AMBIENT SITE CONDITIONS Sample Clauses

AMBIENT SITE CONDITIONS. Notwithstanding anything to the contrary contained in this Agreement, the Seller shall not be liable for any delay in conducting or continuing all or any part of the Commissioning Tests, to the extent that the Engineer certifies that such delay has been caused by (and only by) the non- availability of the minimum necessary quantity of solar irradiation required to conduct and continue the Commissioning Tests and, in such event, the Required Commercial Operation Date shall be extended on a Day-to-Day basis so as to fully reflect the delay caused by the non- availability of the minimum necessary quantity of irradiation.
AutoNDA by SimpleDocs

Related to AMBIENT SITE CONDITIONS

  • Site Conditions A. Existing Site Conditions: Information with respect to the site of the Work given in drawings or specifications has been obtained by County's representatives and is believed to be reasonably correct, but the County does not warrant either the completeness or accuracy of such information, and it is the responsibility of the Contractor to verify all such information.

  • INCLEMENT CONDITIONS Section 1.

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • Unsafe Conditions In accordance with 29 CFR § 1977, occasions might arise when an employee is confronted with a choice between not performing assigned tasks or subjecting himself/herself to serious injury or death arising from a hazardous condition at the workplace. If the employee, with no reasonable alternative, refuses in good faith to expose himself/herself to the dangerous condition, he/she would be protected against subsequent discrimination. The condition causing the employee's apprehension of death or injury must be of such a nature that a reasonable person, under the circumstances then confronting the employee, would conclude that there is a real danger of death or serious injury and that there is insufficient time, due to the urgency of the situation, to eliminate the danger by resorting to regular statutory enforcement channels. In addition, in such circumstances, the employee, where possible, must also have sought from his Employer, and been unable to obtain, a correction of the dangerous condition.

  • Safe Conditions Whenever an employee reports a condition which the employee feels represents a violation of safety or health rules and regulations or which is an unreasonable hazard to persons or property, such conditions shall be promptly investigated. The appropriate administrator shall reply to the concern, in writing, if the employee's concern is communicated in writing.

  • SUSPENSIVE CONDITIONS 18.1 The Contract is subject to the suspensive condition that the Purchaser obtains a loan in the amount reflected in clause 7 of the SCHEDULE, forming part of the Purchase price payable by the Purchaser to the Seller for the Property, from a bank or other financial institution, against the security of a first mortgage bond over the Property in favour of such bank or financial institution, such loan to be approved in writing by such bank or financial institution within the period stipulated in clause 9 of the SCHEDULE.

  • Differing Site Conditions (a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of (1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract, or (2) unknown physical conditions at the site(s), of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.

  • Space Conditions All pipes passing through floors, walls, and ceilings shall be installed with sufficient space between them to permit installation of pipe insulation and floor, wall, and ceiling plates without cutting of insulation or plates. Roughed-in dimensions shall be prepared by the Contractor to accomplish this requirement. The Contractor shall locate all equipment that must be serviced, operated, or maintained in fully accessible positions. This provision includes but is not limited to valves, traps, cleanouts, motors, controllers, switchgear, drain points, filter, access doors, and fire dampers. If spaces, dimensions, or other design conditions do not permit compliance with the present article, the Contractor shall file a request in writing with the Design Professional for additional instructions, furnishing a copy to the Owner.

  • Contract Conditions This section contains conditions which shall be complied with during the performance of this contract. The conditions come in two parts, general conditions and special contract requirements.

  • PROJECT CONDITIONS A. The Grantee agrees to the following Project Conditions: