Field Trips Orange COUNTY funds may not be used to support any overnight and/or out of Central Florida travel, unless approved by the COUNTY’S Manager of the CCC or designee in advance. The AGENCY must have on file for field trip(s) that each participant, adult or minor, must have a signed release of liability form releasing the COUNTY from any liability. If the participant is a minor, the release must be signed by a parent/guardian. Central Florida is defined as Orange, Osceola, Seminole, Brevard, Lake, Polk, and Volusia Counties.
Multi-year Planning Targets Schedule A may reflect an allocation for the first Funding Year of this Agreement as well as planning targets for up to two additional years, consistent with the term of this Agreement. In such an event, the HSP acknowledges that if it is provided with planning targets, these targets: a. are targets only, b. are provided solely for the purposes of planning, c. are subject to confirmation, and d. may be changed at the discretion of the Funder in consultation with the HSP. The HSP will proactively manage the risks associated with multi-year planning and the potential changes to the planning targets; and the Funder agrees that it will communicate any changes to the planning targets as soon as reasonably possible.
Technical Objections to Grievances It is the intent of both Parties of this Agreement that no grievance shall be defeated merely because of a technical error, other than time limitations in processing the grievance through the grievance procedure. To this end, an arbitration board shall have the power to allow all necessary amendments to the grievance and the power to waive formal procedural irregularities in the processing of a grievance, in order to determine the real matter in dispute and to render a decision according to equitable principles and the justice of the case.
Selection Planning Prior to the issuance to consultants of any requests for proposals, the proposed plan for the selection of consultants under the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Consultant Guidelines. Selection of all consultants’ services shall be undertaken in accordance with such selection plan as shall have been approved by the Association, and with the provisions of said paragraph 1.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Mail Order Catalog Warnings In the event that, the Settling Entity prints new catalogs and sells units of the Products via mail order through such catalogs to California consumers or through its customers, the Settling Entity shall provide a warning for each unit of such Product both on the label in accordance with subsection 2.4 above, and in the catalog in a manner that clearly associates the warning with the specific Product being purchased. Any warning provided in a mail order catalog shall be in the same type size or larger than other consumer information conveyed for such Product within the catalog and shall be located on the same display page of the item. The catalog warning may use the Short-Form Warning content described in subsection 2.3(b) if the language provided on the Product label also uses the Short-Form Warning.
Project Steering Committee 1. For a sound implementation and management of the project, a steering committee shall be set up in line with provisions of the programme manual. 2. The steering committee is the decision-making body of the project and it shall be composed by representatives of the LP and all PPs duly authorised to represent the respective LP and PP institutions. It shall be chaired by the LP and it shall meet on a regular basis. Associated partners shall be invited to take part in the steering committee in an advisory capacity. External key stakeholders may also be invited to take part to one or more meetings in an observer/advisory capacity. 3. The steering committee shall at least: a. be responsible for monitoring and validating the implementation of the project and the achievement of the planned results as in the approved application form; b. perform the financial monitoring of the project implementation and to decide on any budget modifications as in § 11 of this agreement; c. monitor and manage deviations of the project implementation; d. decide on project modifications (e.g. partnership, budget, activities, and duration) if needed; e. be responsible for the settlement of any disputes within the partnership (as stipulated in § 22 of this agreement). 4. Further aspects, including the creation of sub-groups or task forces, may be set out in the rules of procedure of the steering committee.
DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
EPP query-‐command RTT Refers to the RTT of the sequence of packets that includes the sending of a query command plus the reception of the EPP response for only one EPP query command. It does not include packets needed for the start or close of either the EPP or the TCP session. EPP query commands are those described in section 2.9.2 of EPP RFC 5730. If the RTT is 5-‐times or more the corresponding SLR, the RTT will be considered undefined.