Determining the LNG temperature and the gas phase temperature Sample Clauses

Determining the LNG temperature and the gas phase temperature. Each of the Vessel's tanks must be equipped with temperature sensors placed in such a way that at all times at least one sensor is located in the liquid and one in the gas phase, with the other sensors distributed at regular intervals from the top to the bottom of the tank. The temperature of the LNG before the Unloading or Reloading operations is determined by calculating the arithmetic mean of the measurements from the temperature sensors immersed in the liquid. The temperature of the gas phase after the Unloading or Reloading operations is determined by calculating the arithmetic mean of the measurements from the temperature sensors located above the liquid phase. The overall temperature measurement error, including the temperature measurement system element errors, must not exceed the values in the following table in accordance with standard ISO 8310. overall error of the measuring system Liquid phase – LNG ± 0.2 °C Gas phase ± 1.5 °C
AutoNDA by SimpleDocs
Determining the LNG temperature and the gas phase temperature. Each of the Vessel's tanks must be equipped with temperature sensors placed in such a way that at all times at least one sensor is located in the liquid and one in the gas phase, with the other sensors distributed at regular intervals from the top to the bottom of the tank. Only the measurements in the tanks concerned by the Cargo Transfer are taken into account. The temperature of the LNG before the Cargo Transfer is determined by calculating the arithmetic mean of all the measurements from the temperature sensors immersed in the liquid. The temperature of the gas phase after the Cargo Transfer is determined by calculating the arithmetic mean of all the measurements from the temperature sensors located above the liquid phase. The overall temperature measurement error, including the temperature measurement system element errors, must not exceed the values in the following table in accordance with standard ISO 8310. overall error of the measuring system Liquid phase – LNG ± 0.2 °C Gas phase ± 1.5 °C

Related to Determining the LNG temperature and the gas phase temperature

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Placement of EPP probes Probes for measuring EPP parameters shall be placed inside or close to Registrars points of access to the Internet across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.