Design Capacity. The station’s initial pumping capacity may be less than the ultimate design depending upon the size of the service area and the phasing of development. In such an installation, allowances for larger or additional pumping equipment must be made for future modification. If the initial design capacity is in excess of anticipated initial flow, the effects of the minimum flow conditions must be estimated to be sure that the retention of sewage in the wet well will not create an odor or corrosion nuisance, and that the pumping equipment will operate with reasonable frequency.
Design Capacity. The capacity of Segment S of MAYA-1 initially consisting of 3024 Ring-MIUs for service and 3024 Ring-MIUs for in-system restoration.
Design Capacity. The total capacity within the Cable System shall be equal to 3024 MIUs of which 1008 MIUs are available for restoration, except for Subsegment F2 which shall have a capacity of 2016 NIUs of which zero (0) MIU are available for restoration and Subsegment F5 which shall have a capacity of 4032 MIUs of which 1008 MIUs are available for restoration;
Design Capacity. The capacity of Segment S of SEA-ME-WE 3 provided under the Supply Contract.
Design Capacity. The "Design Capacity" of the Unit shall be 91,000 litres of Used Oil (and any other materials included in the charge to the Unit) processed per 24 hours of continuous operation.
Design Capacity. (2) Total 30 MW ---------- 1 Attach a letter signed by an officer of the Seller warranting that the Seller is in good standing with the Hawaii Department of Commerce and Consumer Affairs.
Design Capacity. The term "Design Capacity" with respect to the --------------- capacity of all or part of a plant means the annual capacity to produce product which the parties agree it is designed or is to be designed to produce, when operated 24 hours per day for 330 days per year.
Design Capacity. Design Capacity is the Capacity which each Segment S and Segments X-1 and X-2 can ultimately provide. The Design Capacity of each fiber pair consists of thirty-two (32) Basic System Modules, with each Basic System Module providing sixty-three (63) MIUs, for a Design Capacity of two thousand sixteen (2,016) MIUs.
Design Capacity. Fords, armored, and vented crossings are considered permanent watercourse encroachments and shall be designed and sized to accommodate the 100-year flood flow plus associated sediment and debris.
Design Capacity. Total 25 MW ---------- * If the Seller is not the owner of the facility, attach a copy of the agreement between the Seller and the facility's owner which establishes the Seller's right to operate the facility and sell power to the Company. ** Attach a letter signed by an officer of the Seller warranting that the Seller is in good standing with the Hawaii Department of Commerce and Consumer Affairs.