Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant- assisted project in accordance with Section 287.057, Florida Statutes.
Load Shedding The systematic reduction of system demand by temporarily decreasing Load in response to a transmission system or area Capacity shortage, system instability, or voltage control considerations under the ISO OATT. Local Furnishing Bonds. Tax-exempt bonds issued by a Transmission Owner under an agreement between the Transmission Owner and the New York State Energy Research and Development Authority (“NYSERDA”), or its successor, or by a Transmission Owner itself, and pursuant to Section 142(f) of the Internal Revenue Code, 26 U.S.C. § 142(f). Locality. A single LBMP Load Zone or set of adjacent LBMP Load Zones within one Transmission District within which a minimum level of Installed Capacity must be maintained. Local Reliability Rule. A Reliability Rule established by a Transmission Owner, and adopted by the NYSRC to meet specific reliability concerns in limited areas of the NYCA, including without limitation, special conditions and requirements applicable to nuclear plants and special requirements applicable to the New York City metropolitan area. Locational Based Marginal Pricing (“LBMP”). A pricing methodology under which the price of Energy at each location in the NYS Transmission System is equivalent to the cost to supply the next increment of Load at that location (i.e., the short-run marginal cost). The short-run marginal cost takes generation Bid Prices and the physical aspects of the NYS Transmission System into account. The short-run marginal cost also considers the impact of Out-of-Merit Generation (as measured by its Bid Price) resulting from the Congestion and Marginal Losses occurring on the NYS Transmission System which are associated with supplying an increment of Load. The term LBMP also means the price of Energy bought or sold in the LBMP Markets at a specific location.
Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.
Timescale It is recognised that discussions around actual salary increases have a dependency on top level Company decisions. However, it is agreed that more general discussions can start before this point, these will include: The Company providing the latest pay and benefit guidelines/comparators (if updated) By end of January Identify and attempt to agree deviations from information detailed in appendix 4. By 16th March The Company providing information as detailed in Appendix 4 (snapshot as of 1st April) (incorporating any agreed deviations from the standard list) By 10th April Joint team produce cost-model ready for negotiations By end of April Unite Submit and present to the Company negotiating team their annual pay claim By end of April Line Managers completing Appraisals (including Company checking of employees who don’t have a PAC) January – March where possible By end of April in all cases Company provides remainder of appraisal PAC information By 7th May Negotiate non-budget related matters By end May Once the Company decisions referred to above have been made, the pay negotiations can further progress. Steps will be taken earlier where practicable. Stage 1 negotiations Offer voted on by 14th June If required stage 2 negotiations Offer voted on by 30th June If required stage 3 negotiations Offer voted on by 14 th July Guidelines issued to line managers (following discussions between Unite & the Company) By 22nd July Pay planning complete By end July Pay review effective 1st August Company provides UNITE with information, snapshot at 1st August By 10th August Notification of pay review to individuals by managers Before August pay date At the start of the process, UNITE and the company will jointly review the timetable and agree any variations that are required.
Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.
STAFF ORIENTATION 4101 The Employer shall provide an appropriate orientation program for nurses newly employed. The orientation program shall include such essential information as policies, nursing procedures, the location of supplies and equipment, fire, safety and disaster plans. Where necessary, orientation shall be provided for nurses moving to a new area of practice. 4102 The Employer shall provide a program of inservice education for nurses pertinent to patient care. 4103 The Employer shall provide, access to reference materials as is required in relation to maintaining current knowledge of general nursing care. Licensed Practical Nurse 2015 Hourly 25.198 26.022 26.836 27.825 28.732 29.745 30.804 31.420 Monthly 4,231.164 4,369.528 4,506.212 4,672.281 4,824.582 4,994.681 5,172.505 5,275.942 Annual 50,773.970 52,434.330 54,074.540 56,067.375 57,894.980 59,936.175 62,070.060 63,311.300 Nurse II 2015 Hourly 32.917 34.066 35.218 36.419 37.593 38.811 39.587 Monthly 5,527.313 5,720.249 5,913.689 6,115.357 6,312.491 6,517.014 6,647.317 Annual 66,327.755 68,642.990 70,964.270 73,384.285 75,749.895 78,204.165 79,767.805 Nurse II (20 Year Scale) 2015 Hourly 33.575 34.747 35.923 37.148 38.345 39.587 Monthly 5,637.802 5,834.600 6,032.070 6,237.768 6,438.765 6,647.317 Annual 67,653.625 70,015.205 72,384.845 74,853.220 77,265.175 79,767.805 Nurse III 2015 Hourly 34.168 35.321 36.523 37.697 38.787 39.975 41.201 42.025 Monthly 5,737.377 5,930.985 6,132.820 6,329.955 6,512.984 6,712.469 6,918.335 7,056.698 Annual 68,848.520 71,171.815 73,593.845 75,959.455 78,155.805 80,549.625 83,020.015 84,680.375 Nurse III (20 Year Scale) 2015 Hourly 34.851 36.027 37.254 38.451 39.563 40.775 42.025 Monthly 5,852.064 6,049.534 6,255.568 6,456.564 6,643.287 6,846.802 7,056.698 Annual 70,224.765 72,594.405 75,066.810 77,478.765 79,719.445 82,161.625 84,680.375 Nurse IV 2015 Hourly 35.340 36.649 37.959 39.387 41.024 42.612 44.273 45.158 Monthly 5,934.175 6,153.978 6,373.949 6,613.734 6,888.613 7,155.265 7,434.175 7,582.781 Annual 71,210.100 73,847.735 76,487.385 79,364.805 82,663.360 85,863.180 89,210.095 90,993.370 Nurse IV (20 Year Scale) 2015 Hourly 36.047 37.382 38.718 40.175 41.844 43.464 45.158 Monthly 6,052.892 6,277.061 6,501.398 6,746.052 7,026.305 7,298.330 7,582.781 Annual 72,634.705 75,324.730 78,016.770 80,952.625 84,315.660 87,579.960 90,993.370 Nurse V 2015 Hourly 37.305 38.733 40.369 41.957 43.690 45.388 47.157 48.100 Monthly 6,264.131 6,503.916 6,778.628 7,045.280 7,336.279 7,621.402 7,918.446 8,076.792 Annual 75,169.575 78,046.995 81,343.535 84,543.355 88,035.350 91,456.820 95,021.355 96,921.500 Nurse V (20 Year Scale) 2015 Hourly 38.051 39.508 41.177 42.797 44.564 46.296 48.100 Monthly 6,389.397 6,634.052 6,914.305 7,186.330 7,483.038 7,773.870 8,076.792 Annual 76,672.765 79,608.620 82,971.655 86,235.955 89,796.460 93,286.440 96,921.500 Nurse Practitioner 2015 Hourly 42.515 45.635 47.511 49.385 51.408 52.437 Monthly 7,138.977 7,662.877 7,977.889 8,292.565 8,632.260 8,805.046 Annual 85,667.725 91,954.525 95,734.665 99,510.775 103,587.120 105,660.555 Nurse Practitioner (20 Year Scale) 2015 Hourly 43.365 46.548 48.461 50.373 52.437 Monthly 7,281.706 7,816.185 8,137.410 8,458.466 8,805.046 Annual 87,380.475 93,794.220 97,648.915 101,501.595 105,660.555 Weekend Worker - Licensed Practical Nurse 2015 Hourly 28.977 29.925 30.861 31.999 33.042 34.206 35.425 36.133 Monthly 4,865.721 5,024.906 5,182.076 5,373.165 5,548.303 5,743.758 5,948.448 6,067.333 Annual 58,388.655 60,298.875 62,184.915 64,477.985 66,579.630 68,925.090 71,381.375 72,807.995 Weekend Worker - Nurse II 2015 Hourly 37.855 39.176 40.501 41.882 43.232 44.633 45.526 Monthly 6,356.485 6,578.303 6,800.793 7,032.686 7,259.373 7,494.625 7,644.574 Annual 76,277.825 78,939.640 81,609.515 84,392.230 87,112.480 89,935.495 91,734.890 Weekend Worker - Nurse II (20 Year Scale) 2015 Hourly 38.612 39.959 41.311 42.720 44.097 45.526 Monthly 6,483.598 6,709.782 6,936.805 7,173.400 7,404.621 7,644.574 Annual 77,803.180 80,517.385 83,241.665 86,080.800 88,855.455 91,734.890 Weekend Worker - Nurse III 2015 Hourly 39.293 40.619 42.002 43.352 44.605 45.971 47.381 48.329 Monthly 6,597.950 6,820.607 7,052.836 7,279.523 7,489.923 7,719.297 7,956.060 8,115.245 Annual 79,175.395 81,847.285 84,634.030 87,354.280 89,879.075 92,631.565 95,472.715 97,382.935 Weekend Worker - Nurse III (20 Year Scale) 2015 Hourly 40.079 41.431 42.842 44.219 45.497 46.891 48.329 Monthly 6,729.932 6,956.955 7,193.886 7,425.107 7,639.705 7,873.780 8,115.245 Annual 80,759.185 83,483.465 86,326.630 89,101.285 91,676.455 94,485.365 97,382.935 Weekend Worker - Nurse IV 2015 Hourly 40.641 42.146 43.653 45.295 47.177 49.003 50.914 51.932 Monthly 6,824.301 7,077.016 7,330.066 7,605.785 7,921.805 8,228.420 8,549.309 8,720.248 Annual 81,891.615 84,924.190 87,960.795 91,269.425 95,061.655 98,741.045 102,591.710 104,642.980 Weekend Worker - Nurse IV (20 Year Scale) 2015 Hourly 41.454 42.989 44.526 46.201 48.121 49.983 51.932 Monthly 6,960.818 7,218.570 7,476.658 7,757.918 8,080.318 8,392.979 8,720.248 Annual 83,529.810 86,622.835 89,719.890 93,095.015 96,963.815 100,715.745 104,642.980 Weekend Worker - Nurse V 2015 Hourly 42.900 44.543 46.425 48.251 50.244 52.196 54.230 55.315 Monthly 7,203.625 7,479.512 7,795.531 8,102.147 8,436.805 8,764.578 9,106.121 9,288.310 Annual 86,443.500 89,754.145 93,546.375 97,225.765 101,241.660 105,174.940 109,273.450 111,459.725 Weekend Worker - Nurse V (20 Year Scale) 2015 Hourly 43.758 45.434 47.353 49.216 51.249 53.240 55.315 Monthly 7,347.698 7,629.126 7,951.358 8,264.187 8,605.561 8,939.883 9,288.310 Annual 88,172.370 91,549.510 95,416.295 99,170.240 103,266.735 107,278.600 111,459.725 1 Eligibility for the 20 Year increment is determined in accordance w ith Article 2105.
Packaging and Shipping All shipping containers shall be packed and packaged to: (i) ensure safe arrival to final destination; (ii) secure the lowest transportation costs;(iii) comply with requirements of common carriers; (iv) meet Buyer's written instructions; and (v) meet the requirements of all applicable laws, ordinances, rules and regulations.
Orientation Program The Company will allow a designated representative of the Local or Bargaining Unit up to one (1) hour per calendar month for the purpose of conducting the Communications, Energy and Paperworkers Union New Members’ Orientation Program. Such meetings will be conducted during the probationary period of employees, and will be held on Company premises. Employees participating in Orientation Program meetings during their normally scheduled working hours will not suffer loss of pay at their regular rate. Orientation Program meetings will be scheduled by Management and a Management representative may attend as an observer.