Absorber Design (Review Sample Clauses

Absorber Design (Review for current design) The absorber design is based on use of sieve trays which optimize the absorber cost, performance, and pressure drop. The sieve tray absorber requires recirculation of weak acid to the top tray and a substantial air flow through the absorber to establish sealed trays prior to gauze light-off. El Dorado 11/29/12
AutoNDA by SimpleDocs

Related to Absorber Design (Review

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Development Plan As defined in Section 3.2(a).

  • Timeline a. Year 1: 20[***] (spring) plant SG and evaluate herbicides. CERES-NOBLE Schedule BMP for switchgrass Confidential Treatment Requested and the Redacted Material has been separately filed with the Commission

  • Project Plan Based on the Project Specifications, Omnicare CR has provided a description of services to be performed for Sponsor’s “A multi-center, randomized, double-blind, double-dummy, vehicle-controlled sequential cohort study to determine the safety of PEP005 0.025% and 0.05% topical gel in patients with actinic keratoses” (hereinafter “the Project”) and associated costs. Changes made in the Project scope, at any time during the Project, will result in a corresponding adjustment to the Project costs.

  • Development Work Do, or cause to be done, such development and other work as may be reasonably necessary to protect from diminution and production capacity of the Mortgaged Property and each producing well thereon.

  • Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.

  • Scope of Work The Service Provider is to provide the Customer with the following services (the “Services”): Company Administration. The services will include any other tasks which the Customer and the Service Provider may agree on.

  • Development Program A. Development Activities to be Undertaken (Please break activities into subunits with the date of completion of major milestones)

  • Maintenance Program LESSEE's Maintenance Program

  • Development Plans 4.3.1 For each Licensed Indication and corresponding Licensed Product in the Field, Licensee will prepare and deliver to Licensor a development plan and budget (each a “Development Plan”). The initial Development Plans for each Licensed Indication will be delivered within […***…] after the Grant Date for such Licensed Indication.

Time is Money Join Law Insider Premium to draft better contracts faster.