CLEANING CULVERTS Sample Clauses

CLEANING CULVERTS. Purchaser shall clean the inlets and outlets of all culverts and shall obtain written approval from the Contract Administrator before beginning hauling activities or rock application.
AutoNDA by SimpleDocs
CLEANING CULVERTS. On the following road(s), Purchaser shall clean the inlets and outlets of all culverts before timber haul or rock placement.
CLEANING CULVERTS. On the following road(s), Purchaser shall clean the inlets and outlets of all culverts and shall obtain written approval from the Contract Administrator before start of timber haul. On the following road(s), Purchaser shall clean and/or construct ditches, headwalls, and catchbasins. Work must be completed before the start of timber haul and must be done in accordance with the Typical Section Sheet. Pulling ditch material across the road or mixing in with the road surface is not allowed. Ditchlines, headwalls, and catch basins shall not encroach into the existing road. PA-S-1030 0+00 – 17+00 Right Ditching PA-S-1030 16+25 & 16+75 Right Catch Basin Install
CLEANING CULVERTS a. The County will thaw frozen culvert pipes as in the past. The Town’s cooperation in clearing snow from critical culvert pipes and ditches will be needed to prevent washouts during a thaw.
CLEANING CULVERTS. On listed Prehaul Maintenance roads, Purchaser shall clean the inlets and outlets of all culverts and shall obtain written approval from the Contract Administrator before timber haul. On listed Prehaul Maintenance roads, Purchaser shall clean ditches, headwalls, and catchbasins. Work must be completed before timber haul and must be done in accordance with the TYPICAL SECTION SHEET and the CULVERT AND DRAINAGE SPECIFICATION. SECTION 3 CLEARING, GRUBBING, AND DISPOSAL
CLEANING CULVERTS. On the following roads, Purchaser shall clean the inlets and outlets of all culverts. 5129 0+00 to 22+51 5120A 0+00 to 21+25 5124 0+00 to 12+00
CLEANING CULVERTS. On the following road(s), Purchaser shall clean the inlets and outlets of all culverts before timber haul. R‐130 18+15, 25+90 R‐158 9+45, 19+42 On the following road(s), Purchaser shall clean ditches, headwalls, and catchbasins. Work must be completed before timber haul or rock placement and must be done in accordance with the TYPICAL SECTION SHEET. R‐120 0+00 to 23+50 R‐158 0+00 to 4+40
AutoNDA by SimpleDocs
CLEANING CULVERTS. On the following road(s), all inlets and outlets of culverts shall be cleaned before the start of timber haul and shall be subject to the written approval of the Contract Administrator. On the following road(s), Purchaser shall clean and/or construct the ditches, headwalls, and catch basins. Work shall be completed before the start of timber haul and shall be done in accordance with the Typical Section Sheet. Pulling ditch material across the road or mixing in with the road surface will not be allowed. Ditchlines, headwalls, and catch basins shall not encroach into the existing road. D-5095.4 3+00 – 14+35 Left Ditching D-5096.2 6+00 – 10+75 Right Ditching D-5096.2 15+55 – 27+65 Right Ditching D-5096.2 21+50 Right Catch Basin Install
CLEANING CULVERTS. All inlets and outlets of culverts shall be cleaned before the haul of timber and shall be subject to the written approval of the Contract Administrator.
CLEANING CULVERTS. On the following road, Purchaser shall clean the inlets and outlets of all culverts and shall obtain written approval from the Contract Administrator before timber haul. On the following road, Purchaser shall cut vegetative material up to 4 inches in diameter, including limbs, as shown on the ROADSIDE BRUSHING DETAIL. Brushing must be achieved by manual or mechanical cutting of brush, trees, and branches. Root systems and stumps of cut vegetation may not be disturbed unless directed by the Contract Administrator. Purchaser shall remove brushing debris from the road surface, ditchlines, and culvert inlets and outlets. Purchaser shall fall all vegetative material larger than 2 inches DBH or over 4 feet high between the marked right-of-way boundaries, or if not marked in the field, between the clearing limits specified on the TYPICAL SECTION SHEET. Clearing must be completed before starting excavation and embankment.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!