Endurance Testing Sample Clauses

Endurance Testing. The first article unit shall be tested as follows to determine the capabilities to meet capacity, purity and delivery pressure requirements under the specified environmental conditions. During this test, the first article unit shall be operated in the manner outlined in the technical manual. The system shall be operationally tested for a minimum of 720 hours to determine conformance to the capacity, purity, delivery pressure, duty cycle and start up time specified in section 3. During this time, the first article unit shall be operated for a minimum of 4 hours under each of the conditions listed in paragraph 4.6.6.1 through 4.6.6.6 to demonstrate conformance to the required capacity, purity and delivery pressure. The capacity of the nitrogen generator shall be determined by the ASME flow nozzle method as outlined in ASME PTD 9. Alternately, the generator can be set up to fill a container of known volume to 5000 psig. The elapsed time to fill the container and the purity of the gas shall then be recorded and the fill rate calculated. The test is considered a failure if the fill rate is less than that specified in paragraph 3.3.1 at the purity requirement of paragraph 3.3.2. Nitrogen samples shall be taken and tested in accordance with CGA G-10.1 every 8 hours and forwarded to a certified laboratory for testing to ensure that the nitrogen purity is in accordance with paragraph 3.3.2. Additionally, the first article unit shall be subjected to the combined contaminant levels noted in paragraph 3.6.2 to determine its conformance with paragraph 3.3.2. Throughout the test the first article unit shall demonstrate its capability to deliver the product at the pressure requirements of paragraph 3.3.3. (CDRL A010)
AutoNDA by SimpleDocs

Related to Endurance Testing

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • INSPECTION/TESTING All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Health plan specification The Employer will require health plans participating in the Group Insurance Program to develop and implement health promotion and health education programs for State employees and their dependents.

Time is Money Join Law Insider Premium to draft better contracts faster.