Commissioning of equipment Sample Clauses

Commissioning of equipment. If the Buyer puts the equipment into operation, hereunder commercial operation, it is deemed fully accepted by Xxxxx.
AutoNDA by SimpleDocs
Commissioning of equipment. If the Buyer puts the equipment into operation, hereunder commercial operation, it is deemed fully accepted by Buyer.
Commissioning of equipment a. Conduct Lane Acceptance Tests of each lane. Group lanes for onsite test. Usually three 4-day trips for the STLT garages and two 3-day trips for the Economy garages and other parking facilities. b. Conduct Software Module Acceptance Tests (examples: LPR performance, prebooking, frequent xxxxxx/loyalty, scan & pay app, other apps. The are grouped together as much as possible to reduce test trips. c. Conduct Payments Acceptance Tests that incudes confirming charges from the device to the gateway, processor, and bank. Also confirm features for refunds and reporting. d. Conduct Integrations Tests such as counts sent to a mobile app or website or APIs to BI and CRM platforms. i. Reporting and accuracy tests of counting system included e. Conduct a 30-day Operational Acceptance Test, which involves a planning meeting to determine roles, responsibilities, and documentation. Teleconferences daily, then every other day or less depending on how the testing is going. f. For each test, summarize test results in a PARCS punchlist. Retest as required. g. Assist with system acceptance and project closeout
Commissioning of equipment. If Item 6 states that the Supplier must commission the Equipment, the Supplier must commission the Equipment: at the time; and so as to meet any other requirements, specified in Item 6.
Commissioning of equipment 

Related to Commissioning of equipment

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Installation of Equipment You represent that there are no legal, contractual or similar restrictions on the installation of the Equipment in the location(s) you have authorized. It is your responsibility to ensure compliance with all applicable building codes, zoning ordinances, homeowners’ association rules, covenants, conditions, and restrictions related to the Service, to pay any fees or other charges, and to obtain any permits or authorizations necessary for the installation or use of the Service (collectively "Legal Requirements"). You are solely responsible for any fines or similar charges for violation of any applicable Legal Requirements. You acknowledge and agree that Viasat or its designated service provider will be required to access your premises and computer to install and maintain the Equipment, including, without limitation, the antenna and its components. Standard Equipment installations performed by Viasat-authorized installers include: (i) installation of the antenna to an outside wall or sloped roof; (ii) travel to and from your Service location within 50 miles of the installer’s office; (iii) cable routed through one exterior wall and one interior wall or floor; (iv) connection of the antenna to the modem using up to 150 feet of cable; (v) connection of the modem to one computer using up to 7 feet of cable; and (vi) required mounting and cabling hardware. Any different or additional installation services or hardware are non-standard and may result in additional charges to be agreed upon between you and the installer. All installations include attaching the Equipment to your computer, installing software on your computer and configuring your computer to optimize the performance of the Internet Service. You confirm that you have reviewed the installation plan and agreed to any associated charges. If you approved a roof mount, you acknowledge the potential risks associated with this type of installation (including, without limitation, with respect to any warranty that applies to your roof or roof membrane). By signing this Agreement, scheduling one or more service or installation visits, and permitting us or our service provider to enter your home, you are authorizing Viasat and its service provider to perform all of the above actions. You are responsible for backing up the data on your computer and we highly recommend that you do so prior to permitting access to us or one of our designated service providers. NEITHER VIASAT NOR ITS SERVICE PROVIDER SHALL HAVE ANY LIABILITY WHATSOEVER FOR ANY LOSSES RESULTING FROM THE EQUIPMENT OR ANY INSTALLATION, REPAIR OR OTHER SERVICES ASSOCIATED WITH THE EQUIPMENT, INCLUDING WITHOUT LIMITATION, DAMAGE TO YOUR PREMISES OR LOSS OF SOFTWARE, DATA OR OTHER INFORMATION FROM YOUR COMPUTER. This limitation does not apply to any damages arising from the gross negligence or willful misconduct of us or one of our designated service providers. Time frames for installation, if any, are not guaranteed and may vary depending on the types of services requested and other factors.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Closeout of Equipment 1. At the end of the term of a Contract that has no additional renewals or that will not be renewed (Closeout), or when a Contract is otherwise terminated, Grantee will submit to the SUD email box, XxxxxxxxxXxxxx.Xxxxxxxxx@xxxx.xxxxx.xx.xx an inventory of equipment purchased with System Agency funds and request disposition instructions for such equipment. 2. All equipment purchased with System Agency funds must be secured by Grantee at the time of Closeout, or termination of this Contract, and must be disposed of according to the System Agency’s disposition instructions, which may include return of the equipment to System Agency or transfer of possession to another System Agency Grantee, at Xxxxxxx’s expense.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Delivery of Equipment (a) We will try to deliver Equipment to you on the delivery date (Delivery Date) and at the address (Site) indicated on your Application during normal business hours in that area. (b) Variations at your request to Delivery Date or Site: (i) are at our discretion; and (ii) may be subject to conditions, including extra Charges.

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).