DRYWALL CEILING Sample Clauses

DRYWALL CEILING a. Carrying channel at 24" on center. b. 1-1/2" cold-rolled carrying channel at 48" on center with hanger wire spaced a maximum of 48" on center along carrying channel. c. 5/8" gypsum wallboard. d. Seismic bracing as required per the Uniform Building Code and as noted on drawings. e. All joints and surfaces shall be taped and sanded smooth to receive primer and paint. (Note: no texture; all painted surfaces shall be 'smooth'). f. Locate all mechanical and electrical equipment requiring access in 2' x 2' lay-in ceiling to avoid access doors in gypsum board ceilings, where possible. SCHEDULE 2 -6- PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems] TENANT IMPROVEMENT STANDARD SPECIFICATIONS XXXXXX XXXXXX CENTER -------------------------------------------------------------------------------- CARRIER XXXXXXX PROJECT NO. 4246.00 MAY 4, 1999 (DRAFT)
AutoNDA by SimpleDocs
DRYWALL CEILING a. Carrying channel at 24” on center.

Related to DRYWALL CEILING

  • Ceiling 8.5.1 Single Tenanted Floors

  • FLOORING Grade and quality of carpeting to be selected by Landlord, with color to be selected by Tenant from those offered by Landlord.

  • Ceilings The obligation of Sellers to indemnify the Buyer Indemnitees pursuant to (A) Sections 9.02(a)(i) (other than with respect to any breach of the Fundamental Representations, a failure to perform any Post-Closing Covenant or the special warranty contained in Section 3.01(c)) shall not exceed, in the aggregate fifteen percent (15%) of the unadjusted Purchase Price, and (B) Section 9.02(a)(viii) shall not, with respect to any Property affected by the failure to obtain the applicable Third Party Consent, exceed the Allocated Value of such Property.

  • Walls Sheetrock (drywall) damage should be patched and fire-taped so that there are no holes in either office or warehouse.

  • GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.

  • Partitions (a) Partitions within the Premises shall have 2” gypsum board on each sided of 3-5/8” metal studs, 16’ on center, taped and spackled. Partitions between the Premises, corridor(s) and between the Premises and adjacent space, shall have 5/8” fire code gypsum board, taped and spackled, on each side of 3-5/8” metal studs, 16” on center above finished ceiling to underside of metal deck. Demising partitions and corridor partitions to have thermofibre insulation installed within, and to be constructed from floor to underside of metal deck above.

  • Windows Windows in the Premises shall not be covered or obstructed by Lessee. No bottles, parcels or other articles shall be placed on the windowsills, in the halls, or in any other part of the Building other than the Premises. No article shall be thrown out of the doors or windows of the Premises.

  • Exterior Tenant shall not place or cause to be placed on the exterior of the Premises, or visible from the exterior of the Premises, or upon the roof or on any exterior door or wall or on any part of the Common Areas, any sign, awning, canopy, marquee, advertising matter, decoration, lettering, or any other thing of any kind (exclusive of the signs, if any, which may be provided for in the Tenant Improvements), without the prior written consent of Landlord.

  • NIGHTLY a. All floors in Group A to be swept, wet mopped and rinsed.

  • Roof Any Tenant-installed equipment must be removed with all roof penetrations properly repaired by a licensed roofing contractor approved by Landlord. Leaks arising from any Tenant-installed equipment or roof penetrations must be fixed in accordance with Landlord’s maintenance and repair recommendations.

Time is Money Join Law Insider Premium to draft better contracts faster.