Contractor’s Supervision. 6.2.1. During progress of the Work, Contractor shall keep on the Premises, and at all other appropriate locations where any Work related to the Contract is being performed, minimum staffing as indicated in Exhibit K to the Master Facilities Lease. These persons shall each comply with the following: 6.2.1.1. Each shall be an employee of the Contractor, to whom the District does not object. 6.2.1.2. Each shall speak fluently English, written and verbal, and the predominant language of the Contractor’s employees. 6.2.2. Before commencing the Work herein, Contractor shall give written notice to District of the name of its project manager and construction superintendent. Neither the Contractor’s project manager nor construction superintendent shall be changed except with prior written notice to District, unless the Contractor’s project manager and/or construction superintendent proves to be unsatisfactory to Contractor, District, any of the District's employees, agents, the Construction Manager, or the Architect, in which case, Contractor shall notify District in writing or if such project manager or construction superintendent are no longer employed by Contractor. The Contractor’s project manager and construction superintendent shall each represent Contractor, and all directions given to Contractor’s project manager and/or construction superintendent shall be as binding as if given to Contractor. 6.2.3. Contractor shall give efficient supervision to Work, using its best skill and attention. Contractor shall carefully study and compare all Contract Documents, Drawings, Specifications, and other instructions and shall at once report to District, Construction Manager, and Architect any error, inconsistency, or omission that Contractor or its employees and Subcontractors may discover, in writing, with a copy to District's Project Inspector(s). 6.2.4. The Contractor’s project manager shall devote sufficient time to the Project on site, and in the Contractor’s home office to pre-plan activities to meet the Project schedule and fulfill all Contract 6.2.5. The Contractor shall verify all indicated dimensions before ordering materials or equipment, or before performing work. The Contractor shall take field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Project Documents before commencing work. Errors, inconsistencies or omissions discovered shall be reported to the District at once. Upon commencement of any item of work, the Contractor shall be responsible for dimensions related to such item of work and shall make any 6.2.6. Contractor shall not be relieved from performing work related to omissions from the plans, drawings or specifications, or misdescriptions of details of work which are manifestly necessary to carry out the intent of the plans, drawings and specifications, or which are customarily performed. Contractor shall perform this work as if fully and correctly set forth and described in the plans, drawings and specifications. 6.2.7. The Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. The Contractor shall be responsible to see that the finished work complies accurately with the Contract Documents.
Appears in 3 contracts
Samples: Master Site Lease, Master Site Lease, Master Site Lease
Contractor’s Supervision. 6.2.1. During progress of the Work, Contractor shall keep on the Premises, and at all other appropriate locations where any Work related to the Contract is being performed, minimum staffing as indicated in Exhibit K to the Master Facilities Lease. These persons shall each comply with the following:
6.2.1.1. Each shall be an employee of the Contractor, to whom the District does not object.
6.2.1.2. Each shall speak fluently English, written and verbal, and the predominant language of the Contractor’s employees.
6.2.2. Before commencing the Work herein, Contractor shall give written notice to District of the name of its project manager and construction superintendent. Neither the Contractor’s project manager nor construction superintendent shall be changed except with prior written notice to District, unless the Contractor’s project manager and/or construction superintendent proves to be unsatisfactory to Contractor, District, any of the District's employees, agents, the Construction Manager, or the Architect, in which case, Contractor shall notify District in writing or if such project manager or construction superintendent are no longer employed by Contractor. The Contractor’s project manager and construction superintendent shall each represent Contractor, and all directions given to Contractor’s project manager and/or construction superintendent shall be as binding as if given to Contractor.
6.2.3. Contractor shall give efficient supervision to Work, using its best skill and attention. Contractor shall carefully study and compare all Contract Documents, Drawings, Specifications, and other instructions and shall at once report to District, Construction Manager, and Architect any error, inconsistency, or omission that Contractor or its employees and Subcontractors may discover, in writing, with a copy to District's Project Inspector(s).
6.2.4. The Contractor’s project manager shall devote sufficient time to the Project on site, and in the Contractor’s home office to pre-plan activities to meet the Project schedule and fulfill all ContractContract obligations. This includes making timely submittals, issuing and disseminating necessary RFI’s, promptly processing and distributing bulletins, change orders and payments, keeping required logs current etc. If any of these activities fall behind contract requirements or dates necessary to complete the Project on time, the Contractor must provide a full time project manager on site dedicated solely to the Project, until the deficiencies are corrected.
6.2.5. The Contractor shall verify all indicated dimensions before ordering materials or equipment, or before performing work. The Contractor shall take field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Project Documents before commencing work. Errors, inconsistencies or omissions discovered shall be reported to the District at once. Upon commencement of any item of work, the Contractor shall be responsible for dimensions related to such item of work and shall make anyany corrections necessary to make work properly fit at no additional cost to District. This responsibility for
6.2.6. Contractor shall not be relieved from performing work related to omissions from the plans, drawings or specifications, or misdescriptions of details of work which are manifestly necessary to carry out the intent of the plans, drawings and specifications, or which are customarily performed. Contractor shall perform this work as if fully and correctly set forth and described in the plans, drawings and specifications.
6.2.7. The Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. The Contractor shall be responsible to see that the finished work complies accurately with the Contract Documents.
Appears in 1 contract
Samples: Master Site Lease
Contractor’s Supervision. 6.2.1. During progress of the Work, Contractor shall keep on the Premises, and at all other appropriate locations where any Work related to the Contract is being performed, minimum staffing as indicated in Exhibit K to the Master Facilities Lease. These persons shall each comply with the following:
6.2.1.1. Each shall be an employee of the Contractor, to whom the District does not object.
6.2.1.2. Each shall speak fluently English, written and verbal, and the predominant language of the Contractor’s employees.
6.2.2. Before commencing the Work herein, Contractor shall give written notice to District of the name of its project manager and construction superintendent. Neither the Contractor’s project manager nor construction superintendent shall be changed except with prior written notice to District, unless the Contractor’s project manager and/or construction superintendent proves to be unsatisfactory to Contractor, District, any of the District's employees, agents, the Construction Manager, or the Architect, in which case, Contractor shall notify District in writing or if such project manager or construction superintendent are no longer employed by Contractor. The Contractor’s project manager and construction superintendent shall each represent Contractor, and all directions given to Contractor’s project manager and/or construction superintendent shall be as binding as if given to Contractor.
6.2.3. Contractor shall give efficient supervision to Work, using its best skill and attention. Contractor shall carefully study and compare all Contract Documents, Drawings, Specifications, and other instructions and shall at once report to District, Construction Manager, and Architect any error, inconsistency, or omission that Contractor or its employees and Subcontractors may discover, in writing, with a copy to District's Project Inspector(s).
6.2.4. The Contractor’s project manager shall devote sufficient time to the Project on site, and in the Contractor’s home office to pre-plan activities to meet the Project schedule and fulfill all Contract
6.2.5. The Contractor shall verify all indicated dimensions before ordering materials or equipment, or before performing work. The Contractor shall take field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Project Documents before commencing work. Errors, inconsistencies or omissions discovered shall be reported to the District at once. Upon commencement of any item of work, the Contractor shall be responsible for dimensions related to such item of work and shall make anyany corrections necessary to make work properly fit at no additional cost to District. This responsibility for verification of dimensions is a non-delegable duty and may not be delegated to subcontractors or agents.
6.2.6. Contractor shall not be relieved from performing work related to omissions from the plans, drawings or specifications, or misdescriptions of details of work which are manifestly necessary to carry out the intent of the plans, drawings and specifications, or which are customarily performed. Contractor shall perform this work as if fully and correctly set forth and described in the plans, drawings and specifications.
6.2.7. The Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. The Contractor shall be responsible to see that the finished work complies accurately with the Contract Documents.
Appears in 1 contract
Samples: Master Site Lease
Contractor’s Supervision. 6.2.1. During progress of the Work, Contractor shall must keep on the Premises, and at all other appropriate locations where any Work related to the Contract is being performed, minimum staffing as indicated in Exhibit K to the Master Facilities Lease. These persons shall each comply with the following:
6.2.1.1. Each shall be an employee a competent project manager and construction superintendent who are employees of the Contractor, to whom the District Judicial Council does not object.
6.2.1.2. Each shall speak fluently English, object and at least one (1) of whom is fluent in English (written and verbal, ).
6.2.2. The project manager and construction superintendent must also both speak fluently the predominant language of the Contractor’s employees.
6.2.26.2.3. Before commencing the Work hereinWork, Contractor shall will give written notice to District Judicial Council of the name of its project manager and construction superintendent. Neither the Contractor’s project manager nor construction superintendent shall will be changed except with prior written notice to DistrictJudicial Council, unless the Contractor’s project manager and/or construction superintendent proves to be unsatisfactory to Contractor, DistrictJudicial Council, any of the District's Judicial Council’s employees, agents, the Construction Manager, or the Architect, in which case, Contractor shall will notify District Judicial Council in writing or if such project manager or construction superintendent are no longer employed by after the change has been made. Judicial Council retains the right to reasonably refuse Contractor’s replacement personnel. The Contractor’s project manager and construction superintendent shall will each represent Contractor, and all directions given to Contractor’s project manager and/or construction superintendent shall by Judicial Council, the Construction Manager, or the Architect will be as binding as if given to Contractor.
6.2.36.2.4. Contractor shall give efficient supervision to will efficiently supervise the Work, using its best skill and attention. Contractor shall must carefully study and compare all Contract Documents, Drawings, Specifications, and other instructions and shall must at once report to DistrictJudicial Council, Construction Manager, and Architect any error, inconsistency, or omission that Contractor or its employees and Subcontractors may discover, in writing, with a copy to District's Judicial Council’s Project Inspector(s). Contractor has the responsibility for discovery of errors, inconsistencies, or omissions.
6.2.46.2.5. Contractor’s construction superintendent must be employed full-time for the Project and shall have complete authority to represent and act on behalf on Contractor on all matters pertaining to the Work. The construction superintendent must be competent and have a minimum of five (5) years’ experience in construction supervision on projects of similar scale and complexity.
6.2.6. Contractor’s project manager shall must devote sufficient time to the Project on siteSite, and in the Contractor’s home office to pre-plan activities to meet the Project schedule Construction Schedule and fulfill all Contractobligations in the Contract Documents. This includes, without limitation, making timely submittals, issuing and disseminating necessary RFIs, promptly processing and distributing bulletins, change orders and payments, keeping required logs current, etc. If any of these activities fall behind requirements of the Contract Documents or dates necessary to complete the Project within the Contract Time, Contractor must provide a full- time project manager on the Project Site dedicated solely to the Project, until the deficiencies are corrected.
6.2.56.2.7. The Contractor shall must verify all indicated dimensions before ordering materials or equipment, or before performing workWork. The Contractor shall must take field measurements, verify field conditions, and shall must carefully compare such field measurements and conditions and other information known to the Contractor with the Project Contract Documents before commencing work. ErrorsContractor must immediately report errors, inconsistencies or omissions discovered shall be reported by Contractor to the District at onceJudicial Council. Upon commencement of any item of workWork, the Contractor shall be is responsible for dimensions related to such item the Work and must make any corrections necessary to make Work properly fit at no additional cost to Judicial Council. This responsibility for verification of work dimensions is a non-delegable duty and shall make any
6.2.6. Contractor shall may not be relieved from performing work related delegated to omissions Subcontractors or agents.
6.2.8. Omissions from the plans, drawings Drawings or specificationsSpecifications, or misdescriptions any incorrect description of details of work Work which are manifestly necessary to carry out the intent of the plans, drawings Drawings and specificationsSpecifications, or which are customarily performed, do not relieve Contractor from performing such omitted or any incorrectly described Work. Contractor shall must perform this work that Work as if fully and correctly set forth and described in the plans, drawings Drawings and specificationsSpecifications.
6.2.76.2.9. The Contractor shall be is solely responsible for the means, methods, techniques, sequences, and procedures of constructionperforming all Work. This includes, without limitation, exercising full control over the direction and compensation of all persons assisting Contractor in the performance of the Work and the coordination and sequencing of the Work amongst the Subcontractors. Contractor is solely responsible for all matters relating to the payment of its employees, including compliance with social security, withholding, all employee benefits, and all regulations governing such matters. The Contractor shall be is responsible to see for ensuring that the finished work Work complies accurately with the Contract Documents.
Appears in 1 contract
Contractor’s Supervision. 6.2.15.2.1. During progress of the Work, Contractor shall keep on the Premises, and at all other appropriate locations where any Work related to the Contract is being performed, minimum staffing as indicated in Exhibit K to the Master Facilities Lease. These persons shall each comply with the following:
6.2.1.15.2.1.1. Each shall be an employee of the Contractor, to whom the District does not object.
6.2.1.25.2.1.2. Each shall speak fluently English, written and verbal, and the predominant language of the Contractor’s employees.
6.2.25.2.2. Before commencing the Work herein, Contractor shall give written notice to District of the name of its project manager and construction superintendent. Neither the Contractor’s project manager nor construction superintendent shall be changed except with prior written notice to District, unless the Contractor’s project manager and/or construction superintendent proves to be unsatisfactory to Contractor, District, any of the District's employees, agents, the Construction Manager, or the Architect, in which case, Contractor shall notify District in writing or if such project manager or construction superintendent are no longer employed by Contractor. The Contractor’s project manager and construction superintendent shall each represent Contractor, and all directions given to Contractor’s project manager and/or construction superintendent shall be as binding as if given to Contractor.
6.2.35.2.3. Contractor shall give efficient supervision to the Work, using its best skill and attention. Contractor shall carefully study and compare all Contract Documents, Drawings, Specifications, and other instructions and shall at once report to District, Construction Manager, and Architect any error, inconsistency, or omission that Contractor or its employees and Subcontractors may discover, in writing, with a copy to District's Project Inspector(s).
6.2.45.2.4. The Contractor’s project manager shall devote sufficient time to the Project on site, and in the Contractor’s home office to pre-plan pre‐plan activities to meet the Project schedule Construction Schedule and fulfill all Contract
6.2.55.2.5. The Contractor shall verify all indicated dimensions before ordering materials or equipment, or before performing work. The Contractor shall take field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Project Documents before commencing work. Errors, inconsistencies or omissions discovered shall be reported to the District at once. Upon commencement of any item of work, the Contractor shall be responsible for dimensions related to such item of work and shall make anyany corrections necessary to make work properly fit at no additional cost to District. This responsibility for verification of dimensions is a non‐delegable duty and may not be delegated to subcontractors or agents.
6.2.65.2.6. Contractor shall not be relieved from performing work related to omissions from the plans, drawings or specifications, or misdescriptions of details of work which are manifestly necessary to carry out the intent of the plans, drawings and specifications, or which are customarily performed. Contractor shall perform this work as if fully and correctly set forth and described in the plans, drawings and specifications.
6.2.75.2.7. The Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. The Contractor shall be responsible to see that the finished work complies accurately with the Contract Documents.
Appears in 1 contract
Samples: Site Lease
Contractor’s Supervision. 6.2.1. During progress of the Work, Contractor shall keep on the Premises, and at all other appropriate locations where any Work related to the Contract is being performed, minimum staffing as indicated in Exhibit K to the Master Facilities Lease. These persons shall each comply with the following:
6.2.1.1. : Each shall be an employee of the Contractor, to whom the District does not object.
6.2.1.2. Each shall speak fluently English, written and verbal, and the predominant language of the Contractor’s employees.
6.2.2. Before commencing the Work herein, Contractor shall give written notice to District of the name of its project manager and construction superintendent. Neither the Contractor’s project manager nor construction superintendent shall be changed except with prior written notice to District, unless the Contractor’s project manager and/or construction superintendent proves to be unsatisfactory to Contractor, District, any of the District's employees, agents, the Construction Manager, or the Architect, in which case, Contractor shall notify District in writing or if such project manager or construction superintendent are no longer employed by Contractor. The Contractor’s project manager and construction superintendent shall each represent Contractor, and all directions given to Contractor’s project manager and/or construction superintendent shall be as binding as if given to Contractor.
6.2.3. Contractor shall give efficient supervision to Work, using its best skill and attention. Contractor shall carefully study and compare all Contract Documents, Drawings, Specifications, and other instructions and shall at once report to District, Construction Manager, and Architect any error, inconsistency, or omission that Contractor or its employees and Subcontractors may discover, in writing, with a copy to District's Project Inspector(s).
6.2.4. The Contractor’s project manager shall devote sufficient time to the Project on site, and in the Contractor’s home office to pre-plan activities to meet the Project schedule and fulfill all Contract
6.2.5Contract obligations. This includes making timely submittals, issuing and disseminating necessary RFI’s, promptly processing and distributing bulletins, change orders and payments, keeping required logs current etc. If any of these activities fall behind contract requirements or dates necessary to complete the Project on time, the Contractor must provide a full time project manager on site dedicated solely to the Project, until the deficiencies are corrected. The Contractor shall verify all indicated dimensions before ordering materials or equipment, or before performing work. The Contractor shall take field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Project Documents before commencing work. Errors, inconsistencies or omissions discovered shall be reported to the District at once. Upon commencement of any item of work, the Contractor shall be responsible for dimensions related to such item of work and shall make any
6.2.6any corrections necessary to make work properly fit at no additional cost to District. This responsibility for verification of dimensions is a non-delegable duty and may not be delegated to subcontractors or agents. Contractor shall not be relieved from performing work related to omissions from the plans, drawings or specifications, or misdescriptions of details of work which are manifestly necessary to carry out the intent of the plans, drawings and specifications, or which are customarily performed. Contractor shall perform this work as if fully and correctly set forth and described in the plans, drawings and specifications.
6.2.7. The Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. The Contractor shall be responsible to see that the finished work complies accurately with the Contract Documents.
Appears in 1 contract
Samples: Site Lease
Contractor’s Supervision. 6.2.15.2.1. During progress of the Work, Contractor shall keep on the PremisesSchool Site, and at all other appropriate locations where any Work related to the Contract is being performed, minimum staffing as indicated in Exhibit K to the Master Facilities Lease. These persons shall each comply with the following:
6.2.1.15.2.1.1. Each shall be an employee of the Contractor, to whom the District does not object.
6.2.1.25.2.1.2. Each shall speak fluently English, written and verbal, and the predominant language of the Contractor’s employees.
6.2.25.2.2. Before commencing the Work herein, Contractor shall give written notice to District of the name of its project manager and construction superintendent. Neither the Contractor’s project manager nor construction superintendent shall be changed except with prior written notice to District, unless the Contractor’s project manager and/or construction superintendent proves to be unsatisfactory to Contractor, District, any of the District's employees, agents, the Construction Manager, or the Architect, in which case, Contractor shall notify District in writing or if such project manager or construction superintendent are no longer employed by Contractor. The Contractor’s project manager and construction superintendent shall each represent Contractor, and all directions given to Contractor’s project manager and/or construction superintendent shall be as binding as if given to Contractor.
6.2.35.2.3. Contractor shall give efficient supervision to the Work, using its best skill and attention. Contractor shall carefully study and compare all Contract Documents, Drawings, Specifications, and other instructions and shall at once report to District, Construction Manager, and Architect any error, inconsistency, or omission that Contractor or its employees and Subcontractors may discover, in writing, with a copy to District's Project Inspector(s).
6.2.45.2.4. The Contractor’s project manager shall devote sufficient time to the Project on site, and in the Contractor’s home office to pre-plan activities to meet the Project schedule Construction Schedule and fulfill all ContractContract obligations. This includes making timely submittals, issuing and disseminating necessary RFI’s, promptly processing and distributing bulletins, change orders and payments, keeping required logs current etc. If any of these activities fall behind contract requirements or dates necessary to complete the Project on time, the Contractor must provide a full time project manager on site dedicated solely to the Project, until the deficiencies are corrected.
6.2.55.2.5. The Contractor shall verify all indicated dimensions before ordering materials or equipment, or before performing work. The Contractor shall take field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Project Documents before commencing work. Errors, inconsistencies or omissions discovered shall be reported to the District at once. Upon commencement of any item of work, the Contractor shall be responsible for dimensions related to such item of work and shall make anyany corrections necessary to make work properly fit at no additional cost to District. This responsibility for verification of dimensions is a non-delegable duty and may not be delegated to subcontractors or agents.
6.2.65.2.6. Contractor shall not be relieved from performing work related to omissions from the plans, drawings or specifications, or misdescriptions of details of work which are manifestly necessary to carry out the intent of the plans, drawings and specifications, or which are customarily performed. Contractor shall perform this work as if fully and correctly set forth and described in the plans, drawings and specifications.
6.2.75.2.7. The Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. The Contractor shall be responsible to see that the finished work complies accurately with the Contract Documents.
Appears in 1 contract
Samples: Site Lease