Design and realization Sample Clauses

Design and realization. Different approaches to fluidics were evaluated. Both fluidics for the final demonstrator and for the developmental work was considered. In the former case, it is important to find a solution suitable for rational fabrication and for analyses carried out within minutes. In the latter case, we need a solution that is easy to assemble for all partners (also those who have not access to printing equipment) and suitable for long-time measurements, say 1 h. We have tested flow channels of different plastic materials combined with either SU8, double-sided adhesive (MACTAC) or a screen printable adhesive (SP7555, MS) to confine the analyte reservoir and flow channel. SU8 is difficult to laminate and is hydrophobic. MACTAC works better, and is easily applied, but during long-time exposures we believe that the liquid penetrates the adhesive layer to some extent. Best results were achieved for the screen printable adhesive SP7555, which is more resistant to liquids than the double-sided tape. It is also transparent and easily laminated to the top layer of the structure. During our experiments we observed slow or interrupted flow in some of the test structures. The project reviewers advised us to evaluate the flow properties in an intermediate structure with a functionalized semiconductor surface. A test was made in order to confirm that flowing liquids into our selected sensor system would not present any problem. Especially, we wanted to confirm that the structure would allow for liquid flow after functionalization of the semiconductor area. A structure using materials that have shown to inhibit flow of DI water (P3HT, teonex, evaporated Au) was made. pTHMMAA was incubated on the P3HT surface. Successful low tests with AZO-colored DI water and PBS were made (Figure 5.2). Also in structures without pTHMMAA flow was confirmed but it was not as fast as in the incubated structure.
AutoNDA by SimpleDocs

Related to Design and realization

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Assistance and Cooperation After the Closing Date, each of Seller and Purchaser shall:

  • Restricted Use By Outsourcers / Facilities Management, Service Bureaus or Other Third Parties Outsourcers, facilities management or service bureaus retained by Licensee shall have the right to use the Product to maintain Licensee’s business operations, including data processing, for the time period that they are engaged in such activities, provided that: 1) Licensee gives notice to Contractor of such party, site of intended use of the Product, and means of access; and 2) such party has executed, or agrees to execute, the Product manufacturer’s standard nondisclosure or restricted use agreement which executed agreement shall be accepted by the Contractor (“Non-Disclosure Agreement”); and 3) if such party is engaged in the business of facility management, outsourcing, service bureau or other services, such third party will maintain a logical or physical partition within its computer system so as to restrict use and access to the program to that portion solely dedicated to beneficial use for Licensee. In no event shall Licensee assume any liability for third party’s compliance with the terms of the Non-Disclosure Agreement, nor shall the Non-Disclosure Agreement create or impose any liabilities on the State or Licensee. Any third party with whom a Licensee has a relationship for a state function or business operation, shall have the temporary right to use Product (e.g., JAVA Applets), provided that such use shall be limited to the time period during which the third party is using the Product for the function or business activity.

  • MANAGEMENT OF EVALUATION OUTCOMES 12.1 The evaluation of the Employee’s performance will form the basis for rewarding outstanding performance or correcting unacceptable performance.

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • Design and Non-Design 109.20.3.1 Trip Charge - Premises Visit Charge No USOC $95.00

  • Project Management Services Contractor shall provide business analysis and project management services necessary to ensure technical projects successfully meet the objectives for which they were undertaken. Following are characteristics of this Service:

  • Chiropractic Services This plan covers chiropractic visits up to the benefit limit shown in the Summary of Medical Benefits. The benefit limit applies to any visit for the purposes of chiropractic treatment or diagnosis.

  • Assistance by COUNTY STAFF 1.3.1. COUNTY shall assign an appropriate staff member to work with A-E in connection with the work of this CONTRACT. Said staff member's duties will consist of the giving of advice and consultations, assisting A-E in negotiations with other public agencies and private parties, miscellaneous items which in the judgment of A-E or COUNTY's staff warrant attention, and all other duties as may be described in Attachment A.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!