Dedicated Street Signage, Traffic Control Signs, and Traffic Control Devices Sample Clauses

Dedicated Street Signage, Traffic Control Signs, and Traffic Control Devices. All Dedicated Street signage, traffic control signs, and traffic control devices required by, and meeting the standards of, the “Manual of Uniform Traffic Control Devices,” but only if first approved in writing by CITY’s Public Works Director or the City Engineer and only if located at a Street Intersection or related to the Development Area.
AutoNDA by SimpleDocs
Dedicated Street Signage, Traffic Control Signs, and Traffic Control Devices. One hundred percent (100%) of the Cost of Dedicated Street signage, traffic control signs, traffic control devices, and installation, as applicable, shall be borne by general obligation of DISTRICT, specially assessed against the property specially benefited within the Development Area, or privately financed by DEVELOPER. DISTRICT shall also be responsible for installation of all such signage and devices.

Related to Dedicated Street Signage, Traffic Control Signs, and Traffic Control Devices

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Fire, Life Safety, and Accessibility Codes The following codes, in the versions approved by the Georgia State Fire Marshal/Fire Safety Commissioner and Department of Human Resources, shall be used. The Design Professional will designate any additional codes or special modifications in the Supplementary General Conditions.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Information Technology Accessibility Standards Any information technology related products or services purchased, used or maintained through this Grant must be compatible with the principles and goals contained in the Electronic and Information Technology Accessibility Standards adopted by the Architectural and Transportation Barriers Compliance Board under Section 508 of the federal Rehabilitation Act of 1973 (29 U.S.C. §794d), as amended. The federal Electronic and Information Technology Accessibility Standards can be found at: xxxx://xxx.xxxxxx-xxxxx.xxx/508.htm.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Drug and Alcohol Testing – Safety-Sensitive Functions A. Employees required to have a Commercial Driver’s License (CDL) are subject to pre-employment, post-accident, random and reasonable suspicion testing in accordance with the U.S. Department of Transportation rules, Coast Guard Regulations (46 CFR Part 16) or the Federal Omnibus Transportation Employee Testing Act of 1991. The testing will be conducted in accordance with current Employer policy.

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Technical Safeguards 1. USAC and the Department will process the data matched and any data created by the match under the immediate supervision and control of authorized personnel to protect the confidentiality of the data, so unauthorized persons cannot retrieve any data by computer, remote terminal, or other means.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.