Bridges. 34 Developer shall provide rustication patterns on all bridge barrier walls, bridge piers, and bridge 35 abutment walls in Aesthetic Area 2 in accordance with Exhibits L2.18, L2.19, and L2.21 of the
Appears in 1 contract
Samples: Design Build Maintain Agreement
Bridges. 34 31 Developer shall provide rustication patterns on all new bridge barrier walls, bridge piers, and 32 bridge 35 abutment walls in Aesthetic Area 2 XxxxxxxxxXxxxxxxxx Xxxx 0 in accordance with Exhibits L2.18L2.30, L2.19L2.31, 33 and L2.21 L2.33 of thethe LAADCR. The final designs shall resemble these simulations. Developer shall 34 paint the existing 00xx Xxxxxx bridge with the XxxxxxxxxXxxxxxxxx Xxxx 0 base color. If the 63rd 35 Avenue bridge is replaced, it shall have the same rustication as the existing structure, and
Appears in 1 contract
Samples: Design Build Maintain Agreement
Bridges. 34 35 Developer shall provide rustication patterns on all bridge barrier walls, bridge piers, and bridge 35 36 abutment walls in Aesthetic Area 2 in accordance with Exhibits L2.18, L2.19, and L2.21 of the
Appears in 1 contract
Samples: Design Build Maintain Agreement
Bridges. 34 19 Developer shall provide rustication patterns on all bridge barrier walls, bridge piers, and bridge 35 20 abutment walls in Aesthetic Area 2 1 in accordance with Exhibits L2.18L2.14, L2.19L2.15, and L2.21 L2.17 of thethe 21 LAADCR. The final designs shall resemble these simulations. The 00xx Xxxxxx bridge does not 22 need to be painted to match the Aesthetic Area unless the bridge is modified by Developer’s 23 design.
Appears in 1 contract
Samples: Design Build Maintain Agreement
Bridges. 34 35 Developer shall provide rustication patterns on all bridge barrier walls, bridge piers, and bridge 35 36 abutment walls in Aesthetic CharacterAesthetic Area 2 1 in accordance with Exhibits L2.18L2.14, L2.19L2.15, and L2.21 37 L2.17 of thethe LAADCR. The final designs shall resemble these simulations. The 00xx Xxxxxx 38 bridge does not need to be painted to match the Aesthetic Area unless the bridge is modified by
Appears in 1 contract
Samples: Design Build Maintain Agreement
Bridges. 34 18 Developer shall provide rustication patterns on all bridge barrier walls, bridge piers, and bridge 35 19 abutment walls in Aesthetic Area 2 1 in accordance with Exhibits L2.18L2.14, L2.19L2.15, and L2.21 L2.17 of thethe 20 LAADCR. The final designs shall resemble these simulations. The 00xx Xxxxxx bridge does not 21 need to be painted to match the Aesthetic Area unless the bridge is modified by Developer’s 22 design.
Appears in 1 contract
Samples: Design Build Maintain Agreement