Engineering and Planning – Electric Distribution System Sample Clauses

Engineering and Planning – Electric Distribution System. 5.3.1. The “Beyond-the-Meter” electrical system shall be designed to meet applicable code and regulatory requirements of any inspecting agency for installation of service equipment. Required permits must be obtained and shall be available for inspection by PG&E. 5.3.2. PG&E will normally design and install a single phase, 120/240 volts, 100- ampere electric meter service equipment at each individual MH-Space. Any requests for service modifications beyond the 100-ampere electric service or relocations beyond what is being provided by the MHP Rebuild Program will be handled under PG&E’s current Rules and Tariffs.
AutoNDA by SimpleDocs
Engineering and Planning – Electric Distribution System. 5.3.1. The “Beyond-the-Meter” electrical system shall be designed to meet applicable code and regulatory requirements of any inspecting agency for installation of service equipment. Required permits must be obtained and shall be available for inspection by Liberty Utilities. 5.3.2. Liberty Utilities will normally design and install a single phase, 120/240 volts, 100 ampere electric meter service equipment at each individual MHP-Space. Any requests for service modifications beyond the 100-ampere electric service or relocations beyond what is being provided by the MHP Program will be handled under Liberty Utilities’ current Rules and Tariffs.
Engineering and Planning – Electric Distribution System. 5.3.1. The “Beyond-the-Meter” electrical system shall be designed to meet applicable code and regulatory requirements of any inspecting agency for installation of service equipment. Required permits must be obtained and shall be available for inspection by electric provider.
Engineering and Planning – Electric Distribution System. 5.3.1. MHP Owner/Operator and its Contractor will design the “Beyond-the-Meter” electrical system and secure any necessary permits. Contractor to meet the code and regulation requirements of the inspecting agency for installation of service equipment. 5.3.2. SDG&E ’s will normally design and install a single phase, 120/240 volts, 100- ampere electric meter service equipment at each individual MH-Space. Any requests for service modifications beyond the 100-ampere electric service or relocations beyond what is being provided by the MHP Program will be handled under SDG&E ’s current Rules and Tariffs.

Related to Engineering and Planning – Electric Distribution System

  • Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Business Continuity Planning Supplier shall prepare and maintain at no additional cost to Buyer a Business Continuity Plan (“BCP”). Upon written request of Buyer, Supplier shall provide a copy of Supplier’s BCP. The BCP shall be designed to ensure that Supplier can continue to provide the goods and/or services in accordance with this Order in the event of a disaster or other BCP-triggering event (as such events are defined in the applicable BCP). Supplier’s BCP shall, at a minimum, provide for: (a) the retention and retrieval of data and files; (b) obtaining resources necessary for recovery, (c) appropriate continuity plans to maintain adequate levels of staffing required to provide the goods and services during a disruptive event; (d) procedures to activate an immediate, orderly response to emergency situations; (e) procedures to address potential disruptions to Supplier’s supply chain; (f) a defined escalation process for notification of Buyer, within two (2) business days, in the event of a BCP-triggering event; and (g) training for key Supplier Personnel who are responsible for monitoring and maintaining Supplier’s continuity plans and records. Supplier shall maintain the BCP and test it at least annually or whenever there are material changes in Supplier’s operations, risks or business practices. Upon Xxxxx’s written and reasonable request, Supplier shall provide Buyer an executive summary of test results and a report of corrective actions (including the timing for implementation) to be taken to remedy any deficiencies identified by such testing. Upon Xxxxx’s request and with reasonable advance notice and conducted in such a manner as not to unduly interfere with Supplier’s operations, Supplier shall give Buyer and its designated agents access to Supplier’s designated representative(s) with detailed functional knowledge of Supplier’s BCP and relevant subject matter.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Multi-Year Planning The CAPS will be in a form acceptable to the LHIN and may be required to incorporate (1) prudent multi-year financial forecasts; (2) plans for the achievement of performance targets; and (3) realistic risk management strategies. It will be aligned with the LHIN’s then current Integrated Health Service Plan and will reflect local LHIN priorities and initiatives. If the LHIN has provided multi-year planning targets for the HSP, the CAPS will reflect the planning targets.

  • Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.

  • Transition Planning The AGENCY will be responsible for the development of the student’s Transition Plan, which begins upon entry and is completed prior to the student’s exit.

  • Selection Planning Prior to the issuance to consultants of any requests for proposals, the proposed plan for the selection of consultants under the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Consultant Guidelines. Selection of all consultants’ services shall be undertaken in accordance with such selection plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!