Acceleration test device Sample Clauses

Acceleration test device. The trolley shall be so propelled that its total velocity change V is 51 km/h km/h. The trolley shall remain horizontal during the acceleration. The acceleration of the trolley shall be achieved by using the apparatus complying with the performance hereafter specified: The acceleration curve of the trolley, weighted with inert mass, shall remain within the hatched area of the graph in Annex 8, and stay above the segment defined by the coordinates 10 g, 5 ms and 20 g, 10 ms. The start of the impact (T0) is defined, according to ISO 17 373 (2005) for a level of acceleration of 0.5 g. In no case shall the total mass of the trolley and vehicle structure and inert masses differ from the nominal value for calibration tests by more than ±40 kg. During calibration of the acceleration test device, trolley’s total velocity change V shall be 51 km/h km/h. Despite the fulfilment of the above requirements, the Technical Service shall use a mass of trolley (equipped with its seats), as specified in paragraph 1. of Annex 6, greater than 380 kg.
AutoNDA by SimpleDocs
Acceleration test device. The trolley shall be so propelled that its total velocity change V is 51 km/h  2 km/h. The trolley shall remain horizontal during the  0 acceleration. The acceleration of the trolley shall be achieved by using the apparatus complying with the performance hereafter specified: The acceleration curve of the trolley, weighted with inert mass, shall remain within the hatched area of the graph in Annex 8, and stay above the segment defined by the coordinates 10 g, 5 ms and 20 g, 10 ms. The start of the impact (T0) is defined, according to ISO 17 373 (2005) for a level of acceleration of 0.5 g. In no case shall the total mass of the trolley and vehicle structure and inert masses differ from the nominal value for calibration tests by more than ±40 kg. During calibration of the acceleration test device, trolley’s total velocity change V shall be 51 km/h  2 km/h.
Acceleration test device. The trolley shall be so propelled that its total velocity change V is 51 km/h  2 km/h. The trolley shall remain horizontal during the  0 For Public Comment Only acceleration. The acceleration of the trolley shall be achieved by using the apparatus complying with the performance hereafter specified: The acceleration curve of the trolley, weighted with inert mass, shall remain within the hatched area of the graph in Annex 8, and stay above the segment defined by the coordinates 10 g, 5 ms and 20 g, 10 ms. The start of the impact (T0) is defined, according to ISO 17 373 (2005) for a level of acceleration of 0.5 g. In no case shall the total mass of the trolley and vehicle structure and inert masses differ from the nominal value for calibration tests by more than ±40 kg. During calibration of the acceleration test device, trolley’s total velocity change V shall be 51 km/h 2 km/h.

Related to Acceleration test device

  • Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • Test conditions 6.1.1. The test shall be performed on a flat, dry concrete or asphalt surface affording good adhesion.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Reasonable Suspicion Testing The Employer may, but does not have a legal duty to, request or require an employee to undergo drug and alcohol testing if the Employer or any supervisor of the employee has a reasonable suspicion (a belief based on specific facts and rational inferences drawn from those facts) related to the performance of the job that the employee:

  • Network Interface Device (NID) 2.7.1 The NID is defined as any means of interconnection of end-user customer premises wiring to BellSouth’s distribution plant, such as a cross-connect device used for that purpose. The NID is a single-line termination device or that portion of a multiple-line termination device required to terminate a single line or circuit at the premises. The NID features two independent xxxxxxxx or divisions that separate the service provider’s network from the end user’s customer-premises wiring. Each chamber or division contains the appropriate connection points or posts to which the service provider and the end user each make their connections. The NID provides a protective ground connection and is capable of terminating cables such as twisted pair cable.

  • Non-Paid Status During Treatment After Positive Test The employee will be in a non-pay status during any absence for evaluation or treatment, while participating in a rehabilitation program.

Time is Money Join Law Insider Premium to draft better contracts faster.