Disposal of excavated material. Vegetable soil shall be spread and leveled where directed by the Architect on site. Surplus excavated material where directed or required shall be removed from the site to a tip, the location of which shall first be approved by the Architect in writing. All fees and charges in connection there with shall be deemed to be included in the Contract Sum.
Disposal of excavated material. (muck/spoil from subways and other excavation)
Disposal of excavated material. 1 Before any arrangements for disposal of excavated materials are made, the Designer/Builder will consult with the Owner, and the Owner will have first claim on all excavated materials. In the event the Owner refuses all or part of the excavated materials, it is the responsibility of the Designer/Builder to make arrangements for and dispose of such materials.
Disposal of excavated material. 10.1 (a) All disposal of excavated material will be carried out in accordance with relevant State legislation at an agreed disposal facility.
Disposal of excavated material. A. All excavated earth materials approved by the Owner as suitable for reuse shall be used for backfilling excavations, berms, and for rough grading as necessary for the completion of the contract work.
Disposal of excavated material. Excavated shale shall be disposed of off-site at locations arranged for by the Contractor, at their own expense.
Disposal of excavated material. Provide for safe transportation and disposal of dredged materials. Transport and dispose of dredged material in the area(s) designated for disposal of dredged material. The deposit of dredged materials in unauthorized places is forbidden. Comply with rules and regulations of local port and harbor governing authorities.