Bearing Temperature Detectors Sample Clauses

Bearing Temperature Detectors. Bearing temperature detectors shall be furnished for each bearing of the motor. Each detector shall be complete with a detector head and holder assembly; the detector temperature-sensitive tip shall be hermetically sealed. Where sleeve type bearings are furnished, each detector tip shall be held in intimate contact with the outside diameter of the bearing babbitt not more than 1/8 inch from the shaft surface of the bearxxx. Where plate type (Kingsbury) thrust bearings are furnished, each detector tip shall bx xxxx xx intimate contact with the shoe babbitt not more than 1/8 inch from the runner surface of the shoe. Xxxxxocouple type detectors for bearings shall be insulated.
AutoNDA by SimpleDocs
Bearing Temperature Detectors. Motors shall be provided with one spring loaded tip-sensitive dual element platinum RTD, rated 100 Ohm at 0º C temperature device for each bearing. The scope of supply shall include all required wiring to and a common terminal strip in an auxiliary conduit box separate from the main power leads and space heater leads boxes. It is preferred that all auxiliary temperature, vibration, and space heater boxes be mounted on the opposite side of the motor to the main power lead terminal box.

Related to Bearing Temperature Detectors

  • Temperature The Committed Gas shall not have a temperature of less than forty degrees Fahrenheit (40°F) nor more than one hundred twenty degrees Fahrenheit (120°F).

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

  • Speed (a) The Contract Price shall not be affected or changed by reason of the trial speed (as determined according to the SPECIFICATIONS being less than the guaranteed speed, if such variation is not more than Two-Tenths (2/10) of One (1) knot.

  • Interfaces 1 2 wire i/f (towards PSTN) -------------------------------------------------------------------------------------------------------- 2 2 wire i/f (towards standard handset) -------------------------------------------------------------------------------------------------------- 2.2 FUNCTIONS -------------------------------------------------------------------------------------------------------- 1 Selective Call -------------------------------------------------------------------------------------------------------- 2 Conference Call (up to four participants) ----------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 3 MANAGEMENT COMMUNICATION -------------------------------------------------------------------------------------------------------- 3.1 COMMUNICATION INTERFACES see OPTera Product Description SEC. 5.2.3 - Standard Communications Interfaces and SEC.7.3 - Management Communication -------------------------------------------------------------------------------------------------------- 1 F- Interface (RS 232) -------------------------------------------------------------------------------------------------------- 2 Q- interface as gateway to the EMS -------------------------------------------------------------------------------------------------------- 3 Qecc Routing (2 level IS-IS) -------------------------------------------------------------------------------------------------------- 4 Q I/F (Ethernet) -------------------------------------------------------------------------------------------------------- 5 Optical Supervisory Channel ----------------------------------------------------------------------------------------------------------------------------------- 6 OSC - wavelength IR IR IR see OPTera Product - bitrate Description SEC. 5.2.2 - optical span limit - Per Wavelength - transmission protocol Optical Service Channel and SEC.7.3 - Management Communication ----------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 3.2 O & M INTERFACES ----------------------------------------------------------------------------------------------------------------------------------- 1 8 x Remote Control Inputs ----------------------------------------------------------------------------------------------------------------------------------- 2 Remote Control Outputs ----------------------------------------------------------------------------------------------------------------------------------- 3 Card LED support ----------------------------------------------------------------------------------------------------------------------------------- 4 Subrack LED support ----------------------------------------------------------------------------------------------------------------------------------- 5 Rack Alarm support ----------------------------------------------------------------------------------------------------------------------------------- -----------------------------------------------------------------------------------------------------------------------------------

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Delivery Pressure Seller shall be required to deliver or cause delivery of the Gas to the Point of Delivery and for delivering such Gas at a pressure sufficient to effect such delivery. Notwithstanding anything to the contrary herein, Seller shall have the right but not the obligation to install compression to effect deliveries of Gas hereunder.

  • Compatibility The Spacecraft Bus shall be compatible with standard GPS interfaces as defined in [**Redacted**].

  • Walls Sheetrock (drywall) damage should be patched and fire-taped so that there are no holes in either office or warehouse.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!