Builder's Supply - Owner's Supply (Architect Sample Clauses

Builder's Supply - Owner's Supply (Architect. 4.1 Those items of equipment identified as Owner's supplies in section 0013 of the Specification will be provided by the Owner (the “Owner Supplies”). Any excess of the relevant agreed weight shall be treated as a modification under Article 24 (in respect of any weight and/or stability impacts). The Builder shall supply all other items of equipment and materials that are required for the construction, outfitting and completion of the Vessel in accordance with this Contract and the Specification. 4.2 The parties will agree to a mutually acceptable schedule for delivery of the Owner's Supplies which takes due account of the Builder's timetable for construction of the Vessel and the time reasonably required by the Owner to obtain the Owner's Supplies. Thereafter the Owner will arrange for the Owner's Supplies to be delivered to the Builder's designated storage facility in accordance with this agreed schedule. The Builder will assist the Owner's representatives in clearing customs and taking delivery at the Builder's storage facility of each shipment of Owner's Supplies. 4.3 The Builder shall be responsible, at its own expense and risk, for keeping the delivered Owner's Supplies safely stored and well protected, and for the careful handling of the delivered Owner's Supplies. 4.4 Subject to Article 4.5, the Builder shall arrange, at its own expense and risk, for the loading, installation and arrangement on board the Vessel (including, without limitation, the framing and mounting of artwork) of the Owner's Supplies, and such loading, and installation and arrangement work shall be covered by the Builder's guarantee under Article 25. 4.5 The Owner shall arrange for proper and timely transmission to the Builder of all data and information required in connection with Owner's Supplies. The Owner shall also arrange and be responsible for its subcontractors providing all customary and necessary activities, assistance, services, supervision and other support in relation to the installation and subsequent testing, pre-commissioning and commissioning of any equipment or machinery items of Owner's Supplies. Upon completion of the installation, testing, pre-commissioning and commissioning of Owner's Supplies, the Owner’s subcontractor shall issue a compliance letter stating (if such be the case) that the work has been completed. 4.6 The Owner's Supplies shall be delivered to the Builder in proper condition for loading, installation or arrangement on board the Vessel. 4.7 Th...
AutoNDA by SimpleDocs

Related to Builder's Supply - Owner's Supply (Architect

  • PRODUCT MANUFACTURER'S SUPPLIERS Only those dealers/distributors listed by the manufacturer will be considered authorized to act on behalf of the Product Manufacturer.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • CONTRACTOR CUSTOMER SERVICE REPRESENTATIVE Contractor shall designate a customer service representative (and inform Enterprise Services of the same) who shall be responsible for addressing Purchaser issues pertaining to this Master Contract.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Contractor Licensing, etc. Notwithstanding Section 14.c, District may terminate this Contract immediately by written notice to Contractor upon denial, suspension, revocation, or non-renewal of any license, permit, or certificate that Contractor must hold to provide services under this Contract.

  • Contractor’s Contract Manager The Contractor’s Contract Manager, who is primarily responsible for the Contractor’s oversight of the Contract performance, will be identified in a separate writing to the Department upon Contract signing in the following format: Contractor’s Contract Manager Name Contractor’s Name Contractor’s Physical Address Contractor’s Telephone # Contractor’s Email Address If the Contractor changes its Contract Manager, the Contractor will notify the Department. Such a change does not require an amendment to the Contract.

  • Quality Control Program Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. Engineer shall submit a plan detailing its program to the Inspection Branch of the TxDOT Bridge Division for review and approval prior to beginning work. State may review or audit the programs.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Phase Services 3.1.1 – Basic Construction Services

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!