Design and Location Strategy Sample Clauses

Design and Location Strategy. Design precedents and inspirations; approximate sign locations including their relation to site vehicular, bicycle and pedestrian circulation and prominent destinations; parameters for signage placement within streetscapes and other parts of the public realm and POPOS; and other considerations guiding signage design and location.
AutoNDA by SimpleDocs

Related to Design and Location Strategy

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Program Location A. Unless otherwise agreed upon in writing, the parties acknowledge and agree that the Work of this Agreement will be performed at the following Property address: Ktr Address1 Address2

  • Project Team Cooperation Partnering 1.1.3 Constitutional Principles Applicable to State Public Works Projects.

  • Project Location [Insert the location of the Project, if applicable]

  • Travel, Meals and Lodging When provided for in the Mini-Bid and resultant Authorized User Agreement, an Authorized User may reimburse travel expenses. All rules and regulations associated with this travel can be found at xxxx://xxx.xxxxx.xx.xx/agencies/travel/travel.htm. In no case will any travel reimbursement be paid that exceeds these rates. All travel will be paid only as part of a deliverable specified within the Authorized User Agreement and must be billed with that associated Invoice with receipts attached. The Contractor shall receive prior approval from the Authorized User for any travel that occurs during the term of an Authorized User Agreement. Parking fees and/or parking tickets may not be paid by an Authorized User. Unless otherwise specified in writing by the Authorized User, a vehicle will not be provided by Authorized User to the Contractor for travel. Therefore, the Contractor will be responsible for ensuring that the Contractor has access to an appropriate vehicle (e.g., personal vehicle or rental vehicle) or common carrier with which to carry out any necessary travel. For the Contractor to obtain reimbursement for the use of a rental vehicle, such use must be justified as the most cost-effective mode of transportation under the circumstances (including consideration of the most effective use of time). The Contractor shall provide evidence of three (3) written or telephone price quotes, and the paid invoice must detail the type of vehicle rented, miles traveled, license plate number, and time of pickup and return. The Contractor is responsible for keeping adequate records to substantiate any claims for reimbursement, by personnel for travel in performance of the services.

  • Design and Non-Design 109.20.3.1 Trip Charge - Premises Visit Charge No USOC $95.00

  • Project Staff Contractor shall appoint to the Project Staff: (i) individuals with suitable training and skills to provide the Work, and (ii) sufficient staffing to adequately provide the Work. Contractor shall make commercially reasonable efforts consistent with sound business practices to honor the specific request of the JBE with regard to assignment of its employees. The JBE may require Contractor to remove any personnel from the Project Staff that interact with any personnel of the Judicial Branch Entities or JBE Contractors (including, without limitation, the Contractor Project Manager) upon providing to Contractor a reason (permitted by law) for such removal. Contractor may, with the JBE’s consent, continue to retain such member of the Project Staff in a role that does not interact with any personnel of the Judicial Branch Entities or

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Project Staffing Prior to the start of any work under this Agreement, Consultant must submit to City detailed resumes of key personnel that will be involved in performing services prescribed in the Agreement. City hereby acknowledges its acceptance of such personnel to perform services under this Agreement. At any time hereafter that Consultant desires to change key personnel while performing under the Agreement, Consultant must submit the qualifications of the new personnel to City for prior approval. Key personnel include, but are not limited to, principals-in-charge, project manager, and project Consultant. Consultant will maintain an adequate and competent staff of qualified persons, as may be determined by City, throughout the performance of this Agreement to ensure acceptable and timely completion of the Scope of Services. If City objects, with reasonable cause, to any of Consultant’s staff, Consultant must take prompt corrective action acceptable to City and, if required, remove such personnel from the Project and replace with new personnel agreed to by City.

Time is Money Join Law Insider Premium to draft better contracts faster.