Bbbee and Preferencing Scheme 4 Procurement Sample Clauses

Bbbee and Preferencing Scheme 4 Procurement 
AutoNDA by SimpleDocs

Related to Bbbee and Preferencing Scheme 4 Procurement

  • BBBEE and preferencing scheme Specify constraints which Contractor must comply with after contract award in regard to any Broad Based Black Economic Empowerment (B-BBEE) or preferencing scheme measures.

  • Unbundled Voice Loops (UVLs) 2.2.1 BellSouth shall make available the following UVLs:

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • Billing for Treatment and Payment Restrictions Grantees will;

  • Funding Restrictions and Order Quantities The Agency reserves the right to reduce or increase estimated or actual quantities in whatever amount necessary without prejudice or liability to the Agency, if:

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • Task Order Funding Restrictions No unfunded TOs are allowed; TOs may be incrementally funded in accordance with FAR and other agency funding restrictions. The Contracting Officer for each order is responsible for closing out the contract action that they issue. Notification that a closeout of an order is complete must be provided to the Procuring Contracting Officer (the Basic Contract) once accomplished. The contractor shall work in partnership with the Government to closeout orders as soon as possible after they are physically complete by using the "Quick Closeout" procedures described in FAR 42.708 as much as practical. In accordance with section 1427(b) of Public Law 108-136 a protest is not authorized in connection with the issuance or proposed issuance of an individual TO except a protest on the grounds that the order increases the scope, period, or maximum value of the contract under which the order is issued; or a protest of an order valued in excess of $10 million. Protests of orders in excess of $10 million may only be filed with the Government Accountability Office, in accordance with the procedures at FAR 33.104. H138 INCORPORATION OF LABOR CATEGORIES AND MAXIMUM LABOR RATES (NOV 2009) Successful offerors Labor Categories and Maximum Labor Rates will be incorporated in the resultant contract as Attachment 5 in Section J and shall be valid for the life of the contract. Applicable to following Labor Hour Line Items: 0300, 1300, 2300, 3300, 4300 H139 SMALL BUSINESS GRADUATE TRANSITION (NOV 2009) This clause is being included in the Application Services Full and Open contracts for informational purposes only.

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

Time is Money Join Law Insider Premium to draft better contracts faster.