Contracted Demand Reduction Check Tests Sample Clauses

Contracted Demand Reduction Check Tests. (a) The Buyer shall have the option, exercisable on no more than two (2) occasions per Contract Year, to require the Supplier, within ten (10) Business Days after written notice has been delivered to the Supplier, provided it is not during an Outage, to conduct a test, at the Supplier’s sole cost and expense, to confirm the Contracted Demand Reduction of the DR Project (the “CDR Check Test”) for that Season. Each CDR Check Test shall consist of the DR Project curtailing Electricity demand in response to Operational Directives for six (6) continuous hours during a period designated by the Supplier in advance as a test period (but which hours shall be during Callable Hours) subject to coordination and approval of the IMO. If the Control Equipment includes a generator, then the Contracted Demand Reduction shall be evaluated based on the meter data in relation to the generator. The Supplier acknowledges and agrees that the Contracted Demand Reduction and the meter data, as measured by the CDR Check Test, shall not be adjusted for ambient, weather, or other conditions whatsoever. If: (i) the CDR Check Test is interrupted by an event of Force Majeure, or (ii) if the Control Equipment includes a generator and at any point during the CDR Check Test, the air temperature, as reported at the Environment Canada weather station that is physically nearest to the Contract Facility (or in the case of a Contract Facility that is comprised of two or more generating facilities that are aggregated, the weather station that is physically nearest to one of the generating facilities so aggregated that has been selected by the Supplier), exceeded 30.0 degrees Celsius, then the Supplier may, at the Supplier’s sole cost and expense, re- perform the CDR Check Test within ten (10) Business Days after the receipt by the Supplier of the DR Verification Certificate relating to such CDR Check Test from the Buyer. The Buyer and its authorized agents and representatives shall be entitled to attend any CDR Check Test, and the Supplier shall provide the Buyer with any Measurement and Verification Data resulting from each test forthwith upon completion of the CDR Check Test. For greater certainty, a Late Certificate Capacity Check Test required pursuant to Section 4.2(a) shall not count as one of the two (2) occasions per Contract Year that the Buyer may require the Supplier to conduct a CDR Check Test.
AutoNDA by SimpleDocs

Related to Contracted Demand Reduction Check Tests

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

  • Move-Out Procedure Prior to either (i) the expiry of the Term, or (ii) the date on which the Resident is to vacate the Residence (detailed in Table 1 & 3), the Manager, or designate, can be requested in advance by the Resident to complete a visual inspection of the Suite to view the state of cleanliness and repair. If no request to inspect the suite is made by the Resident, the inspection will take place once the Resident has vacated the suite. In the event the Resident chooses to have the inspection completed prior to vacating the suite, the Manager, or designate, will inspect the suite and inform the Resident of potential damage and/or cleaning charges and outline what steps the student may take to mitigate charges. On vacating, all garbage and belongings of the Resident must be removed, and the suite must be cleaned to the point of restoring the suite to its original condition. Once the Resident has vacated, the Manager, or designate, will complete a documented visual inspection of the Suite. In the event deficiencies are found, the cost of cleaning the suite and restoring it to its original state may be deducted from the Resident’s original Deposit. There is a minimum cleaning charge of $25.00 and damage charges will be billed accordingly at the cost of restoring the suite to its original condition. Any items left behind by the Resident will be immediately discarded; the Residence shall not be liable to the Resident for any loss of property as a result. As with the “move-in procedures”, care must be exercised to avoid damage to doors, frames, walls, floor coverings and any other part of the Residence. The Resident is financially responsible to pay forthwith for any damage caused on moving out of the Residence.

  • For Lump Sum Change Order The payment and extension of time (if any) provided by this Change Order constitutes compensation in full to the Contractor and its Subcontractors and Suppliers for all costs and markups directly and indirectly attributable to the Change Order herein, for all delays related thereto and for performance of changes within the time stated.

  • MINIMUM CALL-IN If a member is called in for extra work, they shall be paid a minimum of four (4) hour pay at their straight hourly rate.

  • Texas Family Code Child Support Certification Pursuant to §231.006, Texas Family Code, Contractor certifies it is not ineligible to receive the award of or payments under this Agreement, and acknowledges this Agreement may be terminated and payment withheld if this certification is inaccurate.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • REPORT OF CONTRACT USAGE All fields of information shall be accurate and complete. The report is to be submitted electronically via electronic mail utilizing the template provided in Microsoft Excel 2003, or newer (or as otherwise directed by OGS), to the attention of the individual shown on the front page of the Contract Award Notification and shall reference the Group Number, Award Number, Contract Number, Sales Period, and Contractor's (or other authorized agent) Name, and all other fields required. OGS reserves the right to amend the report template without acquiring the approval of the Office of the State Comptroller or the Attorney General.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • What Forms of Distribution Are Available from a Xxxxxxxxx Education Savings Account Distributions may be made as a lump sum of the entire account, or distributions of a portion of the account may be made as requested.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

Time is Money Join Law Insider Premium to draft better contracts faster.