Contractor’s Supervision. The contractor shall, during the whole time the work is in progress, employ a qualified experienced site-in-charge of the works with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEER. Such in-charge shall be constantly in attendance at the site during working hours. During CONTRACTOR’S supervisory engineer absence during working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER / GIPCL and shall be received and obeyed by the CONTRACTOR’S superintendent or Xxxxxxx who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be deemed to have been given to the CONTRACTOR. The representative of the CONTRACTOR shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour should be withdrawn from the work without due notice being given to the GIPCL / ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR to remove any person employed by the CONTRACTOR in or about execution of works who in the opinion of the ENGINEER misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or employ any employee of the other party except by mutual consent.
Appears in 4 contracts
Samples: Rate Contract, Tender Document, Biennial Rate Contract for Security & Vigilance Services
Contractor’s Supervision. The contractor Contractor shall, during the whole time the work is in progress, employ a qualified experienced site-inSite In-charge of the works with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEEREngineer In-charge. Such in-Site In- charge shall be constantly in attendance at the site during working hours. During CONTRACTOR’S supervisory engineer Contractor’s Supervisor’s absence during working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER / GIPCL GIPCL’s Engineer In-charge and shall be received and obeyed by the CONTRACTOR’S Contractor’s superintendent or Xxxxxxx who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL Engineer / GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER Engineer / GIPCL to him, shall be deemed to have been given to the CONTRACTORContractor. The representative of the CONTRACTOR Contractor shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S Contractor’s Superintendents, engineers, supervisors Supervisors or labour workmen should be withdrawn from the work without due notice being given to the GIPCL / ENGINEERGIPCL’s Engineer In-charge; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER GIPCL’s Engineer In-charge such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR Contractor shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR Contractor to remove any person employed by the CONTRACTOR Contractor in or about execution of works who in the opinion of the ENGINEER Engineer misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER Contractor nor the ENGINEER Engineer shall hire or employ any employee of the any other party except by mutual consent.
Appears in 3 contracts
Samples: Biennial Service Contract, Biennial Service Contract, Biennial Service Contract
Contractor’s Supervision. The contractor Contractor shall, during the whole time the work is in progress, employ a qualified experienced site-inSite In-charge /Supervisor of the works with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEEREngineer In-charge. Such inSite In-charge /Supervisor shall be constantly in attendance at the site during working hours. During CONTRACTOR’S supervisory engineer Contractor’s Supervisor’s absence during in working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER / GIPCL GIPCL’s Engineer In-charge and shall be received and obeyed by the CONTRACTOR’S Contractor’s superintendent or Xxxxxxx who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL Engineer / GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER Engineer / GIPCL to him, shall be deemed to have been given to the CONTRACTORContractor. The representative of the CONTRACTOR Contractor shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S Contractor’s Superintendents, engineers, supervisors Supervisors or labour workmen should be withdrawn from the work without due notice being given to the GIPCL / ENGINEERGIPCL’s Engineer In-charge; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER GIPCL’s Engineer In-charge such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR Contractor shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR Contractor to remove any person employed by the CONTRACTOR Contractor in or about execution of works who in the opinion of the ENGINEER Engineer misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER Contractor nor the ENGINEER Engineer shall hire or employ any employee of the any other party except by mutual consent.
Appears in 2 contracts
Samples: Biennial Rate Contract (Brc), Biennial Rate Contract (Brc) for Disposal of Ash and Cleaning Services
Contractor’s Supervision. The contractor shall, during the whole time the work is in progress, employ a qualified experienced site-in-charge of the works with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEER. Such in-charge shall be constantly in attendance at the site during working hours. During CONTRACTOR’S CONTRACTOR‟S supervisory engineer absence during working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER / GIPCL and shall be received and obeyed by the CONTRACTOR’S CONTRACTOR‟S superintendent or Xxxxxxx who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be deemed to have been given to the CONTRACTOR. The representative of the CONTRACTOR shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S CONTRACTOR‟S Superintendents, engineers, supervisors or labour should be withdrawn from the work without due notice being given to the GIPCL / ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR to remove any person employed by the CONTRACTOR in or about execution of works who in the opinion of the ENGINEER misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or employ any employee of the other party except by mutual consent.
Appears in 2 contracts
Samples: Bi Annual Maintenance Contract, Bi Annual Maintenance Contract
Contractor’s Supervision. 24.1 The contractor CONTRACTOR shall, during the whole time the work is in progress, employ a qualified experienced site-engineer to be in-charge of the works with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL OWNER / ENGINEERPROJECT MANAGER. Such in-charge engineer shall be constantly in attendance at the site during working hours. During CONTRACTOR’S supervisory engineer Contractor’s representative’s absence during working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, directions and orders may be given by the ENGINEER / GIPCL and OWNER/PROJECT MANAGER, such orders shall be received and obeyed by the CONTRACTOR’S superintendent or Xxxxxxx engineer in-charge who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be deemed to have been given to the CONTRACTOR. The representative of the CONTRACTOR shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. .
24.2 None of the CONTRACTOR’S ’s Superintendents, engineers, supervisors or labour should be withdrawn from the work without due notice being given to the GIPCL / OWNER/PROJECT MANAGER/ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL / OWNER/PROJECT MANAGER/ENGINEER such withdrawals will jeopardize jeopardise the required pace of progress / progress/successful completion of the work. .
24.3 The CONTRACTOR shall employ in or about execution of the work only such persons as area are careful, skilled and experienced in their respective trades, and the GIPCL OWNER/PROJECT MANAGER shall be at liberty to object to and require the CONTRACTOR to remove any person employed by the CONTRACTOR in or about execution of works who in the opinion of the ENGINEER misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. OWNER/PROJECT MANAGER.
24.4 Neither the CONTRACTOR and CONTRACTOR, the PURCHASER OWNER/PROJECT MANAGER nor the ENGINEER shall hire or employ any employee of the other party except by mutual consent.
Appears in 1 contract
Samples: Outline Agreement for Providing and Fixing of Furniture
Contractor’s Supervision. The contractor shall, during the whole time the work is in progress, employ a qualified experienced site-in-charge of the works with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEEROfficer. Such in-charge shall be constantly in attendance at the site during working hours. During CONTRACTOR’S 'S supervisory engineer absence during working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER / Officer GIPCL and shall be received and obeyed by the CONTRACTOR’S superintendent or Xxxxxxx 'S Site in-charge / Supervisor who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL Official GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER / Officer GIPCL to him, shall be deemed to have been given to the CONTRACTOR. The representative of the CONTRACTOR shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S 'S Superintendents, engineers, supervisors or labour should be withdrawn from the work without due notice being given to the GIPCL / ENGINEEROfficer; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER Officer such withdrawals will jeopardize the required pace of progress / I successful completion of the work. The CONTRACTOR shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR to remove any person employed by the CONTRACTOR in or about execution of works who in the opinion of the ENGINEER Officer misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER nor the ENGINEER Officer shall hire or employ any employee of the other party except by mutual consent.
Appears in 1 contract
Samples: Biennial Rate Contract
Contractor’s Supervision. The Contractor shall either himself supervise the execution of the Contract or shall appoint a competent Agent approved by the Engineer–in–charge to act in his stead. The contractor shallshall employ an Engineer/Agent having at least a ‘Degree of Bachelor of Civil Engineering’ from a recognized University/on any work with a Contract value exceeding rupees two lakhs, during and having at least a Diploma in civil Engineering from a recognized college, on work with a contract value exceeding Rs. 50,000/- but not exceeding rupees two lakhs. The Employment of an Engineer/Agent as aforesaid shall not be necessary if the whole time the work Contractor himself in possession of a recognized technical qualification and is in progress, employ a qualified experienced siteopinion of the Engineer-in-charge capable of receiving instructions of the works with adequate experience in handing Engineer–in–charge and of jobs of this nature and with executing the prior approval work to the satisfaction of the GIPCL / ENGINEEREngineer-in–charge. Such If the Contractor fails to appoint a suitable Engineer/ Agent as aforesaid, the Engineer–in-–charge shall have full powers to suspend the execution of work and stop payment of any advances that may have become due until such date as a suitable Engineer/Agent is appointed and the contractor shall be constantly held responsible for the delay caused to the work and no extension of time on this account shall be given to him as stipulated in condition (9) above. Orders given to the Contractor’s Agent/Engineer shall be considered to have the same force as if they had been given to the Contractor himself. The contractor or his Agent shall be in attendance at the site during all working hourshours and shall superintend the execution of work with such additional assistance in each trade as the Engineer–in - charge may consider necessary. During CONTRACTOR’S supervisory engineer absence during working hoursThe contractor or his accredited agent shall attend when required and without making any claim for doing so, if unavoidableeither the Office of the Engineer–in–charge or the work site to receive instructions. The Engineer–in–charge shall have full powers, and also beyond working hourswithout assigning any reason to require the Contractor immediately to cease to employ in connection with the Contract any Agent, when it may servant or employee whose continued employment is, in his opinion undesirable. The Contractor shall not be necessary allowed any compensation on this account.
20. The Contractor shall employ labourer in sufficient numbers either directly or through sub-contractors to give directions, orders may be given by maintain the ENGINEER / GIPCL required rate of progress and shall be received and obeyed by the CONTRACTOR’S superintendent or Xxxxxxx who may have charge of quality to ensure workmanship of the particular part degree specified in the Contract and to the satisfaction of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be deemed to have been given to the CONTRACTOREngineer-in-charge. The representative of the CONTRACTOR Contractor shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed not employ in connection with the work as required for speedy execution. None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour should be withdrawn from the work without due notice being given to the GIPCL / ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR to remove works any person employed by the CONTRACTOR in or about execution who has not completed his fifteen years of works who in the opinion of the ENGINEER misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCLage. Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or employ any employee of the other party except by mutual consent.Model Rules for Labour Welfare
Appears in 1 contract
Samples: Maintenance Contract
Contractor’s Supervision. The contractor Contractor shall, during the whole time the work is in progress, employ a qualified experienced site-in-charge of the works manpower / operator with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEEREngineer In-charge. Such in-charge manpower / operator shall be constantly in attendance at the site during working hours. During CONTRACTOR’S supervisory engineer Contractor’s Supervisor’s absence during working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER / GIPCL GIPCL’s Engineer In-charge and shall be received and obeyed by the CONTRACTOR’S Contractor’s superintendent or Xxxxxxx who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL Engineer / GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER Engineer / GIPCL to him, shall be deemed to have been given to the CONTRACTORContractor. The representative of the CONTRACTOR Contractor shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S Contractor’s Superintendents, engineers, supervisors Supervisors or labour should be withdrawn from the work without due notice being given to the GIPCL / ENGINEERGIPCL’s Engineer In-charge; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER GIPCL’s Engineer In-charge such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR Contractor shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR Contractor to remove any person employed by the CONTRACTOR Contractor in or about execution of works who in the opinion of the ENGINEER Engineer misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER Contractor nor the ENGINEER Engineer shall hire or employ any employee of the any other party except by mutual consent.
Appears in 1 contract
Samples: Biennial Rate Contract
Contractor’s Supervision. The contractor Contractor shall, during the whole time the work is in progress, employ a qualified experienced site-inSite In-charge of the works with adequate experience in handing of jobs of this nature and with the prior approval of the GIPCL / ENGINEEREngineer In-charge. Such inSite In-charge shall be constantly in attendance at the site during working hours. During CONTRACTOR’S supervisory engineer Contractor’s Supervisor’s absence during working hours, if unavoidable, and also beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER / GIPCL GIPCL’s Engineer In-charge and shall be received and obeyed by the CONTRACTOR’S Contractor’s superintendent or Xxxxxxx who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL Engineer / GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER Engineer / GIPCL to him, shall be deemed to have been given to the CONTRACTORContractor. The representative of the CONTRACTOR Contractor shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S Contractor’s Superintendents, engineers, supervisors Supervisors or labour workmen should be withdrawn from the work without due notice being given to the GIPCL / ENGINEERGIPCL’s Engineer In-charge; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER GIPCL’s Engineer In-charge such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR Contractor shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR Contractor to remove any person employed by the CONTRACTOR Contractor in or about execution of works who in the opinion of the ENGINEER Engineer misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER Contractor nor the ENGINEER Engineer shall hire or employ any employee of the any other party except by mutual consent.
Appears in 1 contract
Samples: Biennial Rate Contract
Contractor’s Supervision. The Contractor shall either himself supervise the execution of the Contract or shall appoint a competent Agent approved by the Engineer–in–charge to act in his stead. The contractor shallshall employ an Engineer/Agent having at least a ‘Degree of Bachelor of Civil Engineering’ from a recognized University/on any work with a Contract value exceeding rupees two lakhs, during and having at least a Diploma in civil Engineering from a recognized college, on work with a contract value exceeding Rs. 50,000/- but not exceeding rupees two lakhs. The Employment of an Engineer/Agent as aforesaid shall not be necessary if the whole time the work Contractor himself in possession of a recognized technical qualification and is in progress, employ a qualified experienced siteopinion of the Engineer-in-charge capable of receiving instructions of the works with adequate experience in handing Engineer–in–charge and of jobs of this nature and with executing the prior approval work to the satisfaction of the GIPCL / ENGINEEREngineer-in–charge. Such If the Contractor fails to appoint a suitable Engineer/ Agent as aforesaid, the Engineer–in-–charge shall have full powers to suspend the execution of work and stop payment of any advances that may have become due until such date as a suitable Engineer/Agent is appointed and the contractor shall be constantly held responsible for the delay caused to the work and no extension of time on this account shall be given to him as stipulated in condition (9) above. Orders given to the Contractor’s Agent/Engineer shall be considered to have the same force as if they had been given to the Contractor himself. The contractor or his Agent shall be in attendance at the site during all working hourshours and shall superintend the execution of work with such additional assistance in each trade as the Engineer–in - charge may consider necessary. During CONTRACTOR’S supervisory engineer absence during working hoursThe contractor or his accredited agent shall attend when required and without making any claim for doing so, if unavoidableeither the Office of the Engineer–in–charge or the work site to receive instructions. The Engineer–in–charge shall have full powers, and also beyond working hourswithout assigning any reason to require the Contractor immediately to cease to employ in connection with the Contract any Agent, when it may be necessary to give directionsservant or employee whose continued employment is, orders may be given by the ENGINEER / GIPCL and shall be received and obeyed by the CONTRACTOR’S superintendent or Xxxxxxx who may have charge of the particular part of the work in reference to which orders are given. If requested to do so, the ENGINEER /GIPCL shall confirm such orders in writing. Any directions, instructions or notices given by the ENGINEER / GIPCL to him, shall be deemed to have been given to the CONTRACTORhis opinion undesirable. The representative of the CONTRACTOR shall have all necessary powers to receive materials from the GIPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work as required for speedy execution. None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour should be withdrawn from the work without due notice being given to the GIPCL / ENGINEER; further no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER such withdrawals will jeopardize the required pace of progress / successful completion of the work. The CONTRACTOR shall employ in or about execution of the work only such persons as area careful, skilled and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the CONTRACTOR to remove any person employed by the CONTRACTOR in or about execution of works who in the opinion of the ENGINEER misconducts himself or is incompetent or negligent in the proper performance of his duties and all such persons Contractor shall not again be employed upon the works without the prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or employ allowed any employee of the other party except by mutual consentcompensation on this account.
Appears in 1 contract
Samples: Tender Agreement