Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;
Doors Exterior doors may not be propped open for safety and security reasons. Students may be referred to the student conduct system if found propping these doors. Doors marked as emergency exits may only be used for emergency purposes other than during University-sanctioned move-in days.
Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.
Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.
Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.
ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.