Dewatering and Drainage Sample Clauses

Dewatering and Drainage. Contractor shall provide proper and adequate dewatering and drainage for its facilities, work areas, excavations, access roads, borrow pits, storage, parking and fabrication areas including furnishing all necessary well points, pumps, and piping for water disposal to Company designated drainage areas. Contractor shall furnish all necessary surfacing material to avoid loss of time due to muddy conditions.
AutoNDA by SimpleDocs

Related to Dewatering and Drainage

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Parking and Transportation ‌ The Union agrees that during the life of this Agreement, the University may apply changes in transportation policy, including adjusting parking and U-Pass fees and criteria for assigning parking spots, to the bargaining unit without the obligation to bargain with the Union. The Union may raise issues and concerns about the University’s parking program at Joint Labor/Management Committee meetings or at ad hoc Labor Management Committee meetings. The Union shall have a standing seat on the University’s committee(s) that work on transportation and parking issues.

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Mining and Industrial Cooperation 1. The aims of cooperation in mining and industry sectors, carried out in the mutual interest of the Parties and in compliance with their policies, will be: (a) to focus cooperative activities towards sectors where mutual and complementary interests exist; and (b) to build on existing agreements and arrangements already in place between the Parties. 2. Mining and Industrial cooperation may include work in, but not be limited to, the following areas: (a) bio-mining (mining using biotechnology procedures); (b) mining techniques, specially underground mining, and conventional metallurgy; (c) productivity in mining; (d) industrial robotics for mining and other sector applications; (e) informatics and telecommunication applications for mining and industrial plant production; and (f) software development for mining and industrial applications. 3. The Parties will encourage and facilitate, as appropriate, the following activities including, but not limited to: (a) exchange of information, documentation and institutional contacts in areas of interest; (b) mutual access to academic, industrial and entrepreneurial networks in the area of mining and industry; (c) identification of strategies, in consultation with universities and research centres, that encourage joint postgraduate studies, research visits and joint research projects; (d) exchange of scientists, researchers and technical experts; (e) promotion of public/private sector partnerships and joint ventures in the support of the development of innovative products and services specially related to productivity in the sector activities; (f) technology transfer in the areas mentioned in paragraph 2; (g) designing of innovation technology models based in public/private cooperation and association ventures; and (h) information and experience exchange on mining environmental issues.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!