CN SITE READINESS Sample Clauses

CN SITE READINESS. This review shall confirm the readiness of each site to accept delivery and installation of the CN equipment. • Facilities Requirement Specification(s); 2 Acceptance Site
AutoNDA by SimpleDocs

Related to CN SITE READINESS

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.

  • Air Conditioning 35.01 Landlord shall make available to Tenant, and Tenant shall be permitted to use, the base Building equipment presently supplying air-conditioning service to the Premises and any replacements thereof (the “Existing HVAC Equipment”) Monday to Friday from 8:00 a.m. to 6:00 p.m. (i) during the Building’s “Cooling Season” (which is currently May 15 through October 15) for those portions of the Existing HVAC Equipment serving the perimeter portions of the Premises, and (ii) three hundred sixty-five (365) days a year for those portions of the Existing HVAC System serving the interior portions of the Premises, in each instance subject to and in accordance with the provisions of this Article. Landlord represents that as of the date hereof the Existing HVAC Equipment is in working order and has a cooling capacity which is appropriate for normal office use and normal occupancy density, to wit: the Existing HVAC Equipment is designed to make available a capacity of one (1) ton of HVAC per 300 usable square feet, and is designed to deliver a summer-winter temperature of between 72 and 78 degrees Fahrenheit. Landlord shall repair and maintain the Existing HVAC Equipment in good working order and condition, at Landlord’s cost and expense; provided, however, that all other air conditioning systems, equipment and facilities hereafter located in or servicing the Premises (the “Supplemental Systems”) including, without limitation, the ducts, dampers, registers, grilles and appurtenances utilized to distribute conditioned air within the Premises in connection with both the Existing HVAC Equipment and/or the Supplemental Systems (collectively hereinafter referred to as the “HVAC System”), shall be maintained, repaired and operated by Tenant in compliance with all present and future laws and regulations relating thereto at Tenant’s sole cost and expense. The parties acknowledge that as of the date hereof there is a two (2) ton water cooled supplemental air conditioning unit installed at the Premises (the “Existing Supplemental System”). Landlord hereby approves, in concept only, subject to Tenant’s compliance with the applicable provisions of this Lease including, without limitation, the provisions of this Article and of Article 8, above, Tenant’s installation, at Tenant’s sole cost and expense, of an additional three (3) ton supplemental air conditioning unit (or, should Tenant elect to remove the Existing Supplemental System, then Tenant’s installation of a five (5) ton supplemental air conditioning unit) to service the Premises (the “Additional Supplemental System”). Tenant shall pay for all electricity consumed in the operation of the HVAC System (and/or water, gas and steam) for the production of chilled and/or condenser water and its supply to the Premises, if applicable, which shall become the obligation of Tenant subject to the terms of Article 41 of this Lease. Tenant shall pay for all parts and supplies necessary for the proper operation of the HVAC System (other than the Existing HVAC Equipment) (and any restoration or replacement by Tenant of all or any part thereof shall be in quality and class at least equal to the original work or installations); provided, however, that Tenant shall not alter, modify, remove or replace the HVAC System, or any part thereof, without Landlord’s prior written consent, except that Tenant may remove the Existing Supplemental System in conjunction with Tenant’s installation of a five (5) ton replacement unit as contemplated hereinabove.

  • Delivery Location The Aircraft shall be located at the agreed Delivery Location;

  • Heat and Air-Conditioning Landlord shall provide and maintain heat, ventilation and air-conditioning (“HVAC”) equipment sufficient to maintain the Premises at comfortable temperatures for general office use, subject to all federal, state and municipal regulations, during Normal Building Operating Hours (as defined in the Rules and Regulations) and subject to compliance by Tenant with the following and the provisions of Section 6.2.4. If Tenant shall require HVAC at times other than Normal Building Operating Hours, Landlord may furnish such service and Tenant shall pay therefor such charges as may from time to time be in effect. If the temperature otherwise maintained in any portion of the Premises by the HVAC system is affected as a result of (i) the type or quantity of any lights, machines or equipment used by Tenant in the Premises, (ii) the occupancy of any portion of the Premises by more than one person per two hundred (200) square feet of rentable area, (iii) an electrical load for lighting or power in excess of the limits specified in Section 6.2.4, or (iv) any partitioning or other improvements installed by Tenant, then at Tenant’s sole cost, Landlord may install any equipment, or modify any existing equipment Landlord deems necessary to restore the temperature balance. Tenant agrees to keep closed, when necessary, blinds or other window treatments which, because of the sun’s position, must be closed to provide for the efficient operation of the air conditioning system, and Tenant agrees to cooperate with Landlord and to abide by the reasonable regulations and requirements which Landlord may prescribe for the proper functioning and protection of the HVAC system. Landlord shall have no responsibility for providing any service from Separate HVAC Equipment, as defined in Section 6.1.3.

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).

  • TECHNICAL SUPPORT SERVICES 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Work Location While employed by the Company hereunder, the Executive shall perform his duties (when not traveling or engaged elsewhere in the performance of his duties) at the offices of the Company in Bermuda. The Executive shall travel to such places on the business of the Company in such manner and on such occasions as the Company may from time to time reasonably require.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

Time is Money Join Law Insider Premium to draft better contracts faster.