Draft Stormwater Data Report Sample Clauses

Draft Stormwater Data Report. XXXX will prepare a Stormwater Data Report (SWDR) to document the decision-making process associated with stormwater best management practice (BMP) implementation and serve as a basis for compliance. The consultant will use the latest “Long-Form” SWDR template and attachments and will follow the guidance of Caltrans’ Project Planning and Design Guide (July 2017). The Draft SWDR will be prepared during 30% design and the Final SWDR prepared during 65% design under Task 4.2. The SWDR will be submitted to the County for review prior to being submitted to Caltrans. This scope assumes one review of the Draft SWDR by the County and two reviews by Caltrans.
AutoNDA by SimpleDocs

Related to Draft Stormwater Data Report

  • Data Reporting 1. Maintain and adhere to data system software and encrypted portable computer device updates, and interface capability requirements for each computer located within the facility, and as specified in the Contract and required by County.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Joint Funded Project with the Ohio Department of Transportation In the event that the Recipient does not have contracting authority over project engineering, construction, or right-of- way, the Recipient and the OPWC hereby assign certain responsibilities to the Ohio Department of Transportation, an authorized representative of the State of Ohio. Notwithstanding Sections IV, VI.A., VI.B., VI.C., and VII of the Project Agreement, Recipient hereby acknowledges that upon notification by the Ohio Department of Transportation, all payments for eligible project costs will be disbursed by the Grantor directly to the Ohio Department of Transportation. A Memorandum of Funds issued by the Ohio Department of Transportation shall be used to certify the estimated project costs. Upon receipt of a Memorandum of Funds from the Ohio Department of Transportation, the OPWC shall transfer funds directly to the Ohio Department of Transportation via an Intra-State Transfer Voucher. The amount or amounts transferred shall be determined by applying the Participation Percentages defined in Appendix D to those eligible project costs within the Memorandum of Funds. In the event that the Project Scope is for right-of-way only, notwithstanding Appendix D, the OPWC shall pay for 100% of the right-of-way costs not to exceed the total financial assistance provided in Appendix C. APPENDIX D LOCAL SUBDIVISION CONTRIBUTION, PROJECT FINANCING AND EXPENSES SCHEME AND DISBURSEMENT RATIO

  • List of Operator’s Subprocessors [Box 26] [Box 27] [Box 28] [Box 29]

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Authorized User Overview and Mini-Bid Process Project Based IT Consulting Services Contracts enable Authorized Users to use a competitive Mini-bid Process to acquire Services on an as-needed basis, for qualified IT Projects. Project Based IT Consulting Services may include, but will not be limited to projects requiring: analysis, data classification, design, development, testing, quality assurance, security and associated training for Information Technology based applications. See section 1.3 Out of Scope Work for a listing of projects expressly excluded from the scope of this Contract. An Authorized User Agreement for Project Based IT Consulting Services will be governed first by the terms and conditions specified in the OGS Centralized Contract and second by terms and conditions added to the Authorized User Statement of Work. Additional terms and conditions shall not conflict with or modify the terms and conditions of the OGS Centralized Contract. NYS Executive Agencies must adhere to all internal processes and approvals including, as required, approval from NYS Office of Information Technology Services. Other Authorized Users must adhere to their own internal processes and approvals. In accordance with Appendix B, section 28, Modification of Contract Terms, an Authorized User may add additional required terms and conditions to this Mini-Bid and resultant Authorized User Agreement only if such terms and conditions (1) are more favorable to the Authorized User and (2) do not conflict with or supersede the OGS Centralized Contract terms and conditions. Examples of additional terms and conditions include: • Expedited delivery timeframe; • Additional incentives, such as discount for expedited payment/Procurement Card use; and • Any additional requirements imposed by the funding source or Federal law.

  • DATA REQUESTS Upon the written request of the District, the State Auditor’s Office, the Appraisal District, or the Comptroller during the term of this Agreement, the Applicant, the District or any other entity on behalf of the District shall provide the requesting party with all information reasonably necessary for the requesting party to determine whether the Applicant is in compliance with its rights, obligations or responsibilities, including, but not limited to, any employment obligations which may arise under this Agreement.

  • CMI/RAI MDS Report Recognizing the mutual objective of quality resident care, the Employer agrees to meet through the Union Management Committee with the Union as soon as practicable after the receipt of the annual CMI/RAI MDS report. The Employer agrees to provide the Union with staffing levels, and staffing mix information; the impact of related payroll costs on staffing levels and a written notice of the CMI/RAI MDS report for the facility. The purpose of this meeting is to discuss the impact of the CMI/RAI MDS report on the staffing levels in the Home, quality resident care, and provide the Union with an opportunity to make representation in that regard. The parties shall meet as necessary to discuss other changes or workload issues. The parties may invite additional participants to attend the meeting to support constructive review and discussion.

  • Data Requirements ‌ • The data referred to in this document are encounter data – a record of health care services, health conditions and products delivered for Massachusetts Medicaid managed care beneficiaries. An encounter is defined as a visit with a unique set of services/procedures performed for an eligible recipient. Each service should be documented on a separate encounter claim detail line completed with all the data elements including date of service, revenue and/or procedure code and/or NDC number, units, and MCE payments/cost of care for a service or product. • All encounter claim information must be for the member identified on the claim by Medicaid ID. Claims must not be submitted with another member’s identification (e.g., xxxxxxx claims must not be submitted under the Mom’s ID). • All claims should reflect the final status of the claim on the date it is pulled from the MCE’s Data Warehouse. • For MassHealth, only the latest version of the claim line submitted to MassHealth is “active”. Previously submitted versions of claim lines get offset (no longer “active” with MassHealth) and payments are not netted. • An encounter is a fully adjudicated service (with all associated claim lines) where the MCE incurred the cost either through direct payment or sub-contracted payment. Generally, at least one line would be adjudicated as “paid”. All adjudicated claims must have a complete set of billing codes. There may also be fully adjudicated claims where the MCE did not incur a cost but would otherwise like to inform MassHealth of covered services provided to Enrollees/Members, such as for quality measure reporting (e.g., CPT category 2 codes for A1c lab tests and care/patient management). • All claim lines should be submitted for each Paid claim, including zero paid claim lines (e.g., bundled services paid at an encounter level and patient copays that exceeded the fee schedule). Denied lines should not be included in the Paid submission. Submit one encounter record/claim line for each service performed (i.e., if a claim consisted of five services or products, each service should have a separate encounter record). Pursuant to contract, an encounter record must be submitted for all covered services provided to all enrollees. Payment amounts must be greater than or equal to zero. There should not be negative payments, including on voided claim lines. • Records/services of the same encounter claim must be submitted with same claim number. There should not be more than one active claim number for the same encounter. All paid claim lines within an encounter must share the same active claim number. If there is a replacement claim with a new version of the claim number, all former claim lines must be replaced by the new claim number or be voided. The claim number, which creates the encounter, and all replacement encounters must retain the same billing provider ID or be completely voided. • Plans are expected to use current MassHealth MCE enrollment assignments to attribute Members to the MassHealth assigned MCE. The integrity of the family of claims should be maintained when submitting claims for multiple MCEs (ACOs/MCO). Entity PIDSL, New Member ID, and the claim number should be consistent across all lines of the same claim. • Data should conform to the Record Layout specified in Section 3.0 of this document. Any deviations from this format will result in claim line or file rejections. Each row in a submitted file should have a unique Claim Number + Suffix combination. • A feed should consist of new (Original) claims, Amendments, Replacements (a.k.a. Adjustments) and/or Voids. The replacements and voids should have a former claim number and former suffix to associate them with the claim + suffix they are voiding or replacing. See Section 2.0, Data Element Clarifications, for more information. • While processing a submission, MassHealth scans the files for the errors. Rejected records are sent back to the MCEs in error reports in a format of the input files with two additional columns to indicate an error code and the field with the error. • Unless otherwise directed or allowed by XxxxXxxxxx, all routine monthly encounter submissions must be successfully loaded to the MH DW on or before the last day of each month with corrected rejections successfully loaded within 5 business days of the subsequent month for that routine monthly encounter submission to be considered timely and included in downstream MassHealth processes. Routine monthly encounter submissions should contain claims with paid/transaction dates through the end of the previous month.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.