CONSTRUCTION DOCUMENT REVIEW The Sample Clauses

CONSTRUCTION DOCUMENT REVIEW The. Construction Manager shall review the drawings and specifications in an effort to identify potential constructability problems that could impact the Construction Manager's ability to perform the Work in an expeditious and economical manner. The Construction Manager shall issue a report to the Design Professional and Owner for their review and action as appropriate. In addition, the Construction Manager shall promptly report to the Owner and the Design Professional any errors or omissions which it discovers in the drawings and specifications.
AutoNDA by SimpleDocs

Related to CONSTRUCTION DOCUMENT REVIEW The

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Construction Documents Phase Bidding or Negotiation Phase:

  • Document Review (a) During the Evaluation Period, Purchaser and the Licensee Parties shall have the right to review and inspect, at Purchaser’s sole cost and expense, all of the following which, to Seller’s Knowledge, are in Seller’s possession or control (collectively, the “Documents”): all existing environmental reports and studies of the Real Property, real estate tax bills, together with assessments (special or otherwise), ad valorem and personal property tax bills, covering the period of Seller’s ownership of the Property; Seller’s most current lease schedule in the form attached hereto as Exhibit F (the “Lease Schedule”); current operating statements; historical financial reports; the Leases, lease files, Service Contracts, and Licenses and Permits. Such inspections shall occur at a location selected by Seller, which may be at the office of Seller, Seller’s counsel, Seller’s property manager, at the Real Property, in an electronic “war room” or any of the above. Purchaser shall not have the right to review or inspect materials not directly related to the leasing, maintenance and/or management of the Property, including, without limitation, Seller’s internal e-mails and memoranda, financial projections, budgets, appraisals, proposals for work not actually undertaken, income tax records and similar proprietary, elective or confidential information, and engineering reports and studies. (b) Purchaser acknowledges that any and all of the Documents may be proprietary and confidential in nature and have been provided to Purchaser solely to assist Purchaser in determining the desirability of purchasing the Property. Subject only to the provisions of Article XII, Purchaser agrees not to disclose the contents of the Documents or any of the provisions, terms or conditions contained therein to any party outside of Purchaser’s organization other than its attorneys, partners, accountants, agents, consultants, lenders or investors (collectively, for purposes of this Section 5.2(b), the “Permitted Outside Parties”). Purchaser further agrees that within its organization, or as to the Permitted Outside Parties, the Documents will be disclosed and exhibited only to those persons within Purchaser’s organization or to those Permitted Outside Parties who are responsible for determining the desirability of Purchaser’s acquisition of the Property. Purchaser further acknowledges that the Documents and other information relating to the leasing arrangements between Seller and Tenants are proprietary and confidential in nature. Purchaser agrees not to divulge the contents of such Documents and other information except in strict accordance with the confidentiality standards set forth in this Section 5.2 and Article XII. In permitting Purchaser and the Permitted Outside Parties to review the Documents and other information to assist Purchaser, Seller has not waived any privilege or claim of confidentiality with respect thereto, and no third party benefits or relationships of any kind, either express or implied, have been offered, intended or created by Seller, and any such claims are expressly rejected by Seller and waived by Purchaser and the Permitted Outside Parties, for whom, by its execution of this Agreement, Purchaser is acting as an agent with regard to such waiver. (c) Purchaser acknowledges that some of the Documents may have been prepared by third parties and may have been prepared prior to Seller’s ownership of the Property. PURCHASER HEREBY ACKNOWLEDGES THAT, EXCEPT AS EXPRESSLY SET FORTH IN SECTION 8.1 BELOW, SELLER HAS NOT MADE AND DOES NOT MAKE ANY REPRESENTATION OR WARRANTY REGARDING THE TRUTH, ACCURACY OR COMPLETENESS OF THE DOCUMENTS OR THE SOURCES THEREOF. SELLER HAS NOT UNDERTAKEN ANY INDEPENDENT INVESTIGATION AS TO THE TRUTH, ACCURACY OR COMPLETENESS OF THE DOCUMENTS AND IS PROVIDING THE DOCUMENTS SOLELY AS AN ACCOMMODATION TO PURCHASER.

  • REVIEW OF CONTRACT DOCUMENTS 4.2.1 The Contractor shall carefully study and compare the Contract Documents and shall immediately report in writing to the Architect and the State any error, inconsistency or omission he may discover. The Contractor shall not be liable to the State or the Architect for any damage resulting from any such errors, inconsistencies or omissions in the Contract Documents. The

  • Agreement Review If, pursuant to section 25.10 (Review of Agreement) of the Bilateral Agreement, the Bilateral Agreement is reviewed after three or five years, or both, of the effective date of the Bilateral Agreement, and any changes to the Bilateral Agreement are required as a result, the Parties agree to amend the Agreement as necessary and in a manner that is consistent with such changes.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Project Review A. Programmatic Allowances 1. If FEMA determines that the entire scope of an Undertaking conforms to one or more allowances in Appendix B of this Agreement, with determinations for Tier II Allowances being made by SOI-qualified staff, FEMA shall complete the Section 106 review process by documenting this determination in the project file, without SHPO review or notification. 2. If the Undertaking involves a National Historic Landmark (NHL), FEMA shall notify the SHPO, participating Tribe(s), and the NPS NHL Program Manager of the NPS Midwest Regional Office that the Undertaking conforms to one or more allowances. FEMA shall provide information about the proposed scope of work for the Undertaking and the allowance(s) enabling FEMA’s determination. 3. If FEMA determines any portion of an Undertaking’s scope of work does not conform to one or more allowances listed in Appendix B, FEMA shall conduct expedited or standard Section 106 review, as appropriate, for the entire Undertaking in accordance with Stipulation II.B, Expedited Review for Emergency Undertakings, or Stipulation II.C, Standard Project Review. 4. Allowances may be revised and new allowances may be added to this Agreement in accordance with Stipulation IV.A.3, Amendments. B. Expedited Review for Emergency Undertakings

  • Construction Contract If federal funds are included as part of the financing of the non-OPWC portion of the Project, federal law may prevail, including, but not limited to, application of Xxxxx Xxxxx prevailing wage rates, the Xxxxxxxx “Anti-Kickback” Act, the Contract Work Hours and Safety Standards Act, and any federal environmental regulations. Recipient is solely responsible for ensuring compliance with federal requirements applicable to its Local Subdivision Contribution. Notwithstanding the above, the following provisions apply to construction contracts under this Agreement:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!