Design Excellence Sample Clauses

Design Excellence. The Developer must support the design excellence objectives of the State in respect of the Public Works, including the requirement that all Public Works are to be completed in compliance with the design excellence requirements of the Western Gateway Design Guide.
AutoNDA by SimpleDocs
Design Excellence 

Related to Design Excellence

  • Design Elements The School shall implement and maintain the following essential design elements of its educational program:

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Synchronization The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.

  • Formwork Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re- use. The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself. Formwork to soffits of solid slabs etc., shall be deemed to be to slabs not exceeding 250mm thick unless otherwise described. Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks. Carried to Collection R Amount Item Quantity Rate Amount No REINFORCED CONCRETE 25 MPa/19mm Concrete: 14 Base slabs. m3 7 15 Suspended Slabs. m3 7 TEST BLOCKS Test blocks: 16 Making and testing set of three 150x150x150mm concrete strength test cubes (Provisional). No 4 FINISHING TOP SURFACE OF CONCRETE Finishing top surfaces of concrete with a wood float: 17 Base slabs, etc m2 36 Finishing top surfaces of concrete smooth with steel float: 18 Suspended slab, etc m2 36 ROUGH FORMWORK (DEGREE OF ACCURACY II) Rough Formwork to Sides: 19 Edges, risers, ends and reveals not exceeding 300mm high or wide. m 27 Smooth Formwork to Sides: 20 Edges, risers, ends and reveals not exceeding 300mm high or wide. m 27 Fabric reinforcement: