Asphalt Wearing Surface Sample Clauses

Asphalt Wearing Surface. After the binder course installation, the roadway surface shall be paved with an asphaltic concrete pavement wearing surface after applying an asphalt tack coat conforming to TDOT specification 403. Immediately thereafter the surface course shall be applied. The surface course shall conform to TDOT specification 411D, 1 ½ inches thick.
AutoNDA by SimpleDocs

Related to Asphalt Wearing Surface

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Alpine Areas The employer shall pay an Alpine disability allowance of $2.50 per hour worked on projects in alpine areas.

  • Porcupine Site Highway 11

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Horizontal Movement The Board encourages all unit members to improve their skills through advanced training and, as an inducement thereto, provides extra compensation for those who do so successfully. The Board delegates to the Superintendent the responsibility for assuring that unit members comply with the following regulations when claiming credit for advanced studies.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

Time is Money Join Law Insider Premium to draft better contracts faster.