Energy Fuel Consumption Sample Clauses

Energy Fuel Consumption. 6.1 At MCR at sea trial condition *****
AutoNDA by SimpleDocs

Related to Energy Fuel Consumption

  • Fuel Upon redelivery of the Aircraft to Lessor, an adjustment will be made in respect of fuel on board on the Previous Delivery Date and the Expiry Date at the price then prevailing at the Redelivery Location.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Mission Block Fuel The block fuel for a stage length of 2,050 nautical miles in still air (representative of a route with a 4.4 hour flight time from a sea level airport) with a zero fuel weight of 154,221 kilograms, using the conditions and operating rules defined below, shall not be more than the following guarantee value: NOMINAL: [*] Kilograms TOLERANCE: [*] Kilograms GUARANTEE: [*] Kilograms Conditions and operating rules:

  • Electric N/A Electric from Clark from PP6 to DCU-843 2 N/A ------------------------------------------------------------------------------------------------------------------ N/A Electric from Clark from PP6 to Feed Tanks 4 N/A ------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • Transportation Costs The cost of transporting a Warranted Part claimed to be defective to the facilities designated by the Seller and for the return therefrom of a repaired or replaced Warranted Part shall be borne by the Buyer.

  • Utility Services The Owner represents that, to the best of its knowledge, all utility services required to construct and operate the Project (including, without limitation, public water, sewer and electricity) are currently available to the Property in the capacities required to operate the Project. No work need be performed by or on behalf of the Developer to make such utilities available to the Property for the construction or operation of the Project, except for the matters, if any, set forth on Exhibit "D". Copies of letters from the providers of such utility services confirming such availability are annexed hereto as Exhibit "G".

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

Time is Money Join Law Insider Premium to draft better contracts faster.