Current Approach to Assessment of Former NAS Xxxxxxx Field Petroleum Sites Sample Clauses

Current Approach to Assessment of Former NAS Xxxxxxx Field Petroleum Sites. The State of California’s philosophy for corrective action at petroleum sites changed significantly when the State Water Resources Control Board (“SWRCB”) revised its policy for petroleum sites in 1995. This change was made in part due to the findings of a study that concluded that petroleum hydrocarbon contaminant residual levels tend to degrade naturally once the source (nonaqueous phase product) has been removed. Under the new SWRCB policy, as adopted by the RWQCB, once the source is removed, sites with residual levels of soil or groundwater concentration do not require active remediation if they do not pose unacceptable risks and the preferred remedial alternative is natural bioremediation. It was recommended that the RBCA risk assessment method (ASTM, 1995) be used to evaluate risks to human health (Tetra Tech 1998b). In 1996, the Navy and RWQCB agreed to an approach to applying RBCA to petroleum sites at the former NAS Xxxxxxx Field. In 1998, the Navy submitted the Final Basewide Petroleum Site Evaluation Methodology Technical Memorandum (Tetra Tech 1998b) that described the evaluation process to be applied and summarized information applicable to the entire NAS Xxxxxxx Field site. The Navy is now in the process of preparing technical memoranda as appendices to the 1998 document that summarize site-specific data and risk assessments conducted for the MFA petroleum sites. Several of the risk assessments for petroleum sites within the NRP area have been completed or are currently being prepared.
AutoNDA by SimpleDocs

Related to Current Approach to Assessment of Former NAS Xxxxxxx Field Petroleum Sites

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Conditions & Requirements

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.

  • Public Posting of Approved Users’ Research Use Statement The PI agrees that information about themselves and the approved research use will be posted publicly on the dbGaP website. The information includes the PI’s name and Requester, project name, Research Use Statement, and a Non-Technical Summary of the Research Use Statement. In addition, and if applicable, this information may include the Cloud Computing Use Statement and name of the CSP or PCS. Citations of publications resulting from the use of controlled-access datasets obtained through this DAR may also be posted on the dbGaP website.

  • First Source Hiring Program Contractor must comply with all of the provisions of the First Source Hiring Program, Chapter 83 of the San Francisco Administrative Code, that apply to this Agreement, and Contractor is subject to the enforcement and penalty provisions in Chapter 83.

  • Contractor Licensing, etc. Notwithstanding Section 14.c, District may terminate this Contract immediately by written notice to Contractor upon denial, suspension, revocation, or non-renewal of any license, permit, or certificate that Contractor must hold to provide services under this Contract.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

  • Procurement of Recovered Materials In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!