Air Quality Management Plan and Greenhouse Gas Reduction Plan Sample Clauses

Air Quality Management Plan and Greenhouse Gas Reduction Plan. An Air Quality Plan has been prepared for the Xxxxxxx Hills project which requires the implementation of project-specific emission reductions, consistent with General Plan Policy AQ-4. The Air Quality Plan is provided as Appendix “E” of the Draft SPA Master Plan (see Attachment “A”). Through design features detailed in the AQMP, the Xxxxxxx Hills’ project would result in approximately 35% less ozone precursor emissions than a business as usual project design. PLNP2008-00142 XXXXXXX HILLS PLNP2008-GPB-SDP-ZOB-AHP-00142 SS:ss:gvc A Greenhouse Gas (GHG) Reduction Plan, provided as Appendix “D” of the Draft SPA Master Plan (see Attachment “A”) has been prepared for the project which includes project features designed to reduce GHG emissions directly or indirectly, per development standards and design guidelines described in the Xxxxxxx Hills SPA. With all the committed strategies in the Xxxxxxx Hills GHG Plan, the project will achieve cumulative annual emissions of 147,386 Metric Tons (MT) or 5.80 MT per capita, well under the overall target of 6.86 annual MT of Carbon Dioxide equivalent per capita. This reduction represents a 43.04% reduction over the Business as Usual (BAU) scenario. Additional results of this analysis are provided below.  In the Residential Sector under BAU, Xxxxxxx Hills will generate 1.50 MT per capita of GHG. By requiring several GHG reduction measures including constructing all units 20% above Title 24 (2008) and requiring a minimum of 20% renewable energy generation for the overall residential usage, Xxxxxxx Hills will achieve 1.18 metric tons (MT) per capita which is below the threshold target of 1.3 annual MT of Carbon Dioxide equivalent emissions.  In the Commercial/Industrial Sector, under BAU, Xxxxxxx Hills will generate Carbon Dioxide Equivalent emissions of 6.32 annual MT per kft2. That is less than Sacramento County’s GHG emissions target of 8.08 annual MT of Carbon Dioxide equivalent per kft2. By requiring all buildings to be constructed 20% better than Title 24 requirements (2008), Xxxxxxx Hills will achieve 5.75 MT. The 5.75 annual MT per kft2 equates to 0.62 MT per capita.  In the Transportation Sector under BAU, Xxxxxxx Hills will emit 8.01 annual MT of Carbon Dioxide equivalent emissions, compared to the target emissions threshold of 4.56 annual MT. With GHG committed reduction strategies, Xxxxxxx Hills will generate 4.02 MT per capita, which is less than the threshold target of 4.56 annual MT of Carbon Dioxide equival...
AutoNDA by SimpleDocs

Related to Air Quality Management Plan and Greenhouse Gas Reduction Plan

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Quality Assurance Plan The contractor shall develop and submit to NMFS a contractor Quality Assurance Plan, as referenced in Section F.5.3, which details how the contractor will ensure effectiveness and efficiency of collection efforts as well as the quality of data collected by its At-Sea Monitors. The contractor shall further establish, implement, and maintain a Quality Assurance Management program to ensure consistent quality of all work products and services performed under this contract.

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Staffing Plan 8.l The Board and the Association agree that optimum class size is an important aspect of the effective educational program. The Polk County School Staffing Plan shall be constructed each year according to the procedures set forth in Board Policy and, upon adoption, shall become Board Policy.

  • OVATIONS FOOD SERVICES, L.P. dba SPECTRA All food and beverage service must be discussed with and approved by Spectra, the OCFEC Master Concessionaire. FORM F-31 AGREEMENT NO. R-026-18 DATE May 16, 2018 REVIEWED APPROVED RENTAL AGREEMENT FAIRTIME INTERIM XX THIS AGREEMENT by and between the 32nd District Agricultural Association dba OC Fair & Event Center, hereinafter called the Association, and B & L Productions, Inc. hereinafter, called the Rentor

  • Quality Management Grantee will:

Time is Money Join Law Insider Premium to draft better contracts faster.