Cash Flow Estimate Sample Clauses

Cash Flow Estimate. No later than 14 calendar days after the Commencement Date shall the Consultant submit a schedule specifying on a quarterly basis all projected fees, reimbursable expenses and VAT to be paid by the Client to the Consultant. The cash flow estimate shall be updated semi-annually (per March and September).
AutoNDA by SimpleDocs
Cash Flow Estimate. The Contractor shall furnish to the Engineer, a detailed cash flow estimate together with an “S” curve, in respect of the works, within 28 days from the Commencement Date. This shall be up-dated and submitted every subsequent, three (3) months, thereafter until the completion of the works. SP 13. 4.15 Access Route Add the following sub-clause to the end of Sub-Clause 4.15 of General Conditions 4.15.1If any damage occurs to any bridge or road communicating with or on the routes to the Site arising from the transport of Materials, Equipment or Plant, the Contractor shall notify the Engineer with a copy to the Engineer, as soon as he becomes aware of such damage or as soon as he receives any claim from the authority entitled to make such claim. Where under any law or regulation the hauler of such Materials, Equipment or Plant is required to indemnify the road authority against damage, the Engineer shall not be liable for any costs, charges or expenses in respect thereof or in relation there to.

Related to Cash Flow Estimate

  • Cost Estimate An estimate of the total project cost including but not limited to direct expenses, indirect expenses, land cost, and capital expenses.

  • Volume Estimate The estimated volumes of timber by species designated for cutting under B2.3 and expected to be cut under Utilization Standards are listed in A2. If Sale Area Map indicates that there are incom- pletely Marked subdivisions, the objective of Forest Ser- vice shall be to designate for cutting in such subdivisions sufficient timber so that Sale Area shall yield the ap- proximate estimated volume by species or species groups stated in A2. However, the estimated volumes stated in A2 are not to be construed as guarantees or limitations of the timber volumes to be designated for cut- ting under the terms of this contract. Volume adjustments shall not be made under this Section after there is modification for Catastrophic Dam- age under B8.32.

  • Cost Estimates If this Agreement pertains to the design of a public works project, CONSULTANT shall submit estimates of probable construction costs at each phase of design submittal. If the total estimated construction cost at any submittal exceeds ten percent (10%) of CITY’s stated construction budget, CONSULTANT shall make recommendations to CITY for aligning the PROJECT design with the budget, incorporate CITY approved recommendations, and revise the design to meet the Project budget, at no additional cost to CITY.

  • Construction Cost Estimate At 50% completion of the contract documents, the design team will present and submit copies of the project plans and manual. The Construction Administrator will prepare and issue the fourth of five construction cost estimates. The estimate shall be derived from actual takeoffs, subcontractor and vendor input, and material and labor cost data. All quantitative systems information shall be provided in detail.

  • Estimates and Reconciliation of Estimates Where estimated expenditures are used to determine the amount of the drawdown, the State will indicate in the terms of the State unique funding technique how the estimated amount is determined and when and how the State will reconcile the difference between the estimate and the State's actual expenditures.

  • Cost Estimating The Model may be used to develop cost estimates based on the approximate data provided and conceptual estimating techniques (e.g., volume and quantity of elements or type of system selected).

  • Operating Costs The Assuming Institution agrees, during its period of use of any Leased Data Management Equipment, to pay to the Receiver or to appropriate third parties at the direction of the Receiver all operating costs with respect thereto and to comply with all relevant terms of any existing Leased Data Management Equipment leases entered into by the Failed Bank, including without limitation the timely payment of all rent, taxes, fees, charges, maintenance, utilities, insurance and assessments.

  • Estimate The Engineer shall independently develop and report quantities necessary to construct the contract in standard State bid format at the specified milestones and Final PS&E submittals. The Engineer shall prepare each construction cost estimates using Estimator or any approved method. The estimate shall be provided at each milestone submittal or in DCIS format at the 95% and Final PS&E submittals per State’s District requirement.

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).