Dissolved Aluminum, Total Iron Sample Clauses

Dissolved Aluminum, Total Iron and Total Manganese TMDLs TMDLs and source allocations were developed for impaired segments of tributaries in the Guyandotte watershed. A top-down methodology was followed to develop these TMDLs and allocate loads to sources. Headwaters were first analyzed, because their impact frequently had a profound effect on down-stream water quality. Loading contributions were reduced from applicable sources for these waterbodies and TMDLs were developed. Source reductions never resulted in loading contributions less than natural conditions represented by the undisturbed forest (Table 5-2). Model results from the selected successful scenarios were then routed through down-stream waterbodies. Therefore, when TMDLs were developed for down-stream impaired waterbodies, up-stream contributions were representing existing or unreduced conditions from unimpaired streams and reduced conditions from impaired streams. Using this method, contributions from all sources were weighted equitably. In some situations, reductions in sources impacting unlisted headwaters were required in order to meet downstream water quality criteria. In other situations, reductions in sources impacting impaired headwaters ultimately led to improvements down-stream. This effectually decreased required loading reductions from potential down-stream sources. The following general methodology was used when allocating to sources for the Guyandotte watershed TMDLs. C For watersheds with AMLs but no permitted point sources, AMLs were reduced first, until in-stream water quality criteria were met or to conditions no less than those of undisturbed forest. If further reductions were required, then the sediment sources (Harvested Forest, Burned Forest, Oil and Gas operations, and Roads) were reduced until water quality criteria were met. C For watersheds with AMLs and point sources, point sources were set at the precipitation induced load defined by the permit limits and AMLs were subsequently reduced. AMLs and revoked mining permits were reduced (point sources were not reduced) until in-stream water quality criteria were met, if possible. If further reduction was required once AMLs and revoked mines were reduced, sediment sources were then reduced. If even further reduction was required, the point source discharge limits were then reduced. C For watersheds where dissolved aluminum TMDLs were developed, source allocations for total iron and manganese were developed first since their total in-stream concentrations...
AutoNDA by SimpleDocs

Related to Dissolved Aluminum, Total Iron

  • Mitsui Iron Ore Corporation Pty Ltd. to vary the Iron Ore (Marillana Creek) Agreement;

  • In the Event of Forecasted Surpluses If the HSP is forecasting a surplus, the LHIN may adjust the amount of Funding to be paid under Schedule B, require the repayment of excess Funding and/or adjust the amount of any future funding installments accordingly.

  • For Lump Sum Change Order The payment and extension of time (if any) provided by this Change Order constitutes compensation in full to the Contractor and its Subcontractors and Suppliers for all costs and markups directly and indirectly attributable to the Change Order herein, for all delays related thereto and for performance of changes within the time stated.

  • Karol Bagh W E.A. Karol Bagh , House No. 60/34 ,Road No. , Mustail No. , Khasra , Area1 233, Area2 0, Area3 0 W.E.A. Karol Bagh 43,000.00 10,420.00 1 526 -- 4349 IRFAN , A 220 Weavers Colony A Blk Ashok Vihar delhi HARSHITA , 267/1 Paschimpuri Delhi SALE , SALE WITHIN MC AREA W.E.A. Karol Bagh W.E.A. Karol Bagh , House No. 13/26 ,Road No. , Mustail No. , Khasra , Area1 7, Area2 0, Area3 0 W.E.A. Karol Bagh 640,000.00 25,600.00 1 527 -- 4350 MOHD SUALIHEEN , 1915 Gali Rajan Kucha Chelan D Ganj MOHD SHOAIB , 3910 Gali Jagat Cinema Jama Masjid SALE , SALE WITHIN MC AREA Delhi Gate Bazar Delhi Gate Bazar , House No. 1436- A ,Road No. , Mustail No. , Khasra , Area1 11, Area2 0, Area3 0 Delhi Gate Bazar 530,000.00 31,800.00 1 528 -- 4351 BADRI PRASAD AND OTHERS , 563A Sec-49A Chandigarh RAMESH KOTIYA , 6333 padam Singh Road K Bagh SALE , SALE WITHIN MC AREA Bapa Nagar Bapa Nagar , House No. E-16/562 ,Road No. , Mustail No. , Khasra , Area1 42, Area2 0, Area3 0 Bapa Nagar 1,640,000.00 98,400.00 1 No. X.Xx Xxx.Xx. IstParty IIndParty Type of Deed Address Value Stamp Paid Book No. 529 -- 4352 CHET RAM AND OTHERS ,E-16/1024 Bapa Nagar k Bagh SATPAL AND OTHER , 43/21 East Patel Nagar RELINQUISHMENT DEED , RELINQUISHMENT DEED Bapa Nagar Bapa Nagar , House No. E-16/942-943 ,Road No. , Mustail No. , Khasra , Area1 10, Area2 0, Area3 0 Bapa Nagar 0.00 100.00 1 530 -- 4353 SHAHINA BEGUM , 1019 Gali Chabuk Sawar Bazar LalKuan SEEMA NISHAT , 1781 SF Haus Suiwalan Delhi SALE , SALE WITHIN MC AREA Lal Kuan Lal Kuan , House No. 1019 ,Road No. , Mustail No. , Khasra , Area1 75, Area2 0, Area3 0 Lal Kuan 1,420,000.00 56,800.00 1 531 -- 4354 SAVINDER KAUR GULATI ,66 Prasad Nagar SHRADHA BAJAJ AND MANSI BAJAJ , 65 Parshad nagar SALE , SALE WITHIN MC AREA Prashad Nagar Prashad Nagar , House No. 66 ,Road No. , Mustail No. , Khasra , Area1 95, Area2 0, Area3 0 Prashad Nagar 7,500,000.00 300,000.00 1

  • Proposing Integration Activities in the Planning Submission No integration activity described in section 6.3 may be proposed in a CAPS unless the LHIN has consented, in writing, to its inclusion pursuant to the process set out in section 6.3(b).

  • Evaluation Cycle: Annual Orientation A) At the start of each school year, the superintendent, principal or designee shall conduct a meeting for Educators and Evaluators focused substantially on educator evaluation. The superintendent, principal or designee shall:

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • EPP session-­‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a session command plus the reception of the EPP response for only one EPP session command. For the login command it will include packets needed for starting the TCP session. For the logout command it will include packets needed for closing the TCP session. EPP session commands are those described in section 2.9.1 of EPP RFC 5730. If the RTT is 5 times or more the corresponding SLR, the RTT will be considered undefined.

  • Emergency Action on Imports of Particular Products Where any product is being imported in such increased quantities and under such conditions as to cause, or threaten to cause:

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!