Collection System Cabling Sample Clauses

Collection System Cabling. The Parties acknowledge that OYA may desire to route certain wires, cables, conduits and/or lines (and their associated equipment) related to the transmission of electricity at a voltage of up to kV from the Project below ground at a location adjacent to, under or across certain Designated Roads, as identified on Appendix D (the " kV Installation"). The k V Installation will include a fiber-optic communication cable that will be installed in conjunction with the electrical cables. In connection with the kV Installation, the Parties further agree that OYA shall be responsible for obtaining all private land rights as are necessary to permit OYA to complete the kV Installation and make the modifications and improvements to the Designated Roads contemplated by this Agreement, including obtaining all necessary land rights from private landowners adjacent to the Designated Roads. In connection with the kV Installation, the Town and County hereby grants to OYA all such authorizations and approvals from the Town and County as are necessary to complete the kV Installation, subject only to OYA's obtaining all private land rights as are required in connection therewith.
AutoNDA by SimpleDocs
Collection System Cabling. The Parties acknowledge that Developer will route certain underground wires, cables, conduits and/or lines (and their associated equipment) related to the transmission of electricity at a voltage of up to 34.5 kV for the purpose of carrying electrical current and communications within the Wind Project (“Cables”), including some Cables at a location adjacent to, under, or across the Roads or the Right of Ways (the “Cable Installation”). A diagram of the Cable Installations located within the County Right of Ways (“Cable Installation Route”) shall be provided to the County prior to the Commencement of Construction, and Developer shall not begin Cable Installations, until such Cable Installation Route is approved, or deemed to have been approved, by the County Designee. Cable Installations shall not negatively impact existing improvements within the Right of Ways or anticipated future development of the Right of Ways which have been previously approved by the County. Cable Installations on County Right of Ways will be buried at a minimum depth of 48 inches below ground level, unless otherwise approved by the County Designee and will be encased in high density polyethylene pipe (minimum of 15.5 SDR for 8-inch pipe; any other pipe used is subject to County Designee pre-approval) and (if crossing a road or other improvement) the Road or other improvement shall be restored promptly to its pre-construction condition. A schedule of final “as built” Cables Installations shall be provided to the County Designee as provided in the Development Agreement.

Related to Collection System Cabling

  • Distribution System The Transmission Provider's facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Provider's Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer's wholesale sale of electricity in interstate commerce. Distribution Upgrades do not include Interconnection Facilities.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Communication Systems The Parties agree to share the use of communication systems, radios and radio frequencies for the implementation of this Agreement. Sharing of frequencies must be approved only by authorized personnel for each Party and documented in the AOP.

  • Network Resource Interconnection Service (check if selected)

  • Management Information System The M&E Plan will describe the information system that will be used to collect data, store, process and deliver information to relevant stakeholders in such a way that the Program information collected and verified pursuant to the M&E Plan is at all times accessible and useful to those who wish to use it. The system development will take into consideration the requirement and data needs of the components of the Program, and will be aligned with existing MCC systems, other service providers, and ministries.

  • Transmission System The facilities controlled or operated by the Transmission Provider within the PJM Region that are used to provide transmission service under Part II and Part III of the Tariff.