Billing - Virtual Collocation Sample Clauses

Billing - Virtual Collocation. 8.5.2.1 Virtual Collocation will be considered complete when the Premises is Ready for Service (RFS). Cooperative testing between CLEC and Qwest may be negotiated and performed to ensure continuity and acceptable transmission parameters in the facility and equipment.
AutoNDA by SimpleDocs
Billing - Virtual Collocation. 8.5.2.1 Virtual Collocation will be considered complete when the Premises is Ready for Service (RFS). Cooperative testing between CLEC and CenturyLink may be negotiated and performed to ensure continuity and acceptable transmission parameters in the facility and equipment.
Billing - Virtual Collocation. 8.5.2.1 Virtual Collocation will be considered complete when the C-POI has been constructed, the shared fiber Collocation entrance facility has been provisioned, and the collocated equipment has been installed. Cooperative testing between CLEC and Qwest may be negotiated and performed to ensure continuity and acceptable transmission parameters in the facility and equipment.
Billing - Virtual Collocation. Virtual Collocation will be considered complete when the POI has been constructed, the shared fiber Collocation entrance facility has been provisioned, and the collocated equipment has been installed. Cooperative testing between NAS and USW may be negotiated and performed to ensure continuity and acceptable transmission parameters in the facility and equipment. Any additional joint testing can be provided under rates and terms specified in this Agreement.

Related to Billing - Virtual Collocation

  • Physical Collocation 31.7.2.1 If additional space for Physical Collocation is immediately available at the time of SBC-AMERITECH’s request, CLEC shall include in its notice to SBC-AMERITECH: (i) the space to be provided, and (ii) whether CLEC can deliver the space to SBC-AMERITECH by the date set forth in Section 31.7.2.3.

  • Transit Traffic The following rates will apply:

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

Time is Money Join Law Insider Premium to draft better contracts faster.