Easement Plotting Sample Clauses

Easement Plotting. XXXX and WG will provide re-establishment of recorded easement deeds as exceptions in preliminary title reports for up to eight (8) Assessor’s Parcel Number (APN) parcels. These easement locations will be compiled to the Base Map described in Task 2.1.
AutoNDA by SimpleDocs
Easement Plotting a. Create Base Map i. Acquire GIS data from City of Rollingwood, Xxxxxx County, City of Austin, and other available resources 1. To include parcel identification and lot lines b. Create easement database i. Create easements using survey monuments, planimetric and right of way data ii. Mapping and plotting the easements 1. Data-based easement mapping

Related to Easement Plotting

  • Easement To the extent applicable, Owner agrees to grant to Bell a non-exclusive easement and statutory right of way and/or a path to the property line from the Building, as the case may be and in or through the Equipment Space if it is determined that a fibre optic cable or such other Equipment must be installed to the Building and/or in the Equipment Space. Owner and Bell shall in advance, agree upon a suitable location to install the fibre optic cable on the property of the Owner. Owner agrees to allow Bell to register, at Xxxx'x expense, the easement and right of way, and/or notice of this Agreement

  • Utility Easements There is hereby reserved for the use and benefit of the Association and all Owners, non-exclusive easements within the Common Areas for the location, installation and maintenance of utilities and drainage facilities of convenience or necessity as may be requested or required by the Association or any Owner provided that the grant thereof does not unreasonably interfere with the normal operation, improvement, and use of the Common Area and the buildings constructed within the Center, and no affirmative monetary obligation is imposed upon the Owners (other than the Owner benefiting from such easement). The Declarant (and the Board where there no longer is a Declarant) shall have the authority to grant easements or rights-of-way for utilities over the Common Areas as necessary to serve the Common Areas and/or the Parcels. The Owner of any Parcel and any of his Occupants or licensees shall have the right at all reasonable times to enter upon the land subject to said easements and to install, maintain, operate, repair and service utilities and drainage facilities thereon for the use and benefit of his Parcel; provided, however, any such Person shall restore said land, at his own expense, as nearly as practicable, to the same condition as existed prior to such entry and shall comply with the provisions of Section 11.6. The Owner of any Parcel shall have the right to assign the benefit and use of any such easement to any public or private utility company, agency or district for the purpose of installing, operating, repairing, servicing and maintaining utilities or drainage facilities and enforcing the easement rights. For purposes hereof, "utilities" shall include electricity, gas mains and lines, water distribution lines, storm water sewers, sanitary sewers, telephone, fiberoptic, cable TV, and telegraph cables and lines, and other similar or related facilities commonly regarded as utilities. All storm drains, utility lines, transformers and meters shall be maintained under the terms of this Declaration in a safe and good working condition by the party responsible therefor. No grantee of a utility easement shall in the use, construction, reconstruction, operation, maintenance or repair of any storm drains, utility lines, transformers and meters in any way interfere, obstruct or delay the business of the grantor of said easement or any other Owner or Occupant, or the public access to and from said business or interfere, obstruct or delay in any way the receiving of merchandise by said grantor or any Owner or Occupant. EXHIBIT F -35- PEREGRINE SYSTEMS CORPORATE CENTER [Peregrine Systems]

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Easements All easements, rights-of-way or use, rights, strips and gores of land, streets, ways, alleys, passages, sewer rights, water, water courses, water rights and powers, air rights and development rights, and all estates, rights, titles, interests, privileges, liberties, servitudes, tenements, hereditaments and appurtenances of any nature whatsoever, in any way now or hereafter belonging, relating or pertaining to the Land and the Improvements and the reversion and reversions, remainder and remainders, and all land lying in the bed of any street, road or avenue, opened or proposed, in front of or adjoining the Land, to the center line thereof and all the estates, rights, titles, interests, dower and rights of dower, curtesy and rights of curtesy, property, possession, claim and demand whatsoever, both at law and in equity, of Borrower of, in and to the Land and the Improvements and every part and parcel thereof, with the appurtenances thereto;

  • Land The real property described in Exhibit A attached hereto and made a part hereof (the “Land”);

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!