Bowed stud walls or ceilings Sample Clauses

Bowed stud walls or ceilings. All interior and exterior frame walls or ceilings have slight variations on the finish surfaces. Walls or ceilings that are bowed more than 1/2-inch within a 32-inch horizontal measurement; or 1/2-inch within any 8-foot vertical measurement, are warranted. Exterior and interior frame walls or ceilings bowed in excess of the allowable standard shall be corrected to meet the allowances spelled out above. Bowed stud walls and ceilings are only covered during the first thirty days of the warranty period. Wood frame walls out of plumb. Wood frame walls that are more than 3/8-inch out of plumb for any 32-inch vertical measurements are a deficiency. Xxxxxx Homes will make necessary repairs to meet the Construction Performance Guidelines. Coverage limited to the first thirty days of the warranty. Wood beam or post is split. Beams or posts, especially those 21/2-inches or greater in thickness, will sometimes split as they dry subsequent to construction. Unfilled splits exceeding 1/4-inch in width and all splits exceeding 3/8- inch in width are warranted. Xxxxxx Homes will repair or replace as required. Filling splits is acceptable for widths up to 3/8-inch. Some characteristics of drying wood are beyond the control of the builder and cannot be prevented.
AutoNDA by SimpleDocs
Bowed stud walls or ceilings. All interior and exterior frame walls or ceilings have slight variations on the finish surfaces. Bowing should not be visible so as to detract from the finished surface. Walls or ceilings should not bow more than one- quarter inch within a 32 inch horizontal or vertical measurement. Exterior and interior frame walls or ceilings bowed in excess of the allowable standard shall be corrected to meet the allowances of the standard.

Related to Bowed stud walls or ceilings

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • School Improvement Plan As permitted under IC § 20-10.2-3-1.5, the Charter shall serve as the Charter School's strategic and continuous school improvement and achievement plan (hereafter, the "School Improvement Plan"). To the extent that IC § 20-10.2 applies to the Charter in its function as the School Improvement Plan, the Organizer shall comply with the requirements under IC § 20-10.2.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

  • Recyclable Materials “Recyclable Materials” means Solid Waste consisting of any material 371 which retains useful properties and can be reclaimed after the production or consumption process.

Time is Money Join Law Insider Premium to draft better contracts faster.