Description of the Reduction Process For Reducible ETCNL/GFTCCs Sample Clauses

Description of the Reduction Process For Reducible ETCNL/GFTCCs. Before each Centralized TCC Auction, the ISO shall ensure that all of the following correspond to a simultaneously feasible security constrained Power Flow: (i) existing TCCs and Grandfathered Rights that are valid for any part of the duration of any TCCs to be sold in the Centralized TCC Auction, including but not limited to Fixed Price TCCs that were created pursuant to Section 19.2.1 or 19.2.2.of this Attachment M and Incremental TCCs awarded pursuant to Section 19.2.4 of this Attachment M; Grandfathered TCCs not subject to reduction and Original Residual TCCs to the extent not previously used to support the purchase of TCCs that are valid for any part of the duration of any TCCs to be sold in the Centralized TCC Auction (henceforth “TCCs and Grandfathered Rights listed in Section 19.8.2 (i)”); and (ii) ETCNL (to the extent not previously used to support the purchase of TCCs that are valid for any part of the duration of any TCCs to be sold in the Centralized TCC Auction) and Grandfathered TCCs subject to reduction as listed in Table 1 of this Attachment M (henceforth “Table 1 ETCNL/TCCs”). In some cases, the total set of all the TCCs, Grandfathered Rights, and Table 1 ETCNL/TCCs listed in (i) through (ii) above may not correspond to a simultaneously feasible Power Flow in some period of time. In such cases, Table 1 ETCNL/TCCs, will be reduced for that period in order to make the total set of TCCs and Grandfathered Rights listed in Section 19.8.2 (i), and Table 1 ETCNL/TCCs remaining after reduction correspond to a simultaneously feasible Power Flow. This reduction procedure will use the same optimization model that will be used in the Centralized TCC Auction to determine the amount by which Table 1 ETCNL/TCCs will be reduced. Each of the TCCs and Grandfathered Rights listed in Section 19.8.2 (i) above will be represented in the Centralized TCC Auction model by a fixed injection of 1 MW at its Point of Injection, and a fixed withdrawal of 1 MW at its Point of Withdrawal. In addition, Table 1 ETCNL/TCCs will be represented in the model, but they will be represented in such a way as to allow their reduction. To do so, bids for each Table 1 ETCNL/TCC will consist of a line which intersects the y-axis at $1/TCC (or any other value selected by the ISO, so long as that value is constant for each bid curve for all of these Table 1 ETCNL/TCCs) and which intersects the x-axis at 1 MW. An example of the bid curve Bj for a representative Table 1 ETCNL/TCC is illus...
AutoNDA by SimpleDocs

Related to Description of the Reduction Process For Reducible ETCNL/GFTCCs

  • DESCRIPTION OF THE WORKS Employer’s objectives The scope of the request includes the recommended monthly preventative, quarterly and annual maintenance that needs to be conducted to ensure all areas of the airports are lit and compliant. It will include all the other adhoc request (labor rates) where required upon approval by the maintenance manager. The compliance will be based on the following: • Maintenance as per OEM • Organizational guidelines and codes of practice • OHS act 93 – Occupational Health and Safety • ISO 9001 – Quality management • ISO 14001 – Environmental Management • SANS 10142 – The wiring code • ICAO Annex 14 chapter 5. • ACSA Maintenance Procedure D060 024M This scope entails the maintenance and repair of LV systems and all lighting at Costal airports. In brief, maintenance involves servicing, repairs, and testing of lights and LV systems. This involves carrying out maintenance on electrical equipment such as LV DBs, electrical plant, wiring enclosures and luminaires and associated control systems, portable appliances and other specific electrical equipment, in order to minimize downtime, and ensure that the equipment performs at optimal levels and functions to specification at the specified areas. Servicing - performing routine preventive maintenance as prescribed by the original equipment manufacturer (OEM), ACSA’s planned maintenance routines, and applicable legal and design standards. Repairs – responding to breakdowns, callouts and restoring the equipment to safe working conditions on an as and when basis. Advisory – telephonically guiding airport electricians under emergency situations to ensure systems are safely shutdown or returned to service within stringent times. System Performance Test – Testing equipment performance against the OEM, ACSA, and statutory requirements for compliance and return to service purposes. Extent of the works The Contractor will be fully responsible for meeting all requirements in this document regarding the Works. For each piece of equipment, all work will be carried out to standards as required by the Original Equipment Manufacturer (OEM) as well as any applicable governing law and/or regulations. Where OEM standards differ from those required by this document the more stringent requirement shall apply. The Contractor will be fully responsible for obtaining (and keeping up to date with) said requirements. The proposed minimum scheduled maintenance activities can be found in annex H.

  • Description of the service 9.1.1 Internet banking service implies an ability for the client to manage and receive remotely the following services from the bank by means of using the special Internet-site of the bank xxxxx://xxx.xxxxxxxxxxxxxxx.xx:

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • Service Description The Parties will provide Common Channel Signaling (CCS) to one another via Signaling System 7 (SS7) network Interconnection, in accordance with prevailing industry standards. Use of a third party provider of SS7 trunks is permitted.

  • Escalation Process 9.1. There will be times when the pharmacist will need additional advice or will need to escalate the patient to a higher acuity care location (e.g. back to their GP or an Urgent Treatment Centre or A&E).

  • Service Descriptions Available services for Transitional and Enhanced Supervision Services a. One (1) one-to-one meeting with the Contractor per week for case management services.

  • Optional Xactimate Response Attachment (Part 2)

  • Bona Fide Request/New Business Request Process for Further Unbundling 6.1 BellSouth shall, upon request of <<customer_name>>, provide to <<customer_name>> access to its network elements at any technically feasible point for the provision of <<customer_name>>'s telecommunications service where such access is necessary and failure to provide access would impair the ability of <<customer_name>> to provide services that it seeks to offer. Any request by <<customer_name>> for access to a network element, interconnection option, or for the provisioning of any service or product that is not already available shall be treated as a Bona Fide Request/New Business Request (BFR/NBR), and shall be submitted to BellSouth pursuant to the BFR/NBR process.

  • DESCRIPTION OF CONTRACT MODIFICATION This contract modification is made in accordance with Exhibit E-Revised-1, Contractual Terms and Conditions, Section 22. CHANGES, to be made part hereof for all pertinent purposes. The changes are as follows:

  • Contract Description The Description and Location of the Contract and related project(s) are as follows.

Time is Money Join Law Insider Premium to draft better contracts faster.