Direction for Device Driver Installation Sample Clauses

Direction for Device Driver Installation. The device driver of Senselock EL will be installed automatically in the installation of SDK. Under some circumstances, you might need to install the driver independently (if you use SDK directly by copying it to other computer or release your software). In this case, you need to use the driver installation tool available in SDK. Located under the directory of %SDK%\Driver, this tool is called ―InstWiz3.exe‖. This is a WIN32 EXF, which can accept the following command line parameters: ♦ /INSTALL install driver (this is a default option) ♦ /UNINSTALL uninstall the driver ♦ /NOGUI Installation interface not displayed These command line parameters can be used in combination. For example, you can run ―InstWiz3.exe /uninstall /xxxxx‖ to uninstall the device driver in a hidden way. This tool can also be used to check the installation status of the device driver of Senselock ELin the current system: run InstWiz3.exe and the tool will check and report the installation status of the driver automatically. Senselock ELDeveloper Guide Product Installation Note: The InstWiz3.exe cannot be executed alone. Under the same directory, these files (mkSetup.dll, language.dll) and directories (win98, winlh64, winlh86, winxp64, winxp86) must be consistently unchanged remaining original file structure. There are several ways to check whether the driver is successfully installed: 1. Insert Senselock EL device to check whether Senselock Senselock ELv2.x shows up normally in the hardware device list (―Device Manager‖🡪 ―Smart Card Reader‖). For Windows98, Window2000 or above, if the device is inserted for the first time, the system will give a prompt of ―new device found‖ automatically and complete the installation; 2. Insert Senselock EL device and run the development test tool or user tool to check out whether access to the device is successful; If you are quite familiar with the installation process of the device driver, you can also choose to install the Senselock EL device driver manually. The directory %SDK%\Driver\Obj contains all the files and directions required for the manual installation of the driver. If you want to complete the installation of the device driver on your own via API, please refer to Appendix E ―API Reference for Device Driver Installation‖. The device driver of Senselock EL has passed Microsoft‘s logo authentication (Designed for Windows XP). For details, please visit xxxx://xxxxxxxxxxxxxx.xxxxxxxxxxxxxxxxxx.xxx/ and query the product SenseIV.
AutoNDA by SimpleDocs

Related to Direction for Device Driver Installation

  • Delivery/Installation Instructions Due to the varying locations and circumstances involved in deliveries and installations, all deliveries and installations will be quoted on a project by project basis. All installation, labor, and or delivery charges must be shown as a separate line item on quotes and invoices. One of the following delivery methods must be specified on every Agency Purchase Order:

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • Installation Waiver Company will waive the one-time installation charges associated with the implementation of Services within the 48 contiguous States of the U.S. provided under this Agreement except for the following services: (i) eDSL, (ii) VPN, (iii) Internet Dedicated OC3, OC12, OC48, Gig-E, (iv) PTT / third party services (including International Access and Company International), (v) Data Center, (vi) Paging, (vii) Managed Services, (viii) CPE, (ix) Enhanced Call Routing, (x) Local Disaster Recovery, (xi) Audio, Video and Net Conferencing, (xii) Voice over IP Services, (xiii) Security Services, (xiv) Non-Listing/Non-Published Service, (xv) Telecommunications Service Priority, and (xvi) Services provided by Company incumbent local exchange carriers (“ILECs”) or by Cellco Partnership and its affiliates d/b/a Company Wireless. Usage charges, monthly recurring charges, expedite charges, change charges, surcharges, charges for an unlisted or non-published number, any charges imposed by third parties (including access, egress, jack, or wiring charges), taxes or tax-like surcharges, or other Governmental Charges will not be waived.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.