS zone for the Registry TLD except in compliance with a Name Collision Occurrence Assessment provided by ICANN regarding the Registry TLD. Registry Operator will either (A) implement the mitigation measures described in its Name Collision Occurrence Assessment before activating any second-­‐level domain name, or (B) block those second-­‐level domain names for which the mitigation measures as described in the Name Collision Occurrence Assessment have not been implemented and proceed with activating names that are not listed in the Assessment. 6.2.2 Notwithstanding subsection 6.2.1, Registry Operator may proceed with activation of names in the DNS zone without implementation of the measures set forth in Section 6.2.1 only if (A) ICANN determines that the Registry TLD is eligible for this alternative path to activation of names; and (B) Registry Operator blocks all second-­‐level domain names identified by ICANN and set forth at <xxxx://xxxxxxxx.xxxxx.xxx/en/announcements-­‐and-­‐ media/announcement-­‐2-­‐17nov13-­‐en> as such list may be modified by ICANN from time to time. Registry Operator may activate names pursuant to this subsection and later activate names pursuant to subsection 6.2.1. 6.2.3 The sets of names subject to mitigation or blocking pursuant to Sections 6.2.1 and 6.2.2 will be based on ICANN analysis of DNS information including "Day in the Life of the Internet" data maintained by the DNS Operations, Analysis, and Research Center (DNS-­‐OARC) <xxxxx://xxx.xxx-­‐xxxx.xxx/xxxx/xxxx/xxxx>. 6.2.4 Registry Operator may participate in the development by the ICANN community of a process for determining whether and how these blocked names may be released. 6.2.5 If ICANN determines that the TLD is ineligible for the alternative path to activation of names, ICANN may elect not to delegate the TLD pending completion of the final Name Collision Occurrence Assessment for the TLD, and Registry Operator’s completion of all required mitigation measures. Registry Operator understands that the mitigation measures required by ICANN as a condition to activation of names in the DNS zone for the TLD may include, without limitation, mitigation measures such as those described in Section 3.2 of the New gTLD Name Collision Occurrence Management Plan approved by the ICANN Board New gTLD Program Committee (NGPC) on 7 October 2013 as found at <xxxx://xxx.xxxxx.xxx/en/groups/board/documents/resolutions-­‐ new-­‐gtld-­‐annex-­‐1-­‐07oct13-­‐en.pdf>.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Inspection/Testing In order to assess Supplier’s work quality and/or compliance with this Order, upon reasonable notice by Buyer: (a) all goods, materials and services related to the items purchased hereunder, including, raw materials, components, assemblies, work in process, tools and end products shall be subject to inspection and testing by Buyer, its customer, representative or regulatory authorities at all places, including sites where the goods are made or located or the services are performed, whether at Supplier’s premises or elsewhere; and (b) all of Supplier’s facilities, books and records relating to this Order shall be subject to inspection by Buyer or its designee. If specific Buyer and/or Buyer’s customer tests, inspection and/or witness points are included in this Order, the goods shall not be shipped without an inspector’s release or a written waiver of test/inspection/witness with respect to each such point; however, Buyer shall not be permitted to unreasonably delay shipment; and Supplier shall notify Buyer in writing at least twenty (20) days prior to each of Supplier’s scheduled final and, if applicable, intermediate test/inspection/witness points. Supplier agrees to cooperate with such/audit inspection including, completing and returning questionnaires and making available its knowledgeable representatives. Buyer’s failure to inspect or test goods, materials or services or Buyer’s failure to reject or detect defects by inspection or testing shall not relieve Supplier from its warranty obligations or any of its other obligations or responsibilities under this Order. Supplier agrees to provide small business as well as minority and/or women owned business utilization and demographic data upon request.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!